Powered by Made-in-China.com
Q235 Forged Coupler Scaffolding Double Clamp
US$1.26-1.47
100 Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-FD-074Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldSteel
Q235Standard
En74-1/BS1139Weight
1.0kgFinsh
Zinc Plate or Hot Dipped GalvanizedSize
48.3*48.3mmKeyword01
British TypeKeyword02
Forged CouplerTransport Package
Bag / PalletSpecification
25pcs/bag 50bag/palletTrademark
U T MOrigin
ChinaHS Code
7308400000Production Capacity
500000pieces/YearKey features
Durable Forged Construction: Made from Q235 steel with drop forged or pressed technology for high bearing capacity and stability.
Corrosion Resistant Finish: Available with Zinc Plate, Hot Dipped Galvanized, or Self-color finishes to prevent rust and extend life.
Versatile Color Options: Offered in Self-color (Black), White, and Yellow to suit various site requirements.
Multiple Style Standards: British style standard, with capability to produce German, American, and Japanese styles upon request.
High Strength Fasteners: Equipped with 8.8 grade high strength bolts and various nut sizes (17mm-23mm) for secure locking.
Comprehensive Certifications: Meets EN74, BS1139, ISO9001:2000, CE, and SGS standards for global safety compliance.
Customizable Dimensions: Weight and specific dimensions can be adjusted according to customer requirements.
Professional OEM Service: Supports permanent logo or sticker customization and provides engineered drawing solutions.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.36hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all products are fully tested before dispatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
En74-1 Certified German Type Drop Forged 360 Degree Swivel Coupler/Clamp for Layher Scaffolding
US$2.56-2.80
100 Pieces(MOQ)
Forged Pressed Double Scaffold Fixed Rotating Swivel Clamp Coupler
US$1.50
1,000 Pieces(MOQ)
Galvanized Scaffolding Board Retaining Clamp Double Coupler Fastener Scaffolding Clamp
US$0.90
3,000 Pieces(MOQ)
Factory Scaffolding Pipe Clamp Pressed or Drop Forged Scaffolding Double Swivel Coupler
US$2.38-2.65
1,000 Pieces(MOQ)
High Quality Q235 Electro Galvanized or HDG Pressed Scaffolding Double Coupler Swivel Clamp
US$0.65-5.00
1 Piece(MOQ)
Steel Scaffolding Forged 48.3mm Swivel Coupler Clamp
US$1.38-1.51
100 Pieces(MOQ)
60.3*60.3mm British Type Scaffolding Drop Forged Swivel Coupler / Clamp
US$2.38-2.73
100 Pieces(MOQ)
Wholesale Custom Fixed Drop Forged American Type 48.3mm Scaffolding Double Clamp
US$4.44-4.97
100 Pieces(MOQ)
Scaffolding Parts Pressed Steel Pipe Clip Fixing Double Coupler Scaffolding Swivel Clamp
US$1.50
1,000 Pieces(MOQ)
Steel Galvanzied Forged Forged Cast Iron Double Coupler or Clamp
US$1.50
1,000 Pieces(MOQ)
Scaffolding Steel Single Coupler Scaffold Pressed Putlog Drop Forged Putlog Clamp
US$1.00-2.00
1,000 Pieces(MOQ)
En74 Scaffolding Accessories Double Swivel Coupler Electro Galvanized Q235 Beam / Girder Clamp
US$0.65-5.00
1 Piece(MOQ)
Fast Delivery Scaffold Clamp Galvanized Forged Accessories Scaffolding Swivel Clamp Scaffolding Fixed Coupler
US$1.20-2.10
1,000 Pieces(MOQ)
Scaffold Single Clamp Scaffolding Half Coupler Forged Swivel Clamp
US$2.82-2.85
1,000 Pieces(MOQ)
En74 Standard Factory Direct Drop Forged Germany Double Coupler Scaffolding Fixed Clamp
US$0.20-2.00
1,000 Pieces(MOQ)
BS Double Coupler Galvanized En74 Drop Forged 48mm Scaffolding Clamp
US$1.20-2.10
1,000 Pieces(MOQ)
BS JIS 48.3mm Scaffold Tube Pressed Swivel Coupler Scaffolding Clamp
US$0.90
5,000 Pieces(MOQ)



















