CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.23hTerms of Payment: LC, T/T, D/P, etc.
About Our Factory & Business Background
AddressFactory Area on The West Side of North Guangzhou Road, Jiaozhou District, Qingdao, Shandong, China
International Commercial Terms(Incoterms)FOB, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 kg
Supply Chain Partners12
Our Production Capability & Technical Expertise
Main ProductsElectric Power Single-Pipe Transmission Tower, Electric Power Angle Steel Transmission Tower, Electric Power Combined Steel Pipe Transmission, Single-Pipe Signal Tower, Angle Steel Signal Tower, Three-Pipe Signal Tower, Steel Structure Workshop, Custom Processing and Welding of Metal Products, Custom Processing and Welding of Steel Products, Production and R&D of Steel Products
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2015-09-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Management System CertificationISO45001:2018, ISO14001, ISO9001:2015
Product Q&A
Q:What is the minimum order quantity?
A:
Standard items like poles have an MOQ of 1 piece for trial orders. Custom towers vary with design; small batches are discussed for new partners.
Q:Do you offer OEM/ODM services?
A:
Yes, our team tailors solutions based on drawings, wind load, and soil. We match brand specs including painting, logos, and designs.
Q:How do you ensure tower quality?
A:
We use a 3-Stage Quality Control process: Raw Material Inspection, In-Process Inspection of welding and drilling, and Final 100% check on dimensions and galvanization.
Q:What is the production lead time?
A:
Typical lead time is 15-25 days after deposit and drawings. Urgent orders can be prioritized upon contact.
Q:What are the payment terms?
A:
Standard terms are 30% T/T deposit and 70% pre-shipment. For large projects, L/C or flexible terms can be discussed.
Send Inquiry
*To:Qingdao Xinyuanzhou Electric Power Equipment Co., Ltd
*Content:
0/4000
Supplier replies will be sent to your registered email