SourcingAI
Try for free
Powered by Made-in-China.com
High Conductivity Battery Anode Substrate Pet Composite Copper Foil for Lithium Battery Making
US$69.00
2-5 Bags
US$67.00
6-10 Bags
US$65.00
11+ Bags

Product profile

Customization

Available

Separator Type

N/a

Negative Materials

Copper Foil

Model NO.

PET Copper Foil

Electrolyte

N/a

Cathode Materials

N/a

Type

Copper Foil

Material

Copper Foil

Application

Lithium Battery Production

Other Size

Customized

Cu (Min)

99.9%

Width

280mm

MOQ

2rolls

Direct Factory

with Low Price

Areal Density

24±0.5 G/Cm2

Square Resistance

20±3 MΩ

Resistivity

≤4*10-8 Ω/M

Storage Temperature

≤25°c

Certificate

ISO9001, CE Certificate

OEM&ODM Service

Available

Delivery Time

15-30days After Payment

Serice

Oversea After-Sales Service

Transport Package

1 Roll / Bag

Trademark

AOTELEC

Origin

China

Key features

High Energy Density: PET substrate improves battery energy density with light weight and good ductility.
Customizable Size: Other sizes are customized to meet specific production requirements.
Low MOQ: Minimum order quantity is only 2 rolls, suitable for small batch testing.
Certified Quality: Products hold ISO9001 and CE certificates ensuring safety and compliance.
Fast Delivery: Delivery time is 15-30 days after payment for efficient supply chain.
Overseas Support: Overseas after-sales service and online technical support are available.
Factory Direct: Direct factory supply ensures low price and reliable product quality.

Company profile

XIAMEN AOT ELECTRONICS TECHNOLOGY CO., LTD.
Cooperated with Fortune 500Importers and ExportersFast DeliveryLow MOQ
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Designs, Minor Customization CertifiedExport Year: 6 Years CertifiedNearest Port: Xiamen PortAverage Response Time: ≤2.48h

AI-Powered supplier vetting

SummaryXIAMEN AOT ELECTRONICS TECHNOLOGY CO., LTD. is a China-based trading company established in 2018 with 8 employees. It reports professional technical supplier capability, precision manufacturing and automated control-related offerings, OEM service for popular brands, minor customization and customization from designs, and full after-sales and technical support. However, the evidence also shows no management-system certification, no new products in the past year, one R&D engineer, no 3D design, ODM, SDK, overseas warehouse, overseas showroom, overseas agent or branch, and no participation in offline trade shows. Service-management documentation is weak: no written procedures or records are reported for supplier assessment, corrective actions, or complaint handling. Export sales account for 90%, with service terms including FOB, CIF, CFR and EXW and stated lead times within 15 working days in both seasons. Financial information is only represented by year labels, so credibility cannot be determined from the...
CertificationsThe supplier management-system certification field is explicitly recorded as NIL. This is a stated absence of certification evidence for the relevant management systems.
R&D capabilityThe supplier is identified as a professional technical supplier and has one R&D engineer, but it launched no new products during the past year and does not provide 3D software design, ODM, or SDK services. The evidence indicates limited demonstrated innovation output.
Customization capabilityThe supplier explicitly offers minor customization and customization from customer designs. This supports a defined but limited customization capability; no evidence shows full product development or 3D design support.
Client casesThe supplier states that it provides OEM services for popular brands, which is direct evidence of brand-related OEM experience. No named customers, project details, volumes, or performance records are provided, so the breadth and verifiability of these cases remain limited.

Product Q&A

Q:How long is the delivery time?
A:
Delivery time is 15-30 days after payment. For battery materials, preparation takes 3-5 days, while equipment takes 5-25 days depending on the model and quantity.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 2 rolls.
Q:Can I customize the product size?
A:
Yes, other sizes are customized to meet your specific needs.
Q:What warranty do you provide?
A:
Warranty for equipment is 1 or 2 years (12 or 24 months depending on the product type). If parts are damaged due to non-human factors within one year, we provide free replacement parts.
Q:Can I print my logo on the product?
A:
Yes, your logo can be printed on products or packages using hot stamping, printing, embossing, UV coating, silk-screen printing, or stickers.

Send Inquiry

*To:XIAMEN AOT ELECTRONICS TECHNOLOGY CO., LTD.XIAMEN AOT ELECTRONICS TECHNOLOGY CO., LTD.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Lithium Battery Anode Substrate High Pure Copper Mesh Foil
Made-in-China.com
Copper Foil for Battery Anode Substrate

Copper Foil for Battery Anode Substrate

US$95.00-100.00
1 Roll(MOQ)
Made-in-China.com