SourcingAI
Try for free
Powered by Made-in-China.com
Low Transport Cost Split Angle Steel Signal Tower for Border Station
US$850.00-1,100.00
1 Ton

Product specifications

Tower Type

Tower Height

Surface Treatment

Sample price:US$15.00/kg.Request sample

Product profile

Customization

Available

Structure

Four-Post Angle Tower

Shape

Angle

Model NO.

AST

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

K-Type

Certification

ISO, CE

Condition

New

Load Capacity

200kg - 2000kg (Antenna Load)

Material Grade

Q235B / Q345b Carbon Steel

OEM/ODM Service

Available

Galvanization Type

Hot-DIP Galvanized, ≥85μm

Transport Package

Wooden Pallets, Anti-Collision Design, Waterproof

Trademark

xinyuanzhou

Origin

China

HS Code

7308200000

Production Capacity

85000t/Years

Key features

Long Service Life: Design life of 50 years under normal operating conditions with 30-year structural lifespan.
High Wind Resistance: Resists wind speeds from 35m/s to 60m/s, customizable per regional standards.
Customizable Dimensions: Height adjustable from 10m to 100m to fit specific project requirements.
Flexible Load Capacity: Antenna load capacity ranges from 200kg to 2000kg, customizable for multi-antenna setups.
OEM & ODM Services: Full customization available based on drawings, wind load, soil, and brand specifications.
Modular Assembly: Symmetric lattice truss structure with bolted modular design for easy on-site installation.
Comprehensive Quality Control: 3-stage QC process including raw material, in-process, and final 100% dimensional checks.

Company profile

Qingdao Xinyuanzhou Electric Power Equipment Co., Ltd
Importers and ExportersPatents AwardedFull CustomizationFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.09hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressFactory Area on The West Side of North Guangzhou Road, Jiaozhou District, Qingdao, Shandong, China
International Commercial Terms(Incoterms)FOB, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 kg
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsElectric Power Single-Pipe Transmission Tower, Electric Power Angle Steel Transmission Tower, Electric Power Combined Steel Pipe Transmission, Single-Pipe Signal Tower, Angle Steel Signal Tower, Three-Pipe Signal Tower, Steel Structure Workshop, Custom Processing and Welding of Metal Products, Custom Processing and Welding of Steel Products, Production and R&D of Steel Products
Production Lines1
Production MachinesLaser cutting machine, Cutting machine, Grinding machine, Fiber optic cutting machine, Bending machine, Drilling machine, Pressing machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-09-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO45001:2018, ISO14001, ISO9001:2015

Product Q&A

Q:Minimum Order Quantity (MOQ)?
A:
Standard items like poles have an MOQ of 1 piece for trial orders. Custom towers vary with design; small batches are discussed for new partners.
Q:OEM/ODM services?
A:
Yes, our team tailors solutions based on drawings, wind load, soil, and brand specs, including painting, logos, and designs.
Q:How do you ensure tower quality?
A:
We use a 3-Stage Quality Control process: Raw Material Inspection (certified steel), In-Process Inspection (welding/drilling), and Final Inspection (100% check with photos/videos).
Q:Production lead time?
A:
Typically 15-25 days after deposit and drawings. Urgent orders can be prioritized upon contact.
Q:Payment terms?
A:
Standard terms are 30% T/T deposit and 70% pre-shipment (or B/L copy). L/C or flexible terms are available for large projects.

Send Inquiry

*To:Qingdao Xinyuanzhou Electric Power Equipment Co., LtdQingdao Xinyuanzhou Electric Power Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like