SourcingAI
Try for free
Powered by Made-in-China.com
Industrial Water Chiller for Cooling Mining Rig Room
US$1,800.00-27,500.00
1 Set

Product profile

Customization

Available

After-sales Service

Free Spare Parts

Warranty

12 Months

Model NO.

Customized

Type

Air-Cooled

Cooling Water

Industrial Water

System Type

Closed System

Fans Species

Double-speed fan

Noise Level

Low

Application Fields

Immersion Cooling

Certification

ISO

Condition

New

Tube Material

Stainless Steel, Aluminum, Hot DIP Carbon Steel

Defrost

Hot Gas Defrost, Electrical Defrost, Water Defrost

Fin Space

5-20mm

Fin Material

Aluminum, Stainless Steel, Hot DIP Carbon Steel

Mounting

Floor Standing

Transport Package

Wooden Package

Specification

According to the product

Trademark

VRCOOLER

Origin

China

Production Capacity

2000PCS/Months

Key features

Immersion Cooling Optimization: Designed specifically for crypto mining immersion cooling systems with V-shaped units up to 5MW.
Wide Capacity Range: Available from 20kW single fan units to 240KW multi-rack systems with direct or indirect cooling.
Custom Tube Materials: Options include stainless steel, aluminum, copper, Cu-Ni, and titanium in various diameters.
Custom Fin Materials: Available in aluminum, copper, stainless steel, and titanium with varied fin space from 5-20mm.
Flexible Defrost Options: Supports hot gas, electrical, and water defrost methods for diverse operating environments.
12 Months Warranty: Comprehensive 12-month warranty coverage with free spare parts for mechanical defects.
ISO Certified Quality: Manufactured under ISO certification standards ensuring high reliability and performance.
24-Hour Response Time: Technical team provides prompt replies within 24 hours for inquiries and urgent needs.

Company profile

Experienced TeamExhibition ExperienceFlexible CustomizationR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 6 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤1.87h

About Our Factory & Business Background

Address1505 Yingnuojiguang, Kejiaocheng, Wujin& District, Changzhou, Jiangsu, China
Plant Area177 square meters
Number of Employees12
Registered Capital1,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 Set
Supply Chain Partners50

Our Production Capability & Technical Expertise

Main ProductsHeat Exchanger, Condenser Coil, Evaporator Coil, Dry Cooler, Unit Cooler, IQF Evaporator
R&D Engineers2 people

Our Industry Experience & Global Business Record

Year of Establishment2015-12-07
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:Are you a manufacturer or trade company?
A:
We are a manufacturing factory and we can accept OEM orders.
Q:What is the order process?
A:
1) Inquiry---provide us with all clear requirements. 2) Quotation---official quotation list with all clear specifications. 3) PI--Confirm all the order technical data and price 4) Payment terms--- T/T deposit in advance 5) Production---mass production 6) Shipping--- by sea. A detailed picture of the package will be provided. 7) After-sales Service--Any questions, we will try our best to assist to solve for you.
Q:How to get a prompt quotation?
A:
When you send the inquiry to us, pls kindly send it with the below technical information. A. Function: Cooling only or cooling and heating? B. Capacity: _____KW or ___Ton C. Refrigerant: R407C, R410a or R134a D. Voltages and Frequency : ______V/PH/HZ E.Application:
Q:What customization options are available?
A:
We offer customization from samples, designs, full customization, minor customization, and flexible customization including tube material, fin material, and defrost methods.
Q:What are the lead times for production?
A:
The average lead time is one month for both peak season and off-season.

Send Inquiry

*To:Changzhou Vrcoolertech Refrigeration Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Air Cooled Scroll Water Chiller for Water Cooling System
Made-in-China.com