SourcingAI
Try for free
Powered by Made-in-China.com
Industrial Storage Shelf Steel Mezzanine Racking System for Warehouse Mezzanine Floor Rack
US$0.80-1.50
1,000 kg

Product profile

Customization

Available

After-sales Service

Yes

Warranty

1 Year

Model NO.

WS

Usage

Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack

Material

Steel

Structure

Rack

Type

Mezzanine Rack

Mobility

Fixed

Height

2-8m

Weight

500kg

Closed

Open

Development

Conventional

Serviceability

Common Use

Customizable

Yes

Delivery Time

10-15days

Transport Package

Film Wrapped

Specification

customized

Trademark

WSCC

Origin

China

HS Code

73089000

Production Capacity

200000kgs/Month

Key features

Factory Direct Supply: We are a specialized factory in Nanjing, China, offering direct warehouse storage rack solutions.
High Load Capacity: Supports up to 500kg weight with professional engineering calculations to guarantee safety.
Flexible Customization: Offers full customization from samples/designs, including Q235 steel and other material requirements.
100% Quality Inspection: Rigorous visual and function inspection for finished products before shipping to ensure approval.
CE Certified Product: Products meet CE certification standards for industrial and warehouse storage applications.
Comprehensive Support: Provides detailed installation drawings and optional free engineer guidance for assembly.
Fast Delivery Time: General delivery within 15 days after deposit, with real-time order status updates.
Versatile Application: Suitable for tools, beverages, clothing, supermarkets, food, and general industrial warehouse use.

Company profile

Nanjing Victory Storage Equipment Manufacturing Co., Ltd.
Years of Export ExperienceQuality AssuranceRaw-Materials Traceability100% Finished Products Inspection
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 15 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤6.25h

About Our Factory & Business Background

AddressRoom 406, Building 3, Yuhua Salon, No. 109 Ruanjian Ave, Yuhuatai District, Nanjing, Jiangsu, China
Plant Area1381.72 square meters
Number of Employees15
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners24

Our Production Capability & Technical Expertise

Main ProductsPallet Rack, Drive in Rack, Light Duty Rack, Medium Duty Rack, Steel Structure, Mezzanine, Movable Rack, Flow Rack, Cantilever Rack
Production Lines1
Production MachinesPunching Facility, Cutting Facility, Bending Facility
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2009-09-01
Main MarketsEurope, Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Product CertificationCE
Cooperated with Fortune 500No

Product Q&A

Q:Are you a factory or trading company?
A:
We are a factory. We specialize in all kinds of warehouse storage rack.
Q:Where is your factory located?
A:
Our factory is located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing airport directly. You are warmly welcome to visit us whenever you are available!
Q:What is the raw material of your products?
A:
The raw material of steel code is Q235. Other steel is also available to clients' requirements.
Q:What is the term of payment?
A:
TT, LC, Western Union are available.
Q:What is the delivery time?
A:
In general, within 15 days after deposit.

Send Inquiry

*To:Nanjing Victory Storage Equipment Manufacturing Co., Ltd.Nanjing Victory Storage Equipment Manufacturing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Pallet Runner Racking System for Freezer Warehouse

Pallet Runner Racking System for Freezer Warehouse

US$20,000.00-25,000.00
1 Piece(MOQ)
Made-in-China.com