SourcingAI
Try for free
Powered by Made-in-China.com
Long Lead PP Float Level Switch - Suitable for Water Level Control in Air Coolers
US$1.59-2.59
100 Pieces
Sample price:US$8.00/piece.Request sample

Product profile

Customization

Available

Type

Floating Ball

Contact

Contact

Model NO.

LH-FS403

Output Signal Type

Switching Type

Production Process

Injection

Feature

Low Temperature Resistant

Material

Plastic

IP Rating

IP67

Certification

ISO

Customized

Customized

Temperature Range

-10~+85℃

Transport Package

Carton

Specification

5*10*5cm

Origin

Ningbo, Zhejiang

Production Capacity

200000000

Key features

Wide Material Selection: Available in PP, PVDF, NBR, and Stainless Steel 304 for diverse liquid environments.
Customizable Dimensions: Float size, cable length, and switch configuration can be tailored to specific needs.
Flexible Installation: Supports top, side, and bottom mounting with flange, thread, or lock nut assembly.
IP67 Protection Rating: Ensures reliable operation in indoor, outdoor, and vibration-prone environments.
ISO Certified Quality: Manufactured under strict quality control with corrosion resistance and strength testing.
1-Year Warranty Coverage: Includes free repair or replacement for non-human damage with lifelong technical support.
Versatile Application: Suitable for edible water, oil, diesel, and corrosive liquids in industrial and household settings.

Company profile

Ningbo Beilun Bonsen Auto Electron Co., Ltd.
High Repeat Buyers ChoiceYears of Export ExperienceMulti-language PioneerExhibition Experience
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2015-06-30Nearest Port: ningbo, shanghai, tianjingAverage Response Time: ≤6.07hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP

AI-Powered supplier vetting

SummaryThe supplier is a limited company focused on Auto LED Lights, with reported exports to broad international markets and ten years of export experience. Evidence indicates customization from samples, designs, minor changes, and flexible requirements, plus new products launched during the past year. Production information states 600,000 LED headlight bulb sets annually, while the company description reports four production lines, more than 100 skilled workers, ISO9001:2000-approved production lines, CE and E-mark certificates, and OEM service; however, some of these claims conflict with structured data showing seven total employees and no OEM service for popular brands. Financial records are indicated for 2021–2023, but no financial results are provided. After-sales, traceability, environmental, and service-quality controls remain insufficiently documented. The supplier has no overseas showroom, agent, or branch, but has participated in an offline trade show.
Supplier typeThe supplier is identified as a limited company, not part of a larger company group, and its stated product scope is Auto LED Lights. The supplier also reports zero cooperative suppliers and seven total employees in the structured profile.
CertificationsThe company description states that products are made on ISO9001:2000-approved production lines and that the supplier holds CE and E-mark certificates. These certifications are explicitly claimed, although no certificate documents or validity details are provided.
R&D capabilityThe supplier reports one R&D engineer and new products during the past year, supporting some innovation activity. However, it has no available SDK and no ODM service, so the evidence does not establish broad or advanced innovation capability.
Production capacityReported production capacity is 600,000 LED headlight bulb sets annually, with a stated off-peak lead time within 15 working days. The company description claims four production lines and more than 100 skilled workers, but this conflicts with the structured profile listing seven total employees; therefore, capacity is evidenced but the organizational scale is inconsistent.
Customization capabilityThe supplier explicitly supports customization from samples, customization from designs, minor customization, and flexible customization. The company also claims OEM service, although the structured record says it does not provide OEM service for popular brands; standard customization capability is nevertheless clearly supported.
Client casesThe supplier reports ten years of exporting, 90% of sales from exports, broad export markets, and participation in the Shanghai Frankfurt Auto Parts Show. Its description states that products and services were approved by clients in the USA, Austria, Europe, and Asia, but no named customers or verifiable case details are provided.

Product Q&A

Q:What materials are available for the float level switch?
A:
We offer a variety of materials including PP, PVDF, NBR, and Stainless Steel 304 to adapt to different liquids and environmental conditions.
Q:Can the product be customized?
A:
Yes, the switch is fully customizable regarding float size, cable length, switch configuration, and assembly options to fit your specific application needs.
Q:How does the float switch work?
A:
The float rises and descends with the fluid level, activating a reed switch to mark key thresholds. It can be configured for normally open or normally closed states.
Q:What is the warranty period?
A:
We provide a 1-year free warranty covering non-human damage, with free repair or replacement available.
Q:What are the installation options?
A:
The switch supports flexible installation including top, side, and bottom mounting, with assembly methods such as flange, thread, or lock nut.

Send Inquiry

*To:Ningbo Beilun Bonsen Auto Electron Co., Ltd.Ningbo Beilun Bonsen Auto Electron Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like