SourcingAI
Try for free
Powered by Made-in-China.com
Hot Galvanized Wind Resistant 5g Wireless Angle Steel Signal Tower
US$1,100.00
1-9 Tons
US$1,000.00
10-49 Tons
US$900.00
50-99 Tons
US$800.00
100+ Tons
Sample price:US$2.80/kg.Request sample

Product profile

Customization

Available

Structure

Four-Post Steel Tube Tower, Four-Post Angle Tower

Shape

Angle, Angle

Model NO.

AST

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

Cross Type

Certification

ISO, GS, RoHS, CE

Condition

New

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

K-Type

Certification

ISO, CE

Condition

New

Load Capacity

200kg - 2000kg (Antenna Load)

Material Grade

Q235B / Q345b Carbon Steel

OEM/ODM Service

Available

Galvanization Type

Hot-DIP Galvanized, ≥85μm

Transport Package

Wooden Pallets, Anti-Collision Design, Waterproof

Trademark

xinyuanzhou

Origin

China

HS Code

7308200000

Production Capacity

85000t/Years

Key features

Long Service Life: Design life of 50+ years with 30-year structural life and 10-year corrosion warranty.
High Wind Resistance: Resists wind speeds from 35m/s to 60m/s, customizable per regional standards.
Customizable Dimensions: Height adjustable from 10m to 100m and load capacity from 200kg to 2000kg.
OEM & ODM Services: Full customization available for design, load, height, wind speed, and environment.
Modular Assembly: Bolted modular design allows for quick on-site installation and easy transport.
Strict Quality Control: 3-stage QC process including 100% final inspection and certified raw materials.
Global Certifications: ISO 9001, ISO 14001, CE certified with compliance to GB/T and TIA/EIA-222 standards.

Company profile

Qingdao Xinyuanzhou Electric Power Equipment Co., Ltd
Importers and ExportersPatents AwardedFull CustomizationFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤1.56hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressFactory Area on The West Side of North Guangzhou Road, Jiaozhou District, Qingdao, Shandong, China
International Commercial Terms(Incoterms)FOB, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 kg
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsElectric Power Single-Pipe Transmission Tower, Electric Power Angle Steel Transmission Tower, Electric Power Combined Steel Pipe Transmission, Single-Pipe Signal Tower, Angle Steel Signal Tower, Three-Pipe Signal Tower, Steel Structure Workshop, Custom Processing and Welding of Metal Products, Custom Processing and Welding of Steel Products, Production and R&D of Steel Products
Production Lines1
Production MachinesLaser cutting machine, Cutting machine, Grinding machine, Fiber optic cutting machine, Bending machine, Drilling machine, Pressing machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-09-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO45001:2018, ISO14001, ISO9001:2015

Product Q&A

Q:What is your Minimum Order Quantity (MOQ)?
A:
Standard items like poles have an MOQ of 1 piece for trial orders. For custom towers, MOQ varies with design complexity, and we are open to small batches for new partners.
Q:Can you provide OEM/ODM services?
A:
Yes. Our engineering team can tailor solutions to your drawings, wind load, and soil conditions, including custom painting, logos, and structural designs.
Q:How do you guarantee the quality of your towers?
A:
We use a 3-Stage Quality Control process: Raw Material Inspection with certified steel, In-Process Inspection for welding and drilling, and Final 100% inspection on dimensions and galvanization thickness before packing.
Q:What is your production lead time?
A:
Typically 15-25 working days after deposit and final drawings. For urgent orders, please contact us to prioritize your project.
Q:What are your payment terms?
A:
Standard terms are 30% T/T deposit upfront and 70% balance before shipment. For large projects, we can discuss L/C at sight or flexible terms.

Send Inquiry

*To:Qingdao Xinyuanzhou Electric Power Equipment Co., LtdQingdao Xinyuanzhou Electric Power Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like