SourcingAI
Try for free
Powered by Made-in-China.com
1/2" DN15 Carbon Steel High Pressure Butt Weld Pipe End Cap
US$1.00-99.00
100 Pieces
Sample price:US$0.00/piece.Request sample

Product profile

Customization

Available

After-sales Service

7*24h

Warranty

18months

Model NO.

1/2" DN15

Head Code

Round

Connection

Welding

Shape

Equal

Material

Carbon Steel

Technics

Forged

Certification

ISO, ANSI, DIN, JIS, ASME, GB, BS, SH, HG, CE, CCS

Special Function

High Voltage, Anti Corrosion, Good Elasticity, Low Value Steel

Application

Chemical

Port of Delivery

Tianjin

Surface Treatment

Mirror Polish, Matt Finish, Sand-Blasting

Size

1/2-24

Coating

Black Painted;Hit Galvanized

Transport Package

Wooden Case

Specification

1/2" DN15

Trademark

XINQI

Origin

China

HS Code

730793

Production Capacity

1000pieces/Day

Key features

Comprehensive Certifications: ISO, ANSI, DIN, JIS, ASME, GB, BS, SH, HG, CE, CCS compliant.
Wide Size Range: Available in sizes from 1/2 inch to 24 inches (DN15-DN1200).
Multiple Material Options: Carbon steel and stainless steel grades including 304, 316, 316L, etc.
High Pressure Capability: Designed for high voltage and high temperature applications.
Customizable Surface Treatment: Mirror Polish, Matt Finish, Sand-Blasting, Black Painted, Hot Galvanized.
Forged Manufacturing Process: High-quality forged technics ensuring durability and strength.
24/7 After-Sales Support: Round-the-clock technical consultation and installation guidance available.
Diverse Wall Thickness: Options include SCH5 through SCH160 to meet various pressure needs.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2003-08-06Nearest Port: Tianjin Xingang PortAverage Response Time: ≤4.21hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW

About Our Factory & Business Background

AddressNo. 107 Xiwang Ave Xiwang New Industry Zone, Cangzhou, Hebei, China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsCompensator, Metal Bellows, Expansion Joint, Dismantling Joint, Flanges, Elbow & Bend, Tee & Cross, Reducer, Cap, Lap Joint Stub End

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What materials are available for the pipe cap?
A:
We offer carbon steel and stainless steel materials including 304, 304L, 316, 316L, 321, 2520, 310, 317, WPBA234, Q235, 20#, A420, A403-WP304, A403-WP316, A403-WP316L, A403-WP317, and A403-WP321.
Q:What is the size range of the pipe cap?
A:
The pipe cap is available in sizes ranging from 1/2 inch to 24 inches (DN15 to DN1200).
Q:Can the surface treatment be customized?
A:
Yes, we provide customized surface treatments including Mirror Polish, Matt Finish, Sand-Blasting, Black Painted, and Hot Galvanized.
Q:What certifications does the product hold?
A:
The product holds ISO, ANSI, DIN, JIS, ASME, GB, BS, SH, HG, CE, and CCS certifications.
Q:What is the lead time for production?
A:
The average lead time is one month, applicable for both peak and off-peak seasons.

Send Inquiry

*To:Hebei Xinqi Pipeline Equipment Co., Ltd.Hebei Xinqi Pipeline Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like