SourcingAI
Try for free
Powered by Made-in-China.com
Factory Direct Wind-Resistant Heavy-Duty Tower for Microwave Link
US$850.00-1,100.00
1 Ton

Product specifications

Tower Type

Tower Height

Surface Treatment

Sample price:US$15.00/kg.Request sample

Product profile

Customization

Available

Structure

Four-Post Angle Tower, Four-Post Angle Tower

Shape

Angle, Angle

Model NO.

AST

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

Cross Type

Certification

ISO, GS, RoHS, CE

Condition

New

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

K-Type

Certification

ISO, CE

Condition

New

Load Capacity

200kg - 2000kg (Antenna Load)

Material Grade

Q235B / Q345b Carbon Steel

OEM/ODM Service

Available

Galvanization Type

Hot-DIP Galvanized, ≥85μm

Transport Package

Wooden Pallets, Anti-Collision Design, Waterproof

Trademark

xinyuanzhou

Origin

China

HS Code

7308200000

Production Capacity

85000t/Years

Key features

High Wind Resistance: Resists wind speeds from 35m/s to 60m/s, customizable per regional design standards.
Customizable Dimensions: Height adjustable from 10m to 100m and load capacity from 200kg to 2000kg.
OEM & ODM Services: Full customization available based on load, height, wind speed, and environmental requirements.
Multi-Standard Compliance: Certified under ISO 9001, ISO 14001, CE, GB/T 50011, TIA/EIA-222, and IEC 60825.
Modular Assembly: Symmetric lattice truss structure with bolted modular design for easy on-site installation.
Comprehensive Warranty: 1-2 year warranty against manufacturing defects plus 10-year corrosion warranty for galvanized towers.

Company profile

Qingdao Xinyuanzhou Electric Power Equipment Co., Ltd
Importers and ExportersPatents AwardedFull CustomizationFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.27hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressFactory Area on The West Side of North Guangzhou Road, Jiaozhou District, Qingdao, Shandong, China
International Commercial Terms(Incoterms)FOB, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 kg
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsElectric Power Single-Pipe Transmission Tower, Electric Power Angle Steel Transmission Tower, Electric Power Combined Steel Pipe Transmission, Single-Pipe Signal Tower, Angle Steel Signal Tower, Three-Pipe Signal Tower, Steel Structure Workshop, Custom Processing and Welding of Metal Products, Custom Processing and Welding of Steel Products, Production and R&D of Steel Products
Production Lines1
Production MachinesLaser cutting machine, Cutting machine, Grinding machine, Fiber optic cutting machine, Bending machine, Drilling machine, Pressing machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-09-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO45001:2018, ISO14001, ISO9001:2015

Product Q&A

Q:What is the Minimum Order Quantity (MOQ)?
A:
Standard items like poles have an MOQ of 1 piece for trial orders. Custom towers vary with design; small batches are discussed for new partners.
Q:Do you offer OEM/ODM services?
A:
Yes, our team tailors solutions based on drawings, wind load, and soil. We match brand specs including painting, logos, and designs.
Q:How do you ensure tower quality?
A:
We use a 3-Stage Quality Control process: Raw Material Inspection (certified steel), In-Process Inspection (welding/drilling), and Final Inspection (100% check on dimensions and galvanization).
Q:What is the production lead time?
A:
Typical lead time is 15-25 days after deposit and drawings. Urgent orders can be prioritized upon contact.
Q:What are the payment terms?
A:
Standard terms are 30% T/T deposit and 70% pre-shipment. For large projects, L/C or flexible terms can be discussed.

Send Inquiry

*To:Qingdao Xinyuanzhou Electric Power Equipment Co., LtdQingdao Xinyuanzhou Electric Power Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Factory Direct Supply Steel Structure Monopole Tower
Made-in-China.com