SourcingAI
Try for free
Powered by Made-in-China.com
350kw Coal Gas/Natural Gas Generator Set/Generating Set for Power Plant
US$100.00-1,000.00
1 Piece

Product profile

After-sales Service

Provide Technical Support

Warranty

12months

Output Type

AC Three Phase

Model NO.

400GFW

Gas Source

Coal Gas

Certification

CE, TLC, ISO, CCC

Power

>200kW

Standard

Standard

Gen-Set Model

400gfw

Rated Power (Kw)

400

Rated Voltage (V)

400

Rated Current (a)

722

Rated Frequency (Hz)

50/60

Cylinder No.

8

Bore X Stroke (Mm)

300 X 380

Rated Speed (Rpm)

500

Set Size(Mm) (Lxwxh)

6394 X 2058 X 2900

Set Net Weight (Kg)

22000

Transport Package

Poly Plastic Firm, Wooden Box or as Need

Specification

350KW Coal Gas Generator

Trademark

AVESPEED

Origin

Beijing, China

Production Capacity

300 Sets/Month

Key features

High Efficiency Coal Gasification: Produces 1 KW power with only 0.5-1 kg of coal using non-caking or weak-caking anthracite.
Advanced Desulfurization: Removes 90% sulfur content; emissions under 50mg/Nm3, or 5mg/Nm3 with dual devices.
Eco-Friendly Water Recycling: Cooling system water is recycled after simple treatment with no harmful ecological effects.
Compact and Simple Design: Requires small land area, no high pressure steam or turbines, easy to install and start.
Waste Heat Utilization: Exhaust gas can drive waste heat boilers to produce hot water or steam for chillers.
Cost-Effective Solution: Ideal for regions with cheap coal and electricity shortages, replacing expensive HFO or diesel.
Modular Scalability: System supports parallel modular units to generate power from 400kW up to 6.0MW.
Comprehensive Certifications: Product certified with CE, TLC, ISO, and CCC standards for global compliance.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2012-03-21 CertifiedNearest Port: Tianjin, Shanghai, NingboAverage Response Time: ≤5.82h CertifiedTerms of Payment: LC, T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, CFR

About Our Factory & Business Background

AddressRoom 1130, No. 3 Joyful Building of Crcc, Chaoyang District, Beijing, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsHFO Power Plant, Generator Sets, Diesel Generating Set, Diesel Gensets, Natural Gas/Biogas Generator Set, Biomass Power Plant, Marine Generator Set, Marine Engine, Solar Panels, Solar Inverter, Solar Power System, Engine Water Pump

Our Industry Experience & Global Business Record

Main MarketsEurope
Number of Foreign Trading Staff2
Overseas Agent/BranchNo

Product Q&A

Q:What types of coal can be used?
A:
The system is designed for non-caking or weak-caking anthracite and bituminous coal.
Q:What is the sulfur emission level?
A:
With one desulfurization tower, emissions are under 50mg/Nm3; with two, they drop below 5mg/Nm3.
Q:Can the system scale up power output?
A:
Yes, by using parallel modular units, the power output can range from 400kW to 6.0MW.
Q:Is the water usage environmentally safe?
A:
Yes, water in the cooling system is recycled after simple treatment, causing no harm to the environment.
Q:What is the lead time for production?
A:
The average lead time is one month, regardless of whether it is peak or off-peak season.

Send Inquiry

*To:Beijing Avespeed Commercial & Trading Co., LimitedBeijing Avespeed Commercial & Trading Co., Limited
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

125kVA ATS Gas Generator Set for Backup Power

125kVA ATS Gas Generator Set for Backup Power

US$30,000.00-48,000.00
1 Set(MOQ)
Made-in-China.com
1000kw Gas Engine Generator Set, Biogas Plant
Made-in-China.com