Powered by Made-in-China.com
Affordable Asic Miner Cooling System with AC Fan
US$1,800.00-27,500.00
1 Set
Product profile
Customization
AvailableAfter-sales Service
Free Spare PartsWarranty
12 MonthsModel NO.
CustomizedType
Air-CooledCooling Water
Industrial WaterSystem Type
Closed SystemFans Species
Double-speed fanNoise Level
LowApplication Fields
Immersion CoolingCertification
ISOCondition
NewTube Material
Stainless Steel, Aluminum, Hot DIP Carbon SteelDefrost
Hot Gas Defrost, Electrical Defrost, Water DefrostFin Space
5-20mmFin Material
Aluminum, Stainless Steel, Hot DIP Carbon SteelMounting
Floor StandingTransport Package
Wooden PackageSpecification
According to the productTrademark
VRCOOLEROrigin
ChinaProduction Capacity
2000PCS/MonthsKey features
Immersion Cooling Solutions: Offers direct and indirect cooling solutions for immersion cooling systems ranging from 40KW to 240KW.
Customizable Materials: Tube materials include stainless steel, aluminum, copper, and titanium; fins available in aluminum and copper.
OEM and ODM Services: Accepts OEM orders and provides full customization from samples or designs.
12 Months Warranty: Comes with a 12-month warranty period and free spare parts for after-sales service.
ISO Certified: Product meets ISO certification standards for quality and safety.
Low Noise Operation: Features double-speed fans designed for low noise levels during operation.
Rapid Response Support: Provides replies within 24 hours and offers urgent phone support for critical needs.
Versatile Applications: Suitable for machine cooling, process cooling, oil cooling, and ASIC miner cooling systems.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.54h
About Our Factory & Business Background
Address1505 Yingnuojiguang, Kejiaocheng, Wujin& District, Changzhou, Jiangsu, China
Plant Area177 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Condenser Coil, Evaporator Coil, Dry Cooler, Unit Cooler, IQF Evaporator
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2015-12-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a manufacturer or Trade Company?
A:
We are a manufacturing factory and we can accept OEM orders.
Q:What's the order process?
A:
1) Inquiry---provide us with all clear requirements. 2) Quotation---official quotation list with all clear specifications. 3) PI--Confirm all the order technical data and price 4) Payment terms--- T/T deposit in advance 5) Production---mass production 6) Shipping--- by sea. A detailed picture of the package will be provided. 7) After-sales Service--Any questions, we will try our best to assist to solve for you.
Q:How to get a prompt quotation?
A:
When you send the inquiry to us, pls kindly send it with the below technical information. A. Function: Cooling only or cooling and heating? B. Capacity: _____KW or ___Ton C. Refrigerant: R407C, R410a or R134a D. Voltages and Frequency : ______V/PH/HZ E.Application:
Send Inquiry
*To:Changzhou Vrcoolertech Refrigeration Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced 2022 Bitcoin Immersion Cooling System for Asic Miners
US$17,500.00-18,000.00
1 Piece(MOQ)
Stock New Water-Cooled Home Water Miner Asic Cooling System
US$399.00-599.00
1 Piece(MOQ)
Next-Gen Immersion Cooling System for Asic Miners 2022
US$17,500.00-18,000.00
1 Piece(MOQ)
Advanced High Pressure Coolant System with Integrated Cooling Solutions
US$500.00
1 Piece(MOQ)
2025 Hot Sale Exhaust Ventilation System Pad Cooling System with Fans
US$80.00-100.00
1 Square Meter(MOQ)
Industrial Ammonia CO2 Refrigeration Cooling System with Mycom Screw Compressor Condenser Compact Unit
US$2,500.00-80,000.00
1 Piece(MOQ)
Industrial CO2 Ammonia Refrigeration Cooling System with Gea Screw Compressor Unit
US$2,500.00-80,000.00
1 Piece(MOQ)
Advanced Flat Type Bitcoin Mining Cooling System with Air Fin Technology
US$1,000.00-3,000.00
1 Piece(MOQ)
Hot Sale Asic Miner Immersion Cooling System with High Heat Rejection
US$1,800.00-27,500.00
1 Set(MOQ)
Industrial Cooling Quick Freezer Refrigeration Compressor Unit System with R404A, R507, R717 Refrigerant
US$4,000.00-80,000.00
1 Piece(MOQ)
Dry Cooling System for Asic Miner Liquid Cooling
US$1,800.00-27,500.00
1 Set(MOQ)
Reliable Server Cooling System with Liquid Immersion Technology
US$1,000.00-3,000.00
1 Piece(MOQ)
EU Model Liquid Cooling System for Plasma Cutter with CE
US$177.00-234.00
10 Boxes(MOQ)
Industrial Refrigeration Cooling System with Mycom Ammonia CO2 Screw Compressor Condensing Unit
US$2,500.00-80,000.00
1 Piece(MOQ)
Immersion Liquid Cooling System for Asic Miner Water Cooling
US$1,800.00-27,500.00
1 Set(MOQ)
Compact Cooling System with Mini Inverter Compressor for Tiny Mobile Cooling Systems
US$270.00-440.00
1 Set(MOQ)
Energy Saving Indirect Miner Cooling System for Asic Miner
US$1,800.00-27,500.00
1 Set(MOQ)
Aolan Energy Efficient Evaporative Cooling System with 60-70% Electricity Saving
US$1,750.00-2,500.00
1 Piece(MOQ)
Advanced CNC Cooling System with 4kw High Pressure
US$3,100.00-3,300.00
1 unit(MOQ)



















