SourcingAI
Try for free
Powered by Made-in-China.com
Weichai Diesel Engine 404D-22t for Generator and Agricultural Machinery
US$4,500.00
1-9 SET
US$4,000.00
10+ SET

Product profile

Customization

Available

Body Material

Iron

Cold Style

Water-Cooled

Model NO.

optional

Emission Standard

Euro 5, Euro 6

Engine Type

Inline Engine

Number of Cylinders

Six Cylinder

Start

Kick Start

Speed

Speed

Intake Pressure Impulse

Supercharged

Fuel

Diesel

MOQ

1

Transport Package

Wrapping Film/ Wooden Case

Trademark

NON

Origin

China

Production Capacity

500set/Year

Key features

Euro 5/6 Emission Standard: Complies with strict Euro 5 and Euro 6 emission standards for environmental protection.
Versatile Application: Suitable for generators, agricultural machinery, construction, mining, and trucks.
Inline Six-Cylinder Design: Features a robust inline six-cylinder configuration with water-cooling system.
Flexible Delivery Options: Supports express, air, sea, and land transport via train or EMS for global reach.
Fast Stock Delivery: In-stock items can be delivered within 1-2 days, while production takes 30-35 days.
Customizable Speed: Speed settings are customizable to meet specific operational requirements.
Supercharged Intake: Intake pressure impulse is supercharged for enhanced engine performance.
Sample Order Available: Sample orders are accepted; customers bear sample and courier costs.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2023-06-13Nearest Port: QINGDAOAverage Response Time: ≤0.66hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DDP, DAP, FCA, EXW

AI-Powered supplier vetting

SummaryThe supplier operates across equipment, electric vehicles, communication equipment, lighting, packaging, automotive decoration, pneumatic machinery, gas compression machinery, and power switches. It offers broad customization, including sample-, design-, full-, and minor customization, and reports quality assurance and raw-material traceability. However, finished-product inspection is random and performed by packing staff, with one quality inspector. The supplier has no written procedures for corrective actions or complaint handling, no recent new products, no ODM or prominent-brand OEM services, and no SDK. Reported financial indicators and operating revenues are zero for the stated periods, which raises significant credibility concerns, although the underlying reporting context is not explained. Lead times are within 15 workdays in both seasons, but inventory, overseas warehouses, overseas agents, branches, showrooms, and trade-show participation are absent. No customer cases or certifications are...
After-Sales capabilityThe supplier has no written procedures or records for customer complaints or corrective and preventive actions. It also lacks overseas warehouses, overseas showrooms, overseas agents or branches, and has not participated in offline trade shows, although service quotations and payment terms are specified and lead times are within 15 workdays.
Financial creditReported operating revenue, operating cost, gross profit, operating profit, gross margins, and current ratios are all zero across the stated financial periods. The slices do not provide an explanation or corroborating financial documentation, making the reported financial position a material credibility concern.
R&D capabilityThe supplier has no available SDK, reported no new products in the past year, and does not provide ODM services. Although it can customize products, the evidence does not demonstrate ongoing product development or technology innovation.
Customization capabilityThe supplier explicitly provides customization from samples, customization from designs, full customization, and minor customization. These capabilities are reported consistently for both design services and R&D-related design services, supporting a clear customization strength despite the absence of ODM service.

Product Q&A

Q:What is the packaging method?
A:
Small products use small cartons with foam. Medium-sized products use hard cartons. Large quantities use wooden boxes with foam. Heavy products use wooden boxes with cushioning cotton.
Q:What is the delivery time?
A:
Parts delivery takes 3-12 working days depending on quantity. Small orders take 2-5 days (1-2 days if in stock). Generators and large machines take 30-35 days for production. In-stock models take one week.
Q:How do you deliver the goods?
A:
Small quantities are shipped via express (DHL, UPS, FEDEX). Large quantities are shipped by air or sea. For Russia, land transfer by train, air, or EMS is available.
Q:What are the payment terms?
A:
Payment is T/T 30% as deposit and 70% balance before delivery. Photos of products and packages are provided before the balance payment.
Q:Do you have samples?
A:
Sample orders are acceptable. Customers are required to bear the sample cost and the courier cost.

Send Inquiry

*To:Weifang New Ray Ebiz Tech CorpWeifang New Ray Ebiz Tech Corp
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like