Powered by Made-in-China.com
Dry Cooling for Immersion Systems for Asic Mining Cooling
US$1,800.00-27,500.00
1 Set
Product profile
Customization
AvailableAfter-sales Service
Free Spare PartsWarranty
12 MonthsModel NO.
CustomizedType
Air-CooledCooling Water
Industrial WaterSystem Type
Closed SystemFans Species
Double-speed fanNoise Level
LowApplication Fields
Immersion CoolingCertification
ISOCondition
NewTube Material
Stainless Steel, Aluminum, Hot DIP Carbon SteelDefrost
Hot Gas Defrost, Electrical Defrost, Water DefrostFin Space
5-20mmFin Material
Aluminum, Stainless Steel, Hot DIP Carbon SteelMounting
Floor StandingTransport Package
Wooden PackageSpecification
According to the productTrademark
VRCOOLEROrigin
ChinaProduction Capacity
2000PCS/MonthsKey features
Immersion Cooling Optimization: Designed specifically for immersion cooling systems in crypto mining applications.
Wide Capacity Range: Available from 20kW single fan units up to V-shaped 5MW dry coolers.
Customizable Tube Materials: Options include Stainless Steel, Aluminum, Hot DIP Carbon Steel, Copper, and Titanium.
Flexible Fin Materials: Select from Aluminum, Stainless Steel, or Hot DIP Carbon Steel for fins.
Multiple Defrost Options: Supports Hot Gas, Electrical, and Water defrost methods.
Customizable Fin Space: Fin spacing can be adjusted between 5mm and 20mm.
12 Months Warranty: Comprehensive 12-month warranty coverage for the equipment.
Free Spare Parts: Includes free spare parts as part of the after-sales service.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤3.73h
About Our Factory & Business Background
Address1505 Yingnuojiguang, Kejiaocheng, Wujin& District, Changzhou, Jiangsu, China
Plant Area177 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners50
Our Production Capability & Technical Expertise
Main ProductsHeat Exchanger, Condenser Coil, Evaporator Coil, Dry Cooler, Unit Cooler, IQF Evaporator
R&D Engineers2 people
Our Industry Experience & Global Business Record
Year of Establishment2015-12-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a manufacturer or Trade Company?
A:
We are a manufacturing factory and we can accept OEM orders.
Q:What is the order process?
A:
1) Inquiry---provide us with all clear requirements. 2) Quotation---official quotation list with all clear specifications. 3) PI--Confirm all the order technical data and price 4) Payment terms--- T/T deposit in advance 5) Production---mass production 6) Shipping--- by sea. A detailed picture of the package will be provided. 7) After-sales Service--Any questions, we will try our best to assist to solve for you.
Q:How to get a prompt quotation?
A:
When you send the inquiry to us, pls kindly send it with the below technical information. A. Function: Cooling only or cooling and heating? B. Capacity: _____KW or ___Ton C. Refrigerant: R407C, R410a or R134a D. Voltages and Frequency : ______V/PH/HZ E.Application:
Q:What is the warranty period?
A:
We provide a 12-month warranty for the equipment.
Q:What tube materials are available?
A:
Tubes are available in Aluminum, copper, stainless steel, Cu-Ni, titanium, and hot dip galvanized steel.
Send Inquiry
*To:Changzhou Vrcoolertech Refrigeration Co., Ltd.
*Content:
Supplier replies will be sent to your registered email
You may also like
Advanced 2023 S3X Immersion Cooling System for Mining Operations
US$17,500.00-18,000.00
1 Piece(MOQ)
Efficient Immersion Cooling System for Enhanced Crypto Mining Performance
US$17,500.00-18,000.00
1 Piece(MOQ)
Mining Rig Cooling Server Liquid Immersion Cooling System
US$570.00-600.00
1 Piece(MOQ)
Advanced Immersion Cooling Systems for Asic and GPU Mining
US$17,500.00-18,000.00
1 Piece(MOQ)
Advanced Immersion Cooling System for Bitcoin Mining Hardware
US$17,500.00-18,000.00
1 Piece(MOQ)
Customized Cooling System for Rig Dry Cooler
US$9,000.00-10,000.00
1 Piece(MOQ)
Energy Saving Dry Cooling System for Chiller and Factory Cooling
US$3,298.00-6,006.00
1 Piece(MOQ)
Best Selling Dry Cooling System for Immersion Cooling Mining Rig
US$1,800.00-27,500.00
1 Set(MOQ)
Ultra Quiet High Tech High Efficient Dry Cooling System for Cooling
US$2,000.00-2,200.00
1 Piece(MOQ)
Dry Cooling System for Asic Miner Liquid Cooling
US$1,800.00-27,500.00
1 Set(MOQ)
Dry Cooler Mining Rig Cooling System
US$570.00-600.00
1 Piece(MOQ)
ISO9001 Certified High-Performance D for European Cooling Systems
US$800.00-80,000.00
1 Piece(MOQ)
35% Ethylene Glycol Dry Cooling System for Chemical Industry
US$3,888.00
1 Piece(MOQ)
Energy Saved Indirect Cooling System for Asic Mining Equipment
US$1,800.00-27,500.00
1 Set(MOQ)
New Cost-Effective Competitively Priced Dry Cooling System for Industrial Use
US$2,000.00-2,200.00
1 Piece(MOQ)
Dry Air Cooling Immersion System for Immersion Cooled Asic Miner Mining Rig
US$1,800.00-27,500.00
1 Set(MOQ)
CTI Certified Eco Design Efficient Industrial Water Cooling System for Mining
US$2,226.00-3,908.00
1 Piece(MOQ)
Liquid Level Monitor Cooling System for Storage Rack Chiller with Auto Supplement Pump No Dry Burning Cabinet Mounted Cdu
US$2,500.00-5,500.00
1 Piece(MOQ)
Stock New Water-Cooled Home Water Miner Asic Cooling System
US$399.00-599.00
1 Piece(MOQ)
Advanced C6 Oil Immersion Cooling System for Efficient Power Distribution
US$1,500.00-1,600.00
1 Piece(MOQ)



















