Powered by Made-in-China.com
Air Pollution Purification Device Exhaust Treatment System
US$899.00-15,000.00
1 Piece
Product profile
Customization
AvailableWarranty
1 YearType
Exhaust Gas TreatmentModel NO.
XC-1Structure
Floor StandingUsage
IndustryCertification
CE, ISO, RoHSPower Source
ElectricalOperating Principle
Active + PassivePurifying Technology
CompoundAir Volume
>0m3/HApplication Area
According to The SizeMaterials
PP Polypropylene MaterialService Life
8-10 YearsFeature
Acid Alkali and Corrosion ResistanceColor
Grey/BeigeService
Offer After-Sales ServiceFunction
Waste Gas Treatment/Exhaust Air PurificationWarranty Period
1 YearEnvironmental Temperature
-15℃ to 80℃Advantages
Easy to Operate and InstallShape
Round/RectangularThickness
8-15mmCondition
NewStandard
StandardPlace of Origin
Guangdong, ChinaPackage
Wooden BoxTransport Package
Bare PackingSpecification
CustomizedTrademark
XichengOrigin
ChinaHS Code
8421399090Production Capacity
10000000pieces/YearKey features
Customizable Structure: Floor standing structure and round/rectangular shapes can be customized per customer drawings.
Corrosion Resistance: Made of PP polypropylene material, offering strong acid, alkali, and corrosion resistance.
High Efficiency: Effective dust removal and desulfurization with low energy consumption and stable operation.
Easy Installation: Compact design occupies less space and is easy to install and maintain.
Professional Support: Professional engineers provided for installation guidance and after-sales service.
CE Certified: Product meets CE, ISO, and RoHS certification standards for quality assurance.
Wide Application: Suitable for industrial waste gas treatment and exhaust air purification.
Long Service Life: Designed for 8-10 years of service life with one-year quality assurance.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples CertifiedExport Year: 1 Year CertifiedNearest Port: Shenzhen Port, Guangzhou PortAverage Response Time: ≤7.68h
About Our Factory & Business Background
AddressN0.2007, BUILDING 1, COFCO YUNJING PLAZA, HESHUIKOU COMMUNITY, MATIAN STREET, GUANGMING DISTRICT, SHENZHEN
Plant Area56 square meters
Number of Employees11
Registered Capital500,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 Set
Supply Chain Partners8
Our Production Capability & Technical Expertise
Main ProductsEnvironmental Protection Equipment
Production Lines5
Production MachinesInjection molding machine, Engraving machine, Butt welding machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2023-05-06
Main MarketsSouth America, Southeast Asia/ Mideast, Africa
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff7
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period?
A:
We provide a one-year warranty covering repair and replacement services.
Q:Can the equipment size be customized?
A:
Yes, we can customize different sizes and requirements according to your needs and drawings.
Q:What material is used for the tower?
A:
The equipment is made of PP (Polypropylene) material, which offers corrosion and wear resistance.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays for both peak and off-season periods.
Send Inquiry
*To:
XICHENG EP(CN) LTD
XICHENG EP(CN) LTD*Content:
Supplier replies will be sent to your registered email
You may also like
Air Pollution Control Device Chlorine Gas Wet Scrubber System
US$899.00-15,000.00
1 Piece(MOQ)
Air Pollution Control Device PP Exhaust Gas Scrubber System
US$800.00-10,000.00
1 pcs(MOQ)
Customized Industrial Air Purification Systems for Effective Emission Control
US$999.00-7,000.00
1 Piece(MOQ)
Flue Gas Purification System for Air Pollution Treatment
US$899.00-15,000.00
1 Piece(MOQ)
High-Quality Systems for Exhaust Air Purification Ammonia Treatment Scrubber System
Negotiable
1 Piece(MOQ)
Integrated Container Dissolved Air Flotation Unit Fully Assembled Custom Specification Industrial Sewage Treatment System
US$3,700.00-4,200.00
1 Piece(MOQ)
Stable Wastewater Dissolved Air Flotation Equipment System for Water Treatment
US$2,000.00-2,500.00
1 Piece(MOQ)
Enclosed Ground Flare System for Petrochemical Exhaust Gas Treatment
US$7,000.00-5,000,000.00
1 Set(MOQ)
Huaxin Xf Factory-Wide Dust Suppression System for Air Purification
US$1,300.00-1,400.00
1 Piece(MOQ)
Advanced Carbon Filtration System for Industrial Air Purification
US$499.00-5,000.00
1 Piece(MOQ)
Daf System for Mining Waste Water Treatment
US$3,000.00
1 Piece(MOQ)
High-Performance Air Purification System for Waste Gas Control
US$499.00-5,000.00
1 Piece(MOQ)
Sewage Flotation Equipment Daf Water Treatment System Made-in-China
US$3,700.00-4,200.00
1 Piece(MOQ)
Thermal Catalytic Oxidation Rco System for Industrial Vocs Exhaust Gas Purification
US$1,000.00-100,000.00
1 Set(MOQ)
Made-in China Price Zeolite Wheel Concentration System for Waste Gas Purification
US$990.00-1,000.00
1 Piece(MOQ)
Premium Air Quality Solutions: Advanced Gas Purification Systems
US$750.00-9,999.00
1 Piece(MOQ)
Customized Dust Extractor System for Enhanced Air Quality Control
US$5,000.00-10,000.00
1 Piece(MOQ)
Mist Dust Suppression System Ultra Fine Mist Device Dry Fog System
US$3,200.00-4,900.00
1 Piece(MOQ)
Waste Gas Biogas Flare - Enclosed Low-Emission Flare System for Air Pollution Mitigation
US$1,000.00-5,000,000.00
1 Set(MOQ)



















