Powered by Made-in-China.com

Wholesale Price Cuplock Scaffolding Part Cuplock Scaffolding Top Cup
US$0.85-3.05
100 Pieces
Sample price:US$20.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
YesWarranty
1 YearsModel NO.
UTM-CL-167_168Material
SteelType
Cup Lock Scaffolding SystemStructural Style
Multi-Pole ScaffoldingFramework
Combined ScaffoldingSupporting Mode
Projecting ScaffoldingLapping Form
Double ScaffoldingErection Position
External ScaffoldingScaffolding Part Type
Cuplock Scaffolding Top Cup / Ledger BladeConstruction Properties
Installation ScaffoldSteel
Q235Standard
En74-1/BS1139/As1576Finsh
Zinc Plate or Hot Dipped GalvanizedKeyword01
Cuplock ScaffoldingKeyword02
Cuplock Scaffolding Top CupKeywords
Cuplock Ledger BladeTransport Package
Bag / PalletSpecification
1-3m or customTrademark
U T MOrigin
ChinaHS Code
7308400000Production Capacity
500000pieces/YearKey features
Hot Dip Galvanized Finish: Provides long life and low maintenance with superior corrosion resistance.
High Strength Steel Material: Manufactured from Q235 high grade steel with 3.2mm thickness for durability.
Fast Erection System: 30%-50% faster than traditional scaffolding with no nuts or bolts required.
Light Weight Design: 20% lighter than standard 4mm thickness scaffolding tubes for easier handling.
Versatile Application: Suitable for facades, shoring, circular structures, birdcages, and staircases.
Multi-Standard Compliance: Meets EN74, BS1139, and AS1576 international safety standards.
High Load Capacity: Joint connector resists high bending, shearing, and torsion with 15% more capacity.
15 Years Lifespan: Engineered for long-term use with enhanced corrosion resistance coating.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2021-04-26Average Response Time: ≤1.29hTerms of Payment: LC, T/TInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF
About Our Factory & Business Background
AddressRoom 1203 Unit 1 Block 4 Jinghu Plaza Luhe Disctrict, Nanjing, Jiangsu, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsScaffolding, Scaffolding System, Scaffolding Couplers, Ringlock Scaffolding, Cuplock Scaffolding, Frame Scaffolding, Scaffolding Gate, Scaffolding Accessories, Base Jack
Our Industry Experience & Global Business Record
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Product Q&A
Q:What about after service?
A:
Our all products are fully tested before despatch, and we have traceability system. Please contact our after-service team once you have any product problem with some photos and videos to help us analyze them. We can make new ones to replace or reasonable compensation on both agreement.
Q:What are the payment terms you can accept?
A:
T/T and L/C, others are negotiable.
Q:What is your MOQ?
A:
Normally we accept one full container, but for special products we are happy to communicate with customer about order quantity.
Q:Can we customize our company logo or name on products?
A:
Yes, we can make permanent logo or sticker on products as the requirement from the customer.
Q:How fast can you finish the order?
A:
U T M company always figures out a schedule that meets the customer needs once the order is confirmed. And all production plan will be worked out as schedule.
Send Inquiry
*To:
Nanjing Uni-Tech Metalwork Co.,Ltd
Nanjing Uni-Tech Metalwork Co.,Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Building Material Cuplock Scaffolding Part Ductile Iron Cuplock Scaffold Top Cup
US$0.43-0.45
3,000 Pieces(MOQ)
Cuplock Scaffolding Parts Forged Top Cup/Pressed Bottom Cup for Construction
US$0.29
500 Pieces(MOQ)
Good Price Cuplock Scaffolding and Scaffolding Cuplock Top Cup
US$0.85-3.05
100 Pieces(MOQ)
Cuplock Scaffolding Accessories Scaffold Parts Casted Top Cup
US$0.46-0.47
3,000 Pieces(MOQ)
Modern Cuplock Scaffolding Top Cup for Quick-Fit Construction
US$900.00-930.00
5 Tons(MOQ)
Forged Top Cup for Modular Cuplock/Cuplok System Scaffolding Shoring Parts/Accessories
US$0.60-1.50
500 Pieces(MOQ)
Heavy-Duty Cuplock Scaffolding Top Cup for Construction Projects
US$900.00-930.00
5 Tons(MOQ)
Durable Cuplock Scaffolding Top Cup From Tangshan Factory
US$0.70-1.00
1,000 Pieces(MOQ)
CE Certified Cuplock System Scaffolding Parts Ledger Blade/ Top Cup/ Bottom Cup
US$0.30-0.60
10,000 Pieces(MOQ)
Cuplock System Scaffolding Parts Forged Steel Top Cup Pressed Bottom Cup for Construction
US$0.20-0.21
3,000 Pieces(MOQ)
HDG Painted Powder Coated Scaffolding Cuplock System Top and Bottom Cup
US$0.85-3.05
100 Pieces(MOQ)
Cuplock System Parts Top Cup Bottom Cup
US$5.00-20.00
1,000 Pieces(MOQ)
Heavy-Duty Cuplock Top Cup for Secure Scaffolding Systems
US$730.00
5 Tons(MOQ)
Scaffold Fittings Cuplock System Parts Construction Steel Cup Lock Top Cup
US$0.62-0.64
3,000 Pieces(MOQ)
Heavy-Duty Cuplock Scaffolding Top Cup for Reliable Construction
US$900.00-930.00
5 Tons(MOQ)
Forged/Casting Cuplock Scaffolding Accessories Top Cup
US$0.40-0.70
1,000 Pieces(MOQ)
China Factory Casting / Forged Q235 Steel Cuplock Scaffolding Blade Top Cup Bottom Cup
US$0.85-1.05
100 Pieces(MOQ)
Reliable OEM Cuplock Scaffolding Top Cup for Construction Support System
US$1,100.00-1,350.00
20 Tons(MOQ)
Cuplock Scaffolding Accessories Forged Cuplock Scaffolding Top Cup
US$0.85-3.05
100 Pieces(MOQ)
Top Cup, Bottom Cup, Scaffolding Top Cup, Scafolding Accessories
US$0.70-1.00
5,000 Pieces(MOQ)



















