SourcingAI
Try for free
Powered by Made-in-China.com
Rockwool Insulation Materials for Enhanced Fire Resistance Construction
US$300.00-600.00
1 Bag
Sample price:US$0.00/bag.Request sample

Product profile

Customization

Available

Fire Resistance Level

High

Form

Rockwool

Model NO.

F-16D

Production Method

Melting Method

Temperature

≤1000℃

Type

High Alumina Fiber

Color

Graygreen

Wt

>55

Country

China

Quality

CE

Transport Package

by Sea

Specification

25KG

Trademark

NewTime Foundation

Origin

From China

HS Code

6806109001

Production Capacity

30000 Tons/Year

Key features

Class A1 Fire Resistance: Certified non-combustible material with fire resistance up to 1-3 hours for steel structures.
Flexible Customization: Offers full customization, minor customization, and flexible options based on samples or designs.
Rapid Production Lead Time: Standard lead time of 10-15 working days after deposit confirmation.
ISO and CE Certified: Products comply with international standards including ISO, CE, and ROHS certifications.
Free Sample Availability: Free samples provided for quality inspection; customer covers shipping costs.
Seaworthy Packaging: Professional waterproof wooden cases prevent damage and moisture during long-distance transport.

Company profile

Hebei Newtime Foundation Fire Insulation Materials Manufacturing Co., Ltd.
Importers and ExportersSelf-brandedManagement CertificationCustomization from Samples
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 14 years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.52h

AI-Powered supplier vetting

SummaryThe supplier is identified as a trading company, while its stated business scope covers manufacturing and sales of fireproof, thermal insulation, sound insulation, coating, mechanical-part processing, and building materials. It reports ISO9001:2015, ISO45001:2018, and ISO14001 management-system certifications, plus quality-control assurance and documented complaint and corrective-action procedures. The supplier supports extensive customization and reports new products during the past year, but does not provide 3D software design services. It has inventory capability, stated peak- and off-season lead times within 15 working days, and has exported for 14 years. However, it lacks an effective manufacturing-capacity contract with related subcontractors, overseas warehouses, overseas showrooms, and overseas agents or branches. Customer-case evidence is limited: it reports no Fortune 500 cooperation but an 80%–100% repeat-buyer preference.
CertificationsThe supplier reports ISO9001:2015, ISO45001:2018, and ISO14001 management-system certificates. It also reports a factory environmental impact assessment and regular fire drills during the past year, while the product-compliance certification is listed only as “Others,” so the specific product standard certification is not identified.
After-Sales capabilityThe supplier has clear procedures and followed records for corrective and preventive actions and customer-complaint handling. Finished-product inspection instructions are also reported to be uniformly followed, providing explicit evidence of structured quality and service follow-up processes.
R&D capabilityThe supplier reports that it had new products during the past year, which is direct evidence of recent product-development activity. However, it does not provide 3D software design services, limiting the demonstrated scope of its digital design capability.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. This is consistent across the two slices and demonstrates broad stated customization coverage, despite the absence of 3D software design services.

Product Q&A

Q:What shipping methods do you support?
A:
We support various shipping methods, including [sea freight, air freight, express delivery, and land transportation]. We will choose the most cost-effective way according to your destination.
Q:How long is the production lead time?
A:
The standard production lead time is [10-15 working days] after receiving your deposit and confirming the order details. For large orders, the lead time will be extended appropriately.
Q:How to ensure the product safety during transportation?
A:
We use professional [seaworthy wooden cases /waterproof packaging] to pack the products, which can effectively prevent damage and moisture during long-distance transportation. We will also track the logistics status in real-time.
Q:Does this product meet international certifications?
A:
Yes. Our product has passed [ISO, CE, ROSH] certifications. It complies with international quality standards and is widely recognized in different markets.
Q:Can you provide a free sample?
A:
Sure. We can provide free samples for quality inspection. The shipping cost needs to be borne by the customer.

Send Inquiry

*To:Hebei Newtime Foundation Fire Insulation Materials Manufacturing Co., Ltd.Hebei Newtime Foundation Fire Insulation Materials Manufacturing Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like