SourcingAI
Try for free
Powered by Made-in-China.com
Rapid-Assembly Steel Construction Material for Tight Construction Schedules
US$1,000.00
100-499 Tons
US$900.00
500-999 Tons
US$800.00
1,000+ Tons

Product profile

Customization

Available

After-sales Service

Available

Connection Form

Bolt Connection

Model NO.

XF-M029

Feature

Easy To Install

Install

Online Guidance

Material Grade

Q235B / Q355b S235jr / S355jr A36 / A572gr50

Standard

GB / Aisc / Eurocode (Customizable)

Surface Treatment

Painting / Hot-DIP Galvanizing (Optional)

Roof/Wall System

Sandwich Panel/Corrugated Steel Sheet Customizable

Windows/Doors

Customizable

Transport Package

40hc/20gp

Specification

1200.00cm *215.00cm *200.00cm

Trademark

Xinfeng

Origin

China

Company profile

Qingdao Xinfeng Steel Structure Co., Ltd.
Importers and ExportersIn-stock CapacityQuality AssuranceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc.Export Year: 2010-05-01 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.18h

AI-Powered supplier vetting

SummaryThe supplier demonstrates substantial capabilities in customization and production, with strong R&D and ODM services. They possess ISO 9001 certification, ensuring quality in their processes. The supplier has a solid financial track record over the past three years. However, their ability to manage overseas operations is limited, and there is no available SDK for research and development. They have experience in working with well-known brands and adhere to local building codes in international projects.
Supplier typeThe supplier is involved in the sales of various construction and mechanical products, including materials, equipment, and components.
CertificationsThe supplier holds ISO 9001 certification, which indicates a commitment to quality management systems.
Financial creditThe supplier displays financial consistency with positive cash flow and financial capacity over the last three years.
R&D capabilityThe supplier has R&D capabilities with new products introduced in the past year, but lacks SDK availability.
Production capacityThe supplier has a robust production facility with a variety of machines and a capacity of 50,000 tons/year.
Customization capabilityThe supplier offers extensive customization options, including full customization and ODM services.
Client casesThe supplier has completed projects internationally, adhering to local building codes and customer specifications.

Send Inquiry

*To:Qingdao Xinfeng Steel Structure Co., Ltd.Qingdao Xinfeng Steel Structure Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Superior Steel Building Materials for Enduring Construction Needs
Made-in-China.com