SourcingAI
Try for free
Powered by Made-in-China.com
Metal Powder Gear, Recirculating-Ball Steering Gear
US$0.10-5.00
100 Pieces
Sample price:US$20.00/piece.Request sample

Product profile

Customization

Available

Certification

IATF16949

Material

as Required

Model NO.

ZKAB01

Type

as Required

Process

Powder Metallurgy

Package

Box, Shipping Pallets or as Required

Keywords 1

Powder Metallurgy Parts

Keywords 2

Nonstandard Parts

Transport Package

as Required

Specification

as Required

Trademark

as Required

Origin

Jiangsu

HS Code

8479909090

Production Capacity

50000 Pieces/Day

Key features

Customized Process & Material: Material and process tailored to customer requirements with powder metallurgy and CNC machining.
High Precision Tolerances: Achievable tolerances up to IT 5-7 after sizing, suitable for complex shapes and gears.
Self-Lubricating Capability: Interconnected porosity filled with oil for constant lubrication without external additives.
100% Quality Inspection: Every product undergoes size, appearance, and pressure testing with Carl Zeiss equipment.
Fast Response Time: Sales team replies within 12 hours to confirm details and provide estimated quotes.
Cost Effective Manufacturing: Saves material and reduces production cost by minimizing machining operations.
Eco-Friendly Production: Low material waste, recyclable products, and high energy efficiency in sintering process.
OEM Service Available: Full OEM service including mold building and fixtures based on samples or drawings.

Company profile

Taizhou Kecheng Automotive Components and Parts Co., Ltd.
High Repeat Buyers ChoiceYears of Export ExperiencePatents Awarded
Business Type: Manufacturer/FactoryExport Year: 2020-09-01Nearest Port: shanghaiAverage Response Time: ≤9.10hTerms of Payment: LC, T/T, Western UnionInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

AI-Powered supplier vetting

SummaryThe supplier is identified as a professional technical supplier offering 3D software design and multiple customization options. It has three R&D engineers, launched new products in the past year, maintains quality assurance, material traceability, corrective-action and complaint-handling procedures, and has valid manufacturing contracts with related subcontractors. Production-related evidence is limited to one production line, in-stock capacity, and stated lead times within 15 working days. The supplier has 14 years of international trade experience but no overseas agents or branches, overseas warehouse, overseas showroom, or offline trade-show participation. Certification details are recorded only as “Others,” and no environmental impact assessment report is available. Financial records are referenced for recent years, but the provided information does not contain sufficient financial-performance detail to assess credibility. No Fortune 500 customer cooperation is reported.
Supplier typeThe supplier is explicitly identified as a professional technical supplier. Its stated business scope includes power generation, transmission, and power supply activities subject to relevant approvals, indicating a technically oriented and regulated operating scope.
After-Sales capabilityThe supplier has clear procedures and followed records for corrective and preventive actions and customer complaint handling. However, it has no overseas warehouse, showroom, overseas agent or branch, and offers overseas services in zero countries, which limits demonstrated overseas service coverage.
R&D capabilityThe supplier provides 3D software design services, has three R&D engineers, and launched new products during the past year. Its lack of an available SDK is a stated limitation, but the available evidence supports active design and product-development capability.
Production capacityThe supplier has valid manufacturing contracts with each related subcontractor, in-stock capability, and reported peak- and off-season lead times within 15 working days. Nevertheless, only one production line is reported, so the evidence supports operational capability but not broad manufacturing scale.
Customization capabilityThe supplier explicitly supports customization from samples, designs, full customization, minor customization, and flexible customization, as well as 3D software design services. This directly demonstrates broad customization support.

Product Q&A

Q:What is the type of payment?
A:
Usually you should prepay 50% of the total amount. The balance should be pay off before shipment.
Q:How to guarantee the high quality?
A:
100% inspection. We have Carl Zeiss high-precision testing equipment and testing department to make sure every product of size,appearance and pressure test are good.
Q:How long will you give me the reply?
A:
we will contact you in 12 hours as soon as we can.
Q:How about your delivery time?
A:
Generally, it will take 25 to 35 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. and if the item was non standard, we have to consider extra 10-15days for tooling/mould made.
Q:Can you produce according to the samples or drawings?
A:
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Send Inquiry

*To:Taizhou Kecheng Automotive Components and Parts Co., Ltd.Taizhou Kecheng Automotive Components and Parts Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like