Powered by Made-in-China.com
Robust Schedule 40 Galvanized EMT Pipe for Gas Lines with 10FT or 20FT Customized
US$1.75
3,000-4,999 Pieces
US$1.52
5,000+ Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableType
EMT PipeTechnique
Galvanized PipeModel NO.
Emt PipeSurface Treatment
Pre-Galvanized or Hot Dipped GalvanizedUsage
CustomizableSection Shape
OvalSize
1/2 Inch - 6 InchLength
10FT / 20FT or CustomizedBrand
OEM\ODMConnection Method
Accessory ConnectionTransport Package
BoxSpecification
1/2 Inch - 6 InchTrademark
OEM\ODMOrigin
ChinaKey features
Customizable Length: Available in 10FT, 20FT, or fully customized lengths to meet specific project needs.
Dual Galvanized Options: Offers both pre-galvanized and hot-dipped galvanized surface treatments for superior corrosion resistance.
OEM/ODM Branding: Supports custom logo placement and packaging with full OEM and ODM service capabilities.
Wide Size Range: Sizes available from 1/2 inch to 6 inches to suit various piping system requirements.
Versatile Applications: Ideal for gas lines, water supply, scaffolding, and industrial systems requiring robust performance.
Secure Connection: Features accessory connection method ensuring reliable and secure joints for diverse piping systems.
Global Certifications: Certified with ISO9001, ISO14001, ISO45001, ETL, CE, TUV, and SGS for international quality standards.
Cost-Effective Durability: Combines long-term durability with low maintenance requirements for dependable service.
Company profile
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Gaungzhou Port,Shenzhen Port,Foshan Gaoming Port.Average Response Time: ≤3.43h CertifiedTerms of Payment: T/T
About Our Factory & Business Background
AddressNo. 401a, Building 30, Fufeng Plaza, No. 1 Foping 4th Road, Guicheng Street, Nanhai District, Foshan City, Guangdong, China
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity6pcs
Supply Chain Partners16
Our Production Capability & Technical Expertise
Main ProductsPVC Pipe and Fitting, HDPE Pipe and Fitting, EMT/IMC/Rmc Pipe and Fitting, PPR Pipe and Fitting
R&D Engineers1 people
Our Industry Experience & Global Business Record
Main MarketsNorth America, Europe, Southeast Asia/ Mideast, Domestic
Repeat Buyers Choice80%~100%
Annual Export Revenue1,680,000 RMB
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Product Q&A
Q:What is your minimum order quantity?
A:
The minimum order quantity for our OEM is usually 3000 meters.
Q:What is your usual delivery time?
A:
The delivery time is approximately 20 to 30 days.
Q:What is the port of shipment?
A:
We ship through Shenzhen Futian Port or Guangzhou Nansha Port.
Q:What are your payment terms?
A:
We accept 30% advance payment via wire transfer, 70% payment during shipment, or 100% payment via letter of credit.
Q:Where is your company located?
A:
Our company is located in Foshan City, Guangdong Province, China. If you want to visit, we warmly welcome you.
Send Inquiry
*To:
Foshan SDSH Material Technology Co., Ltd.
Foshan SDSH Material Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Schedule 40 Galvanized Pipe Hot Dipped Galvanized Pipe, 1/2" to 8" Inch for Structural and Plumbing Systems
US$500.00-560.00
5 Tons(MOQ)
Schedule 40 ERW Carbon Steel Pipe for Natural Gas
US$400.00-550.00
15 Tons(MOQ)
304 Stainless Steel Threaded Pipe Nipple 1" NPT Both Ends for Gas Pipeline with Schedule 40 Wall
US$1,399.00-1,499.00
1 Ton(MOQ)
Galvanized Steel Pipe Schedule 40 for Water Gas Plumbing Projects
US$500.00-620.00
25 Tons(MOQ)
Gi Pipe Hot Dipped Galvanized Steel Pipe ASTM A53 Q235 Schedule 40 for Construction Water Gas
US$580.00-600.00
25 Tons(MOQ)
Schedule 40 ERW Steel Pipe for Fire Protection Pipeline with UL
US$480.00-600.00
25 Tons(MOQ)
High-Quality Large Schedule 40 Carbon Steel Pipe for Oil and Gas
US$500.00-800.00
2 Tons(MOQ)
ASTM A53 Gr. B Schedule 40/80 Black Carbon Seamless Steel Pipe for Oil and Gas Pipe Line
US$900.00-1,100.00
1 Ton(MOQ)
ASTM A53 2.5 Inch Galvanized Steel Pipe 48.6mm Schedule 40 Gi Steel Pipe for Scaffolding and Greenhouse Frame
US$550.00-699.00
25 Tons(MOQ)
ASTM A53 Grade B Hot Dipped Galvanized Steel Round Pipe Schedule 40 80 for Water and Gas
US$520.00-580.00
2 Tons(MOQ)
ASTM A53 Schedule 40 Hot Dipped Galvanized Steel Pipe for Construction Projects
US$520.00-600.00
1 Ton(MOQ)



















