Powered by Made-in-China.com
Drop Forged Single/Putlog/Wrapover Scaffolding Coupler for Sale System Building Material
US$0.78-0.92
100 Pieces
Sample price:US$1.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-FP-029Material
SteelType
Wrapover CouplerStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldSteel
Q235Standard
En74-1/BS1139Weight
0.65kgFinsh
Zinc Plate or Hot Dipped GalvanizedSize
48.3mmKeyword01
Wrapover CouplerKeyword02
Forged CouplerTransport Package
Bag / PalletSpecification
30pcs/bag 60bag/palletTrademark
U T MOrigin
ChinaHS Code
7308900000Production Capacity
500000pieces/YearKey features
Durable Galvanized Finish: Zinc plated or hot dipped galvanized surface treatment for long-lasting corrosion resistance.
High Strength Bolts: Equipped with 8.8 grade high strength bolts ensuring stable structure and secure locking.
OEM Logo Customization: Permanent logo or sticker customization available upon customer requirement.
Wide Size Compatibility: Fits scaffolding tubes from 48.3mm to 63mm with various nut sizes including 21mm, 22mm, and 23mm.
Multiple Style Options: Available in American style with options for British, German, and Japanese styles.
Comprehensive Certifications: Meets EN74, BS1139, CE, ISO9001:2000, and SGS standards.
Engineered Drawing Support: Professional engineers available to design challenging scaffolding access solutions.
One-Stop Service: 24-hour support, online installation guidance, and traceability system for all products.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.07hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all products are fully tested before despatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
High Quanlity Building Material Hy Scaffolding Frame System Formwork Construction Material for Sale
US$6.00-14.00
100 Pieces(MOQ)
Building Material Supplier Frame System Scaffolding Hardware Scaffolding Material for Sale
US$6.00-12.50
100 Pieces(MOQ)
ISO Scaffolding for Sale a Scaffolding Plank Frame System Materials
US$78.00-90.00
1 Piece(MOQ)
Building Material of External Scaffolding Couple
US$2.10-2.20
2,000 Pieces(MOQ)
6063t5 Aluminum Ladder Scaffolding System Scaffold Building Material
US$59.00-107.00
1 Piece(MOQ)
Q235 Construction Scaffolding Cuplock System ISO9001 China Facotry Building Material
US$2.00-20.00
100 Pieces(MOQ)
Scaffolding Material for Scaffolding Accessories 60*60mm Scaffolding Coupler
US$1.30-1.50
500 Pieces(MOQ)
Building Material of Q235B Q355b Steel Galvanized Ringlock Scaffolding System
US$3.00-30.00
100 Pieces(MOQ)
Ledgers Concrete Scaffolding for Sale a Scaffolding Plank Building Material
US$72.00-89.00
1 Piece(MOQ)
Concrete Formwork Steel Scaffold Ringlock System Scaffolding Building Material with Screw Base Jack
US$79.00-191.00
100 Pieces(MOQ)
AS/NZS 1576 Construction Material of Australia Kwikstage Scaffolding for Sale
US$1,020.00-1,180.00
49 Tons(MOQ)
Building Construction Materials for Layher Scaffolding System Use
US$3.00-30.00
100 Pieces(MOQ)
Low Prices Aluminum Construction Ringlock System Scaffolding Material for Sales
US$4.40-4.90
1,000 Pieces(MOQ)
En12811 Painted Cuplock Scaffolding System as Building Material for Construction
US$2.00-20.00
100 Pieces(MOQ)
Top-Quality Layher Modular Ringlock System Scaffold Construct Material for Building
US$650.00-800.00
1 Ton(MOQ)
Layher Modular System Scaffolding Building Material for Bridges/Building Construction
US$3.00-20.00
100 Pieces(MOQ)
Scaffolding Steel Plank Metal Platform Catwalk Building Material
US$7.50-19.50
100 Pieces(MOQ)
Easy Scaffolding Construction Building Material HDG Galvanized Vertical Ringlock Scaffold
US$10.00-11.00
500 Pieces(MOQ)



















