Powered by Made-in-China.com

American Construction Steel Forged Fixed Scaffolding Double Clamp
US$3.60-4.05
100 Pieces
Sample price:US$2.50/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-FD-016Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldSteel
Q235Standard
En74-1/BS1139Weight
2.1kgFinsh
Zinc Plate or Hot Dipped GalvanizedSize
48.3*60.3mmKeyword01
American TypeKeyword02
Forged CouplerTransport Package
Bag / PalletSpecification
20pcs/bag 50bag/palletTrademark
U T MOrigin
ChinaHS Code
7308400000Production Capacity
500000pieces/YearKey features
Forged Construction: Manufactured using drop forged technology for superior strength and durability.
Corrosion Resistance: Available with Zinc Plated or Hot Dipped Galvanized finishes for long-lasting protection.
Multi-Standard Compliance: Meets EN74, BS1139, CE standards and fits domestic requirements with SGS testing.
OEM Customization: Customizable logo, sticker, and specific product styles including American, British, German, and Japanese types.
High Strength Bolts: Equipped with 8.8 grade high strength bolts to prevent nut loss and ensure secure locking.
Versatile Application: Suitable for high-rise buildings, bridges, tunnels, and temporary viewing stands.
One-Stop Service: 24-hour support, online installation guidance, and design solutions provided by experienced engineers.
Proven Quality: 16 years of industry experience with EN, BS, and AS certifications for global export markets.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.10hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all products are fully tested before despatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Easy Scaffolding Q235 BS1139 En74 Pressed Double Single Drop Forged Swivel Grder Board Clamp Fitting Coupler
US$0.80-1.20
100 Pieces(MOQ)
SGS Tested Q355 Drop Forged Fixed Double Scaffolding Coupler Clamp for Malaysian Market
US$0.50-1.50
1 Piece(MOQ)
American Type 48.3mm En74 Standard Right Angle Coupler Scaffolding Double Clamp
US$2.45-2.70
100 Pieces(MOQ)
Hot Drop Forged Scaffolding 60.3mm Double Clamp American Type
US$3.60-4.05
100 Pieces(MOQ)
Scaffold Pipe Fitting Accessories Drop Forged Pressed Scaffolding Clamp for Construction Tubular Scaffolding
US$0.60-2.50
1,000 Pieces(MOQ)
Construction Steel Forged Pipe Clamps Fittings Heavy Duty American Scaffold Clamp
US$2.45-2.70
100 Pieces(MOQ)
Construction Steel Tubular Scaffolding Accessories Drop Forged Swivel Coupler/Clamp
US$1.00
10 Pieces(MOQ)
Wholesale Custom Scaffolding Fixed Drop Forged Scaffolding Double Clamp
US$4.44-4.97
100 Pieces(MOQ)
Drop Forged Clamp Fixed Bracing Half Steel Galvanized Construction Forged Scaffolding Coupler
US$2.82-2.85
1,000 Pieces(MOQ)
Adjustable Drop Forged Fixed Clamp with Scaffolding Accessories of Steel
US$0.782
2,750 Pieces(MOQ)
Construction Scaffolding Fittings Korean Pressed Fixed/Double Clamp
US$3.05-3.10
1,000 Pieces(MOQ)
Drop Forged 90 Degree Double Fixed Coupler Scaffolding Swivel Clamp
US$0.75-2.00
2,000 Pieces(MOQ)
Building Construction Scaffolding Drop Forged Steel Fork Head Clamp
US$3.12-3.45
1,000 Pieces(MOQ)
Easy Scaffold Drop Forged 48.3/60.5 89mm 89mm Coupler Fixed Clamp Price Scaffolding Double Clamp
US$1.40-1.50
5,000 Pieces(MOQ)
British Type BS1139 Forged Double Scaffolding Coupler Fixed Clamps Pipe Clips
US$1.50
1,000 Pieces(MOQ)
Pressed Steel Factory Swivel Coupler and Double Coupler Scaffolding Clamps for Scaffolding Construction Material
US$1.20-2.10
1,000 Pieces(MOQ)



















