SourcingAI
Try for free
Powered by Made-in-China.com
Steel Band Pipe Clip Round Spring Hose Clamp for Cooling Systems
US$0.001
10,000 Pieces

Product profile

Customization

Available

Material

Stainless Steel

Usage

Pipe Clamp, Hose Clamp

Model NO.

Round Spring Clamp

Standard

Standard

Condition

New

Name

Spring Hose Clamp

Delivery Time

30-35days

Logo Print

Yes

OEM

Accepted

Feature

Easy Installation

Color

Silver/Black

Key

Hose Clamp

Transport Package

Carton

Specification

Customized

Trademark

wdf

Origin

China

HS Code

7326909000

Production Capacity

50000PCS/Month

Key features

Self-Adjusting Mechanism: Ensures a tight seal even under temperature fluctuations for cooling systems.
Easy Installation: Can be opened by hand or pliers, eliminating the need for additional tools.
Superior Strength: Constructed from high-grade chrome-vanadium steel for durability.
Leak-Proof Connection: Distributes clamping force evenly to prevent hose damage.
Corrosion Resistance: Excellent resistance to temperature changes and corrosion.
Customization Options: Logo printing, OEM, and flexible customization available.
Wide Application: Suitable for automotive, medical equipment, and plastic industries.
Quality Certification: Adheres to ISO9001/TS16949 quality standards.

Company profile

Ningbo Wodafeng Hardware Technology Co., Ltd.
R&D CapabilitiesProduction Process VisualizationPrivate MoldStandardized quality control
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Ningbo PortAverage Response Time: ≤1.80h

AI-Powered supplier vetting

SummaryThe supplier demonstrates broad customization and ODM capability, reports new products within the past year, and operates stamping, milling, grinding, welding, assembly, and testing equipment. It has two production lines, stated hose-clamp output of 20,000,000 pieces, inventory capability, and documented peak/off-peak lead times. Export experience is reported at 10 years, with 71%–90% of sales from exports and self-managed import/export rights. However, supplier-management certification is listed as NIL, and service procedures generally lack supporting records. Financial information is inconsistent across the provided slices and is not sufficient for a reliable credibility judgment. The supplier reports OEM service for known brands, but no specific customer names or verifiable case details are provided.
Supplier typeThe supplier presents itself as a manufacturer with in-house production and testing equipment, two production lines, inventory capability, ODM services, OEM experience for known brands, and self-managed import/export rights. These attributes support classification as a manufacturing supplier with OEM/ODM and export capabilities.
CertificationsSupplier-management system certification is explicitly recorded as NIL. This is a stated absence of certification evidence for the assessed management systems.
R&D capabilityThe supplier reports seven years of total R&D engineer experience, new products within the past year, ODM services, and extensive design-service options. It does not have an available SDK, but SDK availability is not sufficient to negate the broader product-development evidence.
Production capacityProduction capability is supported by two production lines, stated hose-clamp output of 20,000,000 pieces, a broad equipment set, finished-product inspection instructions that are uniformly followed, inventory capability, and lead times of within 15 working days off-season and one month in peak season. The supplier also reports valid manufacturing contracts with associated subcontractors.
Customization capabilityThe supplier explicitly offers customization from samples, full customization, customization from designs, minor customization, and flexible customization, supported by both R&D and design-service records. This indicates broad customization coverage.

Product Q&A

Q:How long is your delivery time?
A:
The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days.
Q:Do you provide sample? Is it free?
A:
If the sample is low value, we will provide the free sample with freight collect. But for some high value samples, we need to collect the sample charge.
Q:What is your term of payment?
A:
30% down payment before producing and 70% balance payment before shipping.
Q:Which payment form you can accept?
A:
T/T, Western Union, PayPal etc. We accept any convenient and swift payment term.
Q:Which certificate do you have?
A:
ISO.

Send Inquiry

*To:Ningbo Wodafeng Hardware Technology Co., Ltd.Ningbo Wodafeng Hardware Technology Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like