Powered by Made-in-China.com
High Efficiency and Low Price Small Forced Circulation Crystallization Equipment
US$100,000.00-900,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
24 Hours OnlineWarranty
1 YearsModel NO.
TKCustomized
CustomizedPerformance
Pressure ResistantStyle
Steel TypeDistilled Method
Direct EvapoatingPrinciple
Regenerative Heat ExchangerStructure Material
Metal MaterialCore
Core Evaporative Heat ExchangerType
Stainless Steel Heating EquipmentApplication
Vaporizer, Heater, Condenser, CoolerHeat Transfer Surface
Tubular Heat ExchangerTransport Package
Seaworthy PackingSpecification
CE, ISO, SGSTrademark
TaikangOrigin
ChinaHS Code
8419899090Production Capacity
200 Per YearKey features
High Heat Transfer Efficiency: Achieves rapid heating and evaporation with reduced energy and steam consumption.
Vacuum Operation: Operates under vacuum to lower evaporation temperature and meet sanitary requirements.
Heat Sensitive Material Processing: Ideal for heat-sensitive, viscous, and foamy materials like milk and pharmaceuticals.
Foam Avoidance: Design prevents foam formation during evaporation and concentration processes.
CIP Cleaning System: Equipped with Clean-in-Place system for convenient, dead-angle-free cleaning.
Automatic Control: Optional automatic system for controlling feed, temperature, viscosity, and safety alarms.
Customized Configuration: Available in customized configurations to meet specific process requirements.
Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: OEM Service AvailableExport Year: 2006-03-10Nearest Port: NINGBO, SHANGHAIAverage Response Time: ≤2.65hTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressNo818, 4th Lane, Binhai Industrial Zone, Longwan District, Wenzhou City, Wenzhou, Zhejiang, China
Plant Area4000 square meters
Number of Employees46
Registered Capital20,800,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsEvaporator, Drying Machine, Tank, Boiler
Production MachinesConfidential
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2006-03-22
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2008
Product Q&A
Q:What is the warranty period?
A:
The equipment comes with a 1-year warranty.
Q:Is the equipment customizable?
A:
Yes, the equipment is fully customized to meet specific needs.
Q:What materials can this system process?
A:
It is suitable for milk, glucose, starch, xylose, pharmaceuticals, biological engineering, and waste liquid recycling.
Q:How long is the lead time?
A:
Lead time is one month during off-peak season and 1-3 months during peak season.
Q:What payment methods are accepted?
A:
We accept LC, T/T, D/P, PayPal, Western Union, and Money Gram.
Send Inquiry
*To:
Zhejiang Taikang Evaporator Co., Ltd.
Zhejiang Taikang Evaporator Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Fuel-Powered Defrosting Equipment in High-Altitude Orchards and Tea Gardens
US$2,500.00-2,700.00
1 Piece(MOQ)
High-Altitude Orchards and Tea Plantations' Land-Based Rotary Deicing Equipment Thawing Equipment
US$2,000.00-2,300.00
1 Piece(MOQ)
Kih-25 High Frequency Induction Heating Equipment
US$500.00-2,000.00
1 Set(MOQ)
High Frequency Induction Heating Equipment for Carbon Furnace
US$400.00-4,000.00
1 set(MOQ)
Factory Price Portable High Frequency Induction Heating Equipment
US$800.00-7,000.00
1 Set(MOQ)
Kih Series Magnetic Induction Welding Equipment
US$400.00-4,000.00
1 set(MOQ)
Heat Treatment Equipment/China Factory Multi-Effect for Chemical Falling Film Forced Circulation Evaporator
US$10,000.00-500,000.00
1 Piece(MOQ)
Heavy-Duty Heat Exchanger Tube Extractor Tube Bundle Pulling Equipment
US$4,800.00-5,000.00
1 Piece(MOQ)
China Factory Heat Treatment Equipment Triple-Effect Forced Circulation for Pharmaceutical Industry Concentrator Evaporator
US$10,000.00-50,000.00
1 Piece(MOQ)
Handheld Induction Heating Machine Rotatable Induction Heating Equipment
US$110.00-150.00
1 Piece(MOQ)
Comprehensive Evaporation Equipment for High Capacity Liquid Processing
US$15,000.00-700,000.00
1 unit(MOQ)
Intelligent Tube Bundle Handling Equipment - PLC Controlled & Anti-Collision Design
US$50,000.00-100,000.00
1 SET(MOQ)
Heat Treatment Equipment/Multi-Effect Forced Circulation for Electroplating Wastewater Evaporator
US$50,000.00-100,000.00
1 Piece(MOQ)
Complete Tube Bundle Extraction Equipment Package - Extractor + Trailer + Tools
US$50,000.00-100,000.00
1 SET(MOQ)
Corn Rice Cassava Material Fresh Cassava Drinking Alcohol/Ethanol Fermentation Equipment Alcohol/Ethanol Distiller
US$20,000.00-3,600,000.00
1 Piece(MOQ)
Frost Protection Equipment for Orchard Overhead Air Equipment
US$2,500.00-2,700.00
1 Piece(MOQ)
Heat Treatment Equipment Automatic for Environmental Engineering Falling Film Vacuum Evaporator
US$50,000.00-100,000.00
1 Piece(MOQ)
Hydraulic Heat Exchanger Extraction Equipment for Heavy-Duty Use
US$4,800.00-5,000.00
1 Piece(MOQ)
Advanced Horizontal Mkcl Crystallizer Equipment for Efficient Crystal Precipitation
US$5,000.00-50,000.00
1 Set(MOQ)
Orchard Tea Garden Greenhouse Terraced Fields Plant Anti-Freezing Equipment
US$2,500.00-2,700.00
1 Piece(MOQ)



















