SourcingAI
Try for free
Powered by Made-in-China.com
Asic Miner Immersion Cooling for Btc Minner Blockchain Miner
US$1,800.00-27,500.00
1 Set

Product profile

Customization

Available

After-sales Service

Free Spare Parts

Warranty

12 Months

Model NO.

40KW, 120KW, 240KW

Type

Air-Cooled

Cooling Water

Industrial Water

System Type

Closed System

Fans Species

Double-speed fan

Noise Level

Low

Application Fields

Immersion Cooling

Certification

ISO

Condition

New

Tube Material

Stainless Steel, Aluminum, Hot DIP Carbon Steel

Defrost

Hot Gas Defrost, Electrical Defrost, Water Defrost

Fin Space

5-20mm

Fin Material

Aluminum, Stainless Steel, Hot DIP Carbon Steel

Mounting

Floor Standing

Transport Package

Wooden Package

Specification

According to the product

Trademark

VRCOOLER

Origin

China

Production Capacity

2000PCS/Months

Key features

Immersion Cooling Solution: Cost-effective dry coolers designed specifically for Bitcoin mining immersion cooling systems.
Wide Capacity Range: Available from 20kW single fan units up to V-shaped 5MW dry coolers.
Customizable Materials: Tubes and fins available in Aluminum, Copper, Stainless Steel, Titanium, and Hot DIP Carbon Steel.
12 Months Warranty: Comprehensive 12-month warranty coverage with free spare parts for after-sales service.
OEM/ODM Support: Full customization available including design, samples, and flexible customization options.
ISO Certified Quality: Manufactured with ISO certification ensuring high quality and reliability standards.
Rapid Response Time: Technical support and inquiries replied to within 24 hours for urgent needs.
Dual Cooling Solutions: Offers both direct cooling and indirect cooling with plate heat exchangers.

Company profile

Experienced TeamExhibition ExperienceFlexible CustomizationR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.88h

About Our Factory & Business Background

Address1505 Yingnuojiguang, Kejiaocheng, Wujin& District, Changzhou, Jiangsu, China
Plant Area177 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners50

Our Production Capability & Technical Expertise

Main ProductsHeat Exchanger, Condenser Coil, Evaporator Coil, Dry Cooler, Unit Cooler, IQF Evaporator
R&D Engineers2 people

Our Industry Experience & Global Business Record

Year of Establishment2015-12-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or a trade company?
A:
We are a manufacturing factory and we can accept OEM orders.
Q:What is the order process?
A:
1) Inquiry---provide us all clear requirements. 2) Quotation---official quotation list with all clear specifications. 3) PI--Confirm all the order technical data and price 4) Payment terms--- T/T deposit in advance 5) Production---mass production 6) Shipping--- by sea. Detailed picture of package will be provided. 7) After-sales Service--Any questions, we will try best to assist to solve for you.
Q:How to get a prompt quotation?
A:
When you send the inquiry to us, pls kindly send it with below technical information. A. Function: Cooling only or cooling and heating? B. Capacity: _____KW or ___Ton C. Refrigerant: R407C, R410a or R134a D. Voltages and Frequency : ______V/PH/HZ E.Application:
Q:What are the available tube materials?
A:
Standard tubes include Aluminium, copper, stainless steel, cu-ni, titanium, and hot dip galvanized steel.
Q:What is the warranty period?
A:
We provide a 12-month warranty with free spare parts for after-sales service.

Send Inquiry

*To:Changzhou Vrcoolertech Refrigeration Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Shock-Resistant Miner Immersion Cooling

Shock-Resistant Miner Immersion Cooling

US$10,000.00-15,000.00
1 Piece(MOQ)
Made-in-China.com
Asic Immersion Cooling Kit for Btc Miner M30s

Asic Immersion Cooling Kit for Btc Miner M30s

US$1,800.00-27,500.00
1 Set(MOQ)
Made-in-China.com
Auto-Regulating Miner Immersion Cooling

Auto-Regulating Miner Immersion Cooling

US$10,000.00-15,000.00
1 Piece(MOQ)
Made-in-China.com
Efficient Bitcoin Miner Cooling for Optimal Performance
Made-in-China.com
Asic Cooling for A1 25t Bitcoin Miner

Asic Cooling for A1 25t Bitcoin Miner

US$1,800.00-27,500.00
1 Set(MOQ)
Made-in-China.com
Asic Immersion Cooling for Blockchain Miner Asic Miner
Made-in-China.com
Hydro-Powered Miner Immersion Cooling

Hydro-Powered Miner Immersion Cooling

US$10,000.00-15,000.00
1 Piece(MOQ)
Made-in-China.com
Asic Cooling for Ethereum Miner 12GPU Ethereum Mining Rig
Made-in-China.com
Crypto Immersion Cooling for Antminer S19j PRO Asic Miner
Made-in-China.com
Asic Miner Immersion Cooling for Submerged Cooling
Made-in-China.com
Asic Miner Liquid Cooling for Server Immersion Cooling
Made-in-China.com
Special Drycooler Immersion Systems for S19j PRO 110th
Made-in-China.com
Turnkey Crypto Cooling Solution for S19j PRO Cooling
Made-in-China.com