Powered by Made-in-China.com
High Load Capacity Doka Formwork Clamp for Concrete Wall Formwork
US$3.80-4.60
2,000 Pieces
Sample price:US$10.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
24 on LineWarranty
1 YearModel NO.
WellFit 20Certification
ISOMaterial
SteelType
ClampRaw Material
Q235 Carbon SteelColor
Silver GalvanizedSurface Treatment
Hot DIP GalvanizedProcessing Method
Forged Integral FormingWeight
2.85kgStandard
En 12811, ISO 9001Transport Package
Pallet or Plywood BoxSpecification
85.5mmTrademark
WellFitOrigin
Shandong, ChinaHS Code
73089000Key features
Forged Integral Structure: One-piece forged construction ensures superior strength and impact resistance.
Hot-Dip Galvanized Finish: Provides long-lasting corrosion protection in harsh construction environments.
Universal Compatibility: Fully compatible with Doka and Peri formwork systems for concrete walls.
High Load Capacity: Designed for rapid and secure connection of concrete formwork panels.
Customizable Weight: Weight ranges from 1.6-2.8 kg/pc and is fully customizable.
Professional R&D Support: Backed by 10 R&D engineers for customized solutions and innovation.
Global Export Experience: Exported to over 20 countries including USA, Germany, and Australia.
Certified Quality: Manufactured to EN 12811 and ISO 9001 standards with strict QA/QC.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization CertifiedExport Year: 10 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.33h
AI-Powered supplier vetting
SummaryRizhao Wellfit Scafform Co., Ltd. is a limited company with 13 employees and an associated company. Its stated product scope is scaffolding and formwork, supported by related metal manufacturing activities. The supplier reports ISO 9001 certification, 10 production lines, 6–10 R&D engineers, 6–10 quality-control staff, ODM and OEM capabilities, and customization from customer designs. Export activity is substantial, with 90% of sales reportedly from exports and 10 years of exporting experience. However, manufacturing capacity is not supported by a valid contract with the factory or related subcontractor, and finished products are checked by packing staff. Overseas service infrastructure is limited: there are no overseas warehouses, showrooms, agents, or branches, and no offline trade-show participation is reported. Financial records are identified for 2022–2024, but no substantive financial results are provided. Customer cases or named brand references are not supplied.
Supplier typeThe supplier is a limited company with 13 employees and an associated company. Its stated product offering is scaffolding and formwork, while its registered business activities include metal structures, construction fittings, forgings, powder metallurgy, and non-ferrous metal products.
CertificationsThe supplier reports ISO 9001 certification. A BV audit is identified with a report period from January 22, 2025 to January 21, 2026, but the audit evaluation result is recorded as 0 without an explained scale or conclusion.
After-Sales capabilityThe supplier has in-stock service capacity and accepts FOB, CIF, CFR, and EXW quotation terms. However, it has no overseas warehouse, showroom, agent, or branch, and its complaint-handling and corrective/preventive-action procedures have no written records; this indicates limited documented after-sales infrastructure.
R&D capabilityThe supplier reports 6–10 years of total R&D engineer experience, ODM service, and full customization from customer designs. It does not have an available SDK; the evidence supports product-development and design adaptation, but not broader software or platform innovation.
Production capacityThe supplier reports 10 production lines, 6–10 quality-control staff, ISO 9001, quality assurance, and annual output information for scaffolding, formwork, and auto parts. However, it has no valid manufacturing-capacity contract with the factory or related subcontractor, and finished-product inspection is performed by packing staff, creating a documented capacity and final-inspection weakness.
Customization capabilityThe supplier explicitly offers customization from designs and full customization, together with ODM and OEM services for popular brands. These statements directly support strong product customization capability.
Product Q&A
Q:What is the warranty period for this clamp?
A:
We provide a 1-year warranty for this forged formwork wedge clamp.
Q:Is the weight of the clamp customizable?
A:
Yes, the weight is customizable and typically ranges from 1.6 to 2.8 kg per piece.
Q:Which formwork systems is this clamp compatible with?
A:
It is fully compatible with Doka and Peri formwork systems.
Q:What material is used for this clamp?
A:
The clamp is made of Q235 Carbon Steel with a hot-dip galvanized surface treatment.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 21 cubic meters (cbm).
Send Inquiry
*To:
Rizhao Wellfit Scafform Co., Ltd
Rizhao Wellfit Scafform Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Multifunctional Rapid Clamp for Wide Clip Distance for Concrete Wall Slab Formwork
US$5.00-9.00
200 Pieces(MOQ)
Rapid Formwork Clamp/Alignment Coupler Bfd for Concrete Walls Shuttering Panel Connection
US$6.00-9.00
500 Pieces(MOQ)
Concrete Steel Wall Formwork Forged Panel Clamps for Peri System
US$10.98-11.00
2,000 Pieces(MOQ)
Spring Clamp with High Weight Capacity for Formwork Stability
US$0.20-0.50
10,000 Pieces(MOQ)
Heavy-Duty Formwork Wedge Clamp for Bfd Doka Framax Clamp Concrete Formwork Assembly
US$3.50-6.50
1,000 Pieces(MOQ)
Durable Doka Framax Clamp for Formwork Wedge Lock Clamp Concrete Shuttering Works
US$3.50-6.50
1,000 Pieces(MOQ)
Doka Clamp Frami for Building Formwork Concrete
US$10.98-11.00
2,000 Pieces(MOQ)
Formwork Multi-Function Clamps for Rigid High Tensile and Panel Infill-Doka Formwork System
US$7.80-10.00
10,000 Pieces(MOQ)
Doka Clamp Casting Formwork Panel Clamp Lock for Concrete Wall Construction
US$3.50-6.50
1,000 Pieces(MOQ)
Concrete Formwork Wedge Clamp Tensioner Panel Connector Rapid Clamp for Building Construction
US$0.49-0.80
1,000 Pieces(MOQ)
Galvanized Formwork Wedge Clamp for Concrete Wall Panel Locking
US$3.90-5.00
500 Pieces(MOQ)
Concrete Wall Formwork Lock Alignment Coupler Bfd Clamp for Formwork Panel
US$7.80-8.50
10,000 Pieces(MOQ)
Framed Wall Formwork Panel Connector/Quick Acting Clamp for Doka Framax Dmp/Ru System
US$5.00-8.00
500 Pieces(MOQ)
Metal Pressed Doka Weld Clamp for Peri Formwork Accessories Concrete
US$6.40-7.50
1,000 Pieces(MOQ)
High Safety Formwork Rapid Clamps for Concrete Formwork
US$0.61
1 Piece(MOQ)
Durable Silver Spring Clamp for Concrete Formwork, 310g Weight
US$0.20-0.50
10,000 Pieces(MOQ)
Quick Release Rapid Clamp for Concrete Formwork Building Materials
US$0.66-0.99
1,000 Pieces(MOQ)
Jahn a Bracket C Clamp for Concrete Forming Snaptie System
US$0.99-1.99
1,000 Pieces(MOQ)
Heavy-Duty Mason Clamp for Concrete Formwork and Shuttering
US$2.18
1,200 Pieces(MOQ)
Doka Peri Slab Panel Clamps Concrete Formwork
US$1.13-1.14
2,000 Pieces(MOQ)



















