SourcingAI
Try for free
Powered by Made-in-China.com
Wellcamp Two Stories Fast Build Loft Style Prefabricated Container Villa
US$24,000.00-28,000.00
2 Sets

Product profile

Customization

Available

Material

Steel Structure

Length

12m

Width

6m

Height

5.6m

The Thickness of The Steel Structure

2.3-5mm

The Thickness of The Roof

50mm

The Thickness of The Wall

50mm

Usage

Villa, Temporary Offices, Motel, Family House, Resort

Certification

ISO, CE, SGS

Customized

Customized

Transport Package

Standard Packing

Specification

SGS

Trademark

wellcamp

Origin

Foshan, Guangdong, China

HS Code

9406900090

Production Capacity

800 Sets Per Month

Key features

Fast Manual Installation: 6 workers can install one unit in 2-4 minutes without heavy machinery or cement foundation.
Modular Stackable Design: Units can stack up to 3 floors or join to form larger halls for flexible space planning.
Durable Galvanized Structure: Fully galvanized steel structure with bake-paint finish, designed to last over 50 years.
Comprehensive Customization: Offers full, minor, and flexible customization options from samples or designs.
Versatile Application: Suitable for villas, temporary offices, motels, resorts, and remote area housing projects.
High Weather Resistance: Withstands wind speeds up to 120km/h and meets Grade 7 earthquake resistance standards.
Efficient Thermal Insulation: Features EPS, Glass Wool, or Rock Wool sandwich panels for heat and sound insulation.
Easy Mobility: All parts can be moved manually, by crane, or forklift, ideal for remote or mountain areas.

Company profile

Guangdong Wellcamp Steel Structure & Modular Housing Co., Ltd.
Experienced TeamODM ServicesR&D CapabilitiesManagement Certification
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 Years CertifiedNearest Port: Guangzhou Port,Shenzhen PortAverage Response Time: ≤15h

AI-Powered supplier vetting

SummaryThe supplier is a combined type company with strong export orientation, contributing 90% to total sales. They offer 3D software design services and have a robust customization capability. Although they hold CE and ISO9001:2015 certifications, they lack written procedures for corrective and preventive actions and customer complaint handling. Their financial capacity was last assessed in 2024. They have not collaborated with Fortune 500 companies and have a moderate preference rate among repeat buyers. The supplier does not conduct regular fire drills or environmental impact assessments, indicating potential areas for improvement in sustainable practices.
Supplier typeThe supplier is classified as a combined type company, indicating a mix of manufacturing and service capabilities.
CertificationsThe supplier holds CE and ISO9001:2015 certifications, indicating compliance with industry standards and quality management systems.
R&D capabilityThe supplier has demonstrated innovation by launching new products in the past year and offering ODM and OEM services.
Production capacityThe supplier's production includes integrated houses and steel structures, with exports accounting for 90% of sales, indicating significant production capability.
Customization capabilityThe supplier offers extensive customization capabilities, including full and minor customization from samples and designs.

Product Q&A

Q:How long does it take to install one unit?
A:
6 workers can install one unit in 2-4 minutes with full manual installation.
Q:Can the container villa be stacked?
A:
Yes, units can be stacked up to 3 floors or joined together to form larger halls.
Q:Is customization available?
A:
Yes, we offer full, minor, and flexible customization options based on samples or designs.
Q:What is the expected lifespan of the structure?
A:
The galvanized steel structure is designed to last more than 50 years, while the house itself can be used for 15-25 years.
Q:Do I need a cement foundation?
A:
No, the villa comes as parts and can be assembled on-site without a cement foundation.

Send Inquiry

*To:Guangdong Wellcamp Steel Structure & Modular Housing Co., Ltd.Guangdong Wellcamp Steel Structure & Modular Housing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Wellcamp Country Style Economic Prefab Container Villa
Made-in-China.com
Tiny Portable Modular Prefab Container Prefabricated Villa House
Made-in-China.com
Wellcamp Country Style Economic Container Villa
Made-in-China.com