SourcingAI
Try for free
Powered by Made-in-China.com
MDF / HDF Multi-Openings Production Line with Capacity of 200~2000cbm/ Day OSB/Pb
US$1,680,000.00-60,000,000.00
1 Set

Product profile

Customization

Available

Type

Hot Press Machine

Automatic

Automatic

Model NO.

mdf multi line

Certification

ISO

Capacity

200-2000cbm

Customized Design

Available

Power Installation

Min. 1600 Kw

Land Required

Min 30000 Sqm

Remote Online Troubleshooting

Available

Installation Service

Supervision Available

Applicable Tree Species

All Trees Like Poplar/Eucalyptus/Pine/Birch etc.

Transport Package

Container /Bb Cargo

Specification

4X8FT 6X9FT

Trademark

GINZHUO

Origin

Linyin, China

HS Code

8465920000

Production Capacity

20 Sets/Year

Key features

High Capacity Production: Daily capacity ranges from 200 to 2000 cubic meters for MDF/HDF/OSB lines.
Customized Design Available: Full customization options including design, samples, and flexible modifications.
Ultra-Low Emission System: Wet ESP technology achieves outlet particulate concentration under 10mg/Nm3.
Versatile Material Processing: Suitable for all tree species including poplar, eucalyptus, pine, and birch.
Advanced Hot Press Technology: 15-48 openings with small gear opening, short auxiliary time, and low sanding intensity.
Comprehensive Energy Plant: Utilizes biomass waste with calorific value 18.5-65MW for drying and heating.
Global After-Sales Support: On-site service provided worldwide with 24-hour quick feedback for technical issues.
Free Technical Training: Complimentary training for client production process technical personnel.

Company profile

Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.
Experienced TeamYears of Export ExperiencePatents AwardedHigh Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤4.18h

About Our Factory & Business Background

AddressXiaoxinghua Village, Liuqing Sub-Disrtict, Lanshan, Linyi, Shandong, China
Plant Area21000 square meters
Number of Employees138
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners30

Our Production Capability & Technical Expertise

Main ProductsParticle Board Production Line, MDF Production Line, OSB Production Line, Energy Plant and Drying System, Plywood Production Line
Production Lines2
Production MachinesBending Machine, CNC Center, CNC Machine, Drilling Machine, Laser Cutting Machine, Laser Cutting Machine, Lathe, Painting Room, Planomiller, Sawing machine, Shot blasting Machine, Weliding Machine, Flame cutting machine, Planogrider
QA/QC inspectors5 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers40 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2006-05-29
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff8
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the daily production capacity?
A:
The capacity ranges from 200 to 2000 cubic meters per day depending on the configuration.
Q:Can the machine be customized?
A:
Yes, customized design is available with options for full customization, minor customization, and flexible customization based on samples or designs.
Q:What types of wood can be processed?
A:
The system is applicable to all tree species, including poplar, eucalyptus, pine, birch, and others.
Q:What is the emission level of the dust collector?
A:
The ultra-low discharge wet ESP system achieves an outlet particulate concentration of less than 10mg/Nm3.
Q:What is the lead time for production?
A:
The average lead time is 3-6 months for both peak and off-peak seasons.

Send Inquiry

*To:Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

MDF/HDF Production Line with Continuous Press Line

MDF/HDF Production Line with Continuous Press Line

US$2,500,000.00-3,300,000.00
1 set(MOQ)
Made-in-China.com
Minghung Capacity 100000cbm/Year MDF/HDF Production Line

Minghung Capacity 100000cbm/Year MDF/HDF Production Line

US$2,000,000.00-5,000,000.00
1 set(MOQ)
Made-in-China.com
HDF /MDF Pb /OSB Production Line with Minimum Output 30000m3
Made-in-China.com
OSB Multi-Openings Production Line with Capacity of 100~700 M³ / Day
Made-in-China.com
4X8FT MDF Production Line 30, 000 M3 Capacity

4X8FT MDF Production Line 30, 000 M3 Capacity

US$2,000,000.00-2,400,000.00
1 Set(MOQ)
Made-in-China.com