SourcingAI
Try for free
Powered by Made-in-China.com
MDF Production Line Chipboard Machinery 200-2000 Cbm/Day High Production Capacity
US$1,680,000.00-60,000,000.00
1 Set

Product profile

Customization

Available

Type

Hot Press Machine

Automatic

Automatic

Model NO.

mdf multi line

Certification

ISO

Capacity

300-2000cbm

Customized Design

Available

Power Installation

Min. 1600 Kw

Land Required

Min 30000 Sqm

Remote Online Troubleshooting

Available

Installation Service

Supervision Available

Applicable Tree Species

All Trees Like Poplar/Eucalyptus/Pine/Birch etc.

Transport Package

Container /Bb Cargo

Specification

4X8FT 6X9FT

Trademark

GINZHUO

Origin

Linyin, China

HS Code

8465920000

Production Capacity

20 Sets/Year

Key features

High Production Capacity: Daily output ranges from 200 to 2000 cubic meters per day for MDF production lines.
Customizable Design: Offers customized design options including capacity, power installation, and land requirements.
Ultra-low Emission System: Wet ESP technology achieves outlet particulate concentration of less than 10mg/Nm3.
Energy Saving Heat Plant: Utilizes biomass waste with calorific value 18.5-65MW for efficient drying and pressing.
Automatic Operation: Fully automatic detection and unmanned control for simple operation and high efficiency.
Long Component Life: Low failure rate and low maintenance costs due to durable hot press machine components.
Global After-sales Service: Provides on-site service and free technical training for personnel worldwide.
30 Years Experience: Over 300 production lines running globally with 30 years of industry expertise.

Company profile

Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.
Experienced TeamYears of Export ExperiencePatents AwardedHigh Repeat Buyers Choice
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 18 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.26h

About Our Factory & Business Background

AddressXiaoxinghua Village, Liuqing Sub-Disrtict, Lanshan, Linyi, Shandong, China
Plant Area21000 square meters
Number of Employees138
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 3-6 months Off Season Lead Time: 3-6 months
Minimum Order Quantity1 Set
Supply Chain Partners30

Our Production Capability & Technical Expertise

Main ProductsParticle Board Production Line, MDF Production Line, OSB Production Line, Energy Plant and Drying System, Plywood Production Line
Production Lines2
Production MachinesBending Machine, CNC Center, CNC Machine, Drilling Machine, Laser Cutting Machine, Laser Cutting Machine, Lathe, Painting Room, Planomiller, Sawing machine, Shot blasting Machine, Weliding Machine, Flame cutting machine, Planogrider
QA/QC inspectors5 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers40 people
Traceability of Raw MaterialsYes
Own BrandYes

Our Industry Experience & Global Business Record

Year of Establishment2006-05-29
Main MarketsDomestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff8
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:What is the production capacity of the MDF line?
A:
The production capacity ranges from 200 to 2000 cubic meters per day, customizable based on specific needs.
Q:Is the machine automatic?
A:
Yes, the equipment is fully automatic with complete automatic detection and support for unmanned control.
Q:What certifications does the machinery have?
A:
The machinery holds ISO certification, ensuring quality and safety standards.
Q:Can the design be customized?
A:
Yes, customized design is available, including adjustments for capacity, power installation, and land requirements.
Q:What is the lead time for production?
A:
The average lead time is 3-6 months, applicable for both peak and off-peak seasons.

Send Inquiry

*To:Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.Linyi Xingteng Wood-Based Panel Machinery Co. Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Pre Press Machine for Efficient MDF/Chip Board Production Line
Made-in-China.com