Powered by Made-in-China.com
Dry Air Cooled Condenser Remote Radiator for Data Center Bitcoin Miner
US$1,800.00-27,500.00
1 Set
Product profile
Customization
AvailableAfter-sales Service
Free Spare PartsWarranty
12 MonthsModel NO.
CustomizedType
Air-CooledCooling Water
Industrial WaterSystem Type
Closed SystemFans Species
Double-speed fanNoise Level
LowApplication Fields
Immersion CoolingCertification
ISOCondition
NewTube Material
Stainless Steel, Aluminum, Hot DIP Carbon SteelDefrost
Hot Gas Defrost, Electrical Defrost, Water DefrostFin Space
5-20mmFin Material
Aluminum, Stainless Steel, Hot DIP Carbon SteelMounting
Floor StandingTransport Package
Wooden PackageSpecification
According to the productTrademark
VRCOOLEROrigin
ChinaProduction Capacity
2000PCS/MonthsKey features
Wide Capacity Range: Available from 5kW single fan units up to V-shaped 5MW dry coolers.
Customizable Tube Materials: Options include Stainless Steel, Aluminum, and Hot DIP Carbon Steel.
Flexible Defrost Methods: Supports Hot Gas, Electrical, and Water defrost configurations.
Customizable Fin Materials: Available in Aluminum, Stainless Steel, and Hot DIP Carbon Steel.
12 Months Warranty: Comprehensive warranty coverage for all mechanical equipment.
Free Spare Parts: After-sales service includes provision of free replacement parts.
ISO Certified Quality: Manufactured under ISO certification standards for reliability.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤2.07h
About Our Factory & Business Background
Address1505 Yingnuojiguang, Kejiaocheng, Wujin& District, Changzhou, Jiangsu, China
Plant Area177 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Condenser Coil, Evaporator Coil, Dry Cooler, Unit Cooler, IQF Evaporator
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2015-12-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a manufacturer or a trade company?
A:
We are a manufacturing factory and we can accept OEM orders.
Q:What is the order process?
A:
1) Inquiry---provide us all clear requirements. 2) Quotation---official quotation list with all clear specifications. 3) PI--Confirm all the order technical data and price 4) Payment terms--- T/T deposit in advance 5) Production---mass production 6) Shipping--- by sea. Detailed picture of package will be provided. 7) After-sales Service--Any questions, we will try best to assist to solve for you.
Q:How to get a prompt quotation?
A:
When you send the inquiry to us, pls kindly send it with below technical information. A. Function: Cooling only or cooling and heating? B. Capacity: _____KW or ___Ton C. Refrigerant: R407C, R410a or R134a D. Voltages and Frequency : ______V/PH/HZ E.Application:
Q:What is the warranty period?
A:
We provide a 12-month warranty for this product.
Q:What is the lead time?
A:
The lead time is one month for both peak season and off-season.
Send Inquiry
*To:Changzhou Vrcoolertech Refrigeration Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Horizontal Dry Coolers Remote Radiators for Turbine Bearings of Power Plant Cooling
US$1,800.00-7,500.00
1 Set(MOQ)
Air Cooled Radiator for Dry Cooling Immersion System
US$1,800.00-27,500.00
1 Set(MOQ)
Outdoor Bc888 Radiator: Ideal Cooling Solution for Bitcoin Centers
US$1,000.00-3,000.00
1 Piece(MOQ)
OEM Quality Remote Radiator for Cat Cg170b-12 Engine
US$150.00-400.00
1 Set(MOQ)
High-Efficiency Air Cooled Radiator for Bitcoin Mining Centers
US$1,000.00-3,000.00
1 Piece(MOQ)
Sx3 Sx5 Bc888 Bit Mining Cooling System Radiator Use for Bitcoin Center
US$400.00-7,500.00
1 Set(MOQ)
Diesel Engines Air-Cooled Condenser Remote Radiator for Generator
US$846.00
1 Piece(MOQ)
Horizontal Remote Radiator for Modular Refinery Power Station and Crude Oil Distillation Skid
US$200.00-280.00
1 Piece(MOQ)
Air Cooled Condenser Dry Coolers Remote Radiators
US$570.00-600.00
1 Piece(MOQ)
40kw Dry Cooler Adiabatic Radiator for Cooling System1 Buyer
US$2,415.00
1 Piece(MOQ)
Innovative Mobile Data Center Cooling Towers for Optimal Radiator Efficiency
US$17,500.00-18,000.00
1 Piece(MOQ)
Customized Gas Engine Generator Cooler Remote Radiator for Power Plant
US$1,800.00-2,000.00
1 Set(MOQ)
Free Cooling Ethylene Glycol Fin Fan Radiator for Bitcoin Miner
US$570.00-600.00
1 Piece(MOQ)
Air Cooled Radiator for Cooling Engine
US$50.00
50 Pieces(MOQ)
Air Cooled Heat Exchanger Remote Radiator for Wind Turbine Cooling for Russian
US$1,543.00-1,688.00
10 Pieces(MOQ)
Air Cooled Aluminum Oil Radiator for Oil Cooling Devices
US$50.00
50 Pieces(MOQ)
Air Cooled Radiator for Bitcoin Miner Cooling
US$12,500.00-15,000.00
1 Piece(MOQ)
Aftermarket Customized Remote Radiator Copper Tube for Gas Engine
US$150.00-400.00
1 Set(MOQ)
High Quality Copper Tube Radiator Remote Radiator for Generator Power Plant
US$1,000.00
1 Piece(MOQ)
Air Cooled Aluminum Oil Radiator for Construction Machinery
US$50.00
50 Pieces(MOQ)



















