Powered by Made-in-China.com
Drop Forged Putlog Scaffolding Coupler Single Coupler
US$0.78-0.92100 Pieces

Drop Forged Putlog Scaffolding Coupler Single Coupler
US$0.78-0.92
100 Pieces
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-FP-029Material
SteelType
Wrapover CouplerStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldSteel
Q235Standard
En74-1/BS1139Weight
0.65kgFinsh
Zinc Plate or Hot Dipped GalvanizedSize
48.3mmKeyword01
Wrapover CouplerKeyword02
Forged CouplerTransport Package
Bag / PalletSpecification
30pcs/bag 60bag/palletTrademark
U T MOrigin
ChinaHS Code
7308400000Production Capacity
500000pieces/YearKey features
Durable Galvanized Finish: Available in Zinc Plate, Hot Dipped Galvanized, or Self-color for long-lasting corrosion resistance.
High Strength Bolts: Equipped with 8.8 grade high strength bolts and solid cold riveting for stable structure.
Customizable Logo: OEM service available for permanent logo or sticker customization as per customer requirements.
Wide Size Compatibility: Fits tube diameters from 48.3mm to 63mm with various nut sizes including 21mm, 22mm, and 23mm.
Multiple Style Options: Available in American style, with British, German, and Japanese styles also producible.
Comprehensive Certifications: Meets EN74, BS1139, CE, ISO9001:2000, and SGS standards for global safety compliance.
1-Year Warranty: Includes a 1-year warranty period covering mechanical defects and quality assurance.
Professional Engineering Support: Expert engineers available to provide engineered drawings and challenging scaffolding solutions.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.50hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all prducts are fully tested before despatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Scaffolding Pipe Drop Forged Half Coupler/Single Coupler for Construction BS 1139 En/74 48*48mm Galvanized Tubes
US$1.15-1.90
5,000 Pieces(MOQ)
Galvanized Scaffolding Pipe Drop Forged Half Coupler/Single Coupler for 48mm and 60mm Tube with Factory Price
US$0.50-2.00
1,000 Pieces(MOQ)
Steel Scaffolding Forged Single Coupler Putlog Coupler
US$0.20-2.00
1,000 Pieces(MOQ)
Drop Forged Scaffolding Half Single Coupler with Welded L-Rod
US$1.65-1.70
2,000 Pieces(MOQ)
BS1139 Scaffolding Drop Forged Tube Coupler Clamp
US$0.92-1.00
5,000 Pieces(MOQ)
Types of Clips Scaffolding Single Scaffold Coupler Forged Putlog Coupler
US$1.50
1,000 Pieces(MOQ)
Drop Forged Galvanized Half Coupler, En74 Scaffolding Half Clamp for 48.3mm Scaffold Pipe
US$0.15-0.26
2,000 Pieces(MOQ)
Manufacture Drop Forged Scaffolding Clamp En74 Double Coupler
US$1.45-1.99
1,000 Pieces(MOQ)
Construction Galvanized Drop Forged Single Clamp Scaffolding Half Coupler for Sale
US$4.65-5.25
1,000 Pieces(MOQ)
Drop Forged Single / Putlog / Wrapover Scaffolding Coupler
US$0.78-0.92
100 Pieces(MOQ)
BS1139 En74 Construction Tube Fixed Clamp Pipe Fittings Forged Double Swivel Board Putlog Coupler Scaffolding
US$1.17-1.47
1,000 Pieces(MOQ)
British Standard En74 Scaffolding Putlog Clamp Drop Forged Double Coupler
US$0.50-5.00
500 Pieces(MOQ)
Heavy-Duty Drop Forged Galvanized Scaffolding Clamp Half Coupler
US$1.31-1.35
2,000 Pieces(MOQ)
Construction Scaffolding Fittings Drop Forged Putlog Coupler Dactory Direct Supply
US$0.85-0.86
1,000 Pieces(MOQ)
Shlomi Scaffolding Pipe Drop Forged Half Coupler/Single Coupler for 48mm and 60mm Tube
US$0.50-2.00
1,000 Pieces(MOQ)
Durable Drop Forged Scaffolding Coupler for Secure Connections
US$1.00
100 Pieces(MOQ)
Scaffolding Single Clamp Scaffolding Clamp Drop Forged and Pressed Double Swivel Coupler
US$0.20-2.00
1,000 Pieces(MOQ)
Drop Forged Steel 360 Degree Clamp/Swivel Coupler for European Construction Scaffolding
US$2.02-2.08
1,500 Pieces(MOQ)
Premium Drop Forged Putlog Coupler for Construction Projects
US$1.00
10,000 Pieces(MOQ)



















