Powered by Made-in-China.com

Q235 Material Swivel Double Sleeve Beam Clamp Load-Capacity Scaffold Scaffolding Supa Tie Coupler
US$2.57-2.84
100 Pieces
Sample price:US$2.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-ST-071Material
SteelType
FixedStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Scaffolding CouplersConstruction Properties
Building ScaffoldSteel
Q235Standard
En74-1/BS1139Weight
1.3kgFinsh
Zinc Plate or Hot Dipped GalvanizedSize
48.3mm 60.3mm 89mmKeyword01
British TypeKeyword02
Forged CouplerKeywords
Pressed CouplerTransport Package
Bag / PalletSpecification
25pcs/bag 50bag/palletTrademark
U T MOrigin
ChinaHS Code
7308900000Production Capacity
500000pieces/YearKey features
High-Strength Q235 Steel: Manufactured from premium Q235 steel ensuring durability and high load capacity.
Dual Manufacturing Process: Available in both forged and pressed types to meet diverse engineering needs.
Comprehensive Surface Treatment: Options include zinc plating, hot-dip galvanizing, and self-color finishes.
Global Standard Compliance: Meets EN74, BS1139, CE, and SGS standards for international safety.
Customizable Dimensions: Available in various sizes including 48.3mm, 60.3mm, and 89mm.
OEM Logo Service: Supports permanent logo or sticker customization as per customer requirements.
1-Year Warranty: Covers mechanical defects with free parts and labor for one year.
Engineered Drawing Support: Professional engineers available to design challenging scaffolding access solutions.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.26hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all products are fully tested before despatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Scaffolding Clamp Double Coupler Load Capacity Pressed Right Angle Coupler
US$971.00-1,019.00
1 Ton(MOQ)
Aluminum Pipe Swivel Optical Truss Double Putlog Sleeve Coupler Clamps
Negotiable
1,000 Pieces(MOQ)
Ringlock Aluminum Tube Swivel Sleeve Scaffolding Scaffold Coupler
Negotiable
100 Pieces(MOQ)
Factory Supply Load Capacity Coupler Scaffolding Material Name List Clamp Right Angle Coupler Swivel Clamps
US$3.05-3.10
1,000 Pieces(MOQ)
Sleeve Coupler/Steel Formwork Forged Scaffolding Clamp Scaffold Beam Clamps Swivel Coupler
US$0.50-0.60
10,000 Pieces(MOQ)
ANSI Steel Pipe Swivel Optical Scaffolding Scaffold Construction Double Putlog Sleeve Coupler
Negotiable
100 Pieces(MOQ)
Load Capacity for Large Diameter Pipe Swivel Pipe Clamp Coupler
US$0.75-2.00
2,000 Pieces(MOQ)
Pin/Sleeve/Half/Swivel/Double/Putlog/Girder/Board Retaining Scaffolding Coupler Clamp
US$1.49-1.52
10 Pieces(MOQ)
48.3mm Q235 System Clamp Swivel Pressed Double Scaffolding Coupler with Good Service
US$0.80-1.50
1,000 Pieces(MOQ)
BS1139 Scaffolding Rate Safe Scaffolding Coupler Load Capacity Scaffolding Materials for Sale
US$1.58-1.90
5,000 Pieces(MOQ)
Ringlock Aluminum Tube Scaffolding Scaffold Swivel Sleeve Coupler
Negotiable
100 Pieces(MOQ)
Heavy-Duty Q235 Steel Double Fix Swivel Sleeve Coupler
US$0.90-1.00
500 Pieces(MOQ)
Tecon Supply BS1139 Scaffolding Double Coupler Load Capacity
US$1.50-2.00
1,000 Pieces(MOQ)



















