SourcingAI
Try for free
Powered by Made-in-China.com
Outdoor LED Artificial Crystal Artificial Tree Lights with Branch Twigs
US$699.00-1,999.00
1 Piece

Product profile

Customization

Available

Certification

CE, RoHS

Voltage

DC24/110/230V

Model NO.

VSD-743-220V

Emitting Color

Customized

Usage

Festival, Home, Commercial, Landscaping

Application

Mall, Street, Square, Park, Airport, Hotel, etc.

Material

Metal Frame,PVC,Acrylic,Rope Light,String Light

Lighting Effect

Static, Twinkle, Color Change or Flow

Feature

Durable, Fairy, Attractive, Waterproof

Superiority

Aging Test, Weather Resistant Material for Outdoor

Size

Customized

Light Source

LED

Bulb Quality

High Brightness

Bulb Space

5/8/10cm Can Be Customized

Structure

Detachable

IP Rate

IP65

Lifespan

30000h

Working Temp.

-40-60

Power

100-200W

Designs

Your Design Is Available

Transport Package

Carton, Can Be Customized as Request

Specification

CE&ROSH, SAA

Trademark

vision

Origin

Zhongshan, China

HS Code

940530000

Production Capacity

1000PCS/Month

Key features

Customized LED Colors: Emitting color is fully customizable to match specific design requirements.
IP65 Waterproof Rating: Weather resistant material ensures durability for outdoor landscaping and festivals.
Long Lifespan: High brightness LED bulbs provide a lifespan of up to 30,000 hours.
Flexible Customization: Customizable size, bulb spacing (5/8/10cm), and lighting effects like twinkle or flow.
Detachable Structure: Designed with a detachable metal frame for easy installation and storage.
Certified Quality: Products hold CE, RoHS, and PSE certifications with ISO9001 quality control.
Versatile Application: Suitable for malls, streets, squares, parks, airports, hotels, and home decor.
Low MOQ for Samples: Minimum order quantity is just 1 piece for sample checking and quality testing.

Company profile

Zhongshan Vision Lighting Company
Experienced TeamHigh Repeat Buyers ChoiceProduct CertificationCustomization from Designs
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 Years CertifiedNearest Port: Guangzhou Port, Shenzhen PortAverage Response Time: ≤1.73h

About Our Factory & Business Background

AddressNo. 29, Xiangfeng South Road, Xiaolan, Zhongshan, Guangdong, China
Plant Area6300 square meters
Number of Employees40
Registered Capital500,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners20

Our Production Capability & Technical Expertise

Main ProductsChristmas Light, LED String Light, LED Icicle Light, LED Curtain Light, LED Waterfall Light, LED Rope Strip Light, LED Neon Flex Light, LED Tree Light, LED 2D 3D Motif Light, LED Laser Light
Production Lines6
Production MachinesTube Drawing Machine, Injection Molding Machine, Terminal Crimping Machine, Soldering Lamp Machine, Wire Cutting Machine, Welding Machine, Cutting Machine
QA/QC inspectors6 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers3 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-01-17
Main MarketsDomestic
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:Can I have a sample order for led light?
A:
Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q:What about the lead time?
A:
Sample needs 3-5 days. Lead time for mass production depends on the qty.
Q:Do you have any MOQ limit for led light order?
A:
Low MOQ, 1pc for sample checking is available
Q:How do you ship the goods and how long does it take to arrive?
A:
We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.
Q:How to proceed an order for led light?
A:
Firstly let us know your requirements or application. Secondly We quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production.

Send Inquiry

*To:Zhongshan Vision Lighting CompanyZhongshan Vision Lighting Company
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like