SourcingAI
Try for free
Powered by Made-in-China.com
Welded Data Center Matching Angle Steel Signal Tower
US$850.00-1,100.00
1 Ton
Sample price:US$2.80/kg.Request sample

Product profile

Customization

Available

Structure

Four-Post Steel Tube Tower, Four-Post Angle Tower

Shape

Angle, Angle

Model NO.

AST

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

Cross Type

Certification

ISO, GS, RoHS, CE

Condition

New

Standard

Standard

Material

Angle Steel Tower

Belly Bar Shape

K-Type

Certification

ISO, CE

Condition

New

Load Capacity

200kg - 2000kg (Antenna Load)

Material Grade

Q235B / Q345b Carbon Steel

OEM/ODM Service

Available

Galvanization Type

Hot-DIP Galvanized, ≥85μm

Transport Package

Wooden Pallets, Anti-Collision Design, Waterproof

Trademark

xinyuanzhou

Origin

China

HS Code

7308200000

Production Capacity

85000t/Years

Key features

High Wind Resistance: Resists wind speeds from 35m/s to 60m/s, customizable per regional standards.
Customizable Dimensions: Height adjustable from 10m to 100m; load capacity 200kg-2000kg.
OEM & ODM Services: Full customization available for design, load, height, wind speed, and environment.
Premium Material Grade: Constructed with Q235B/Q345B carbon steel or ASTM A36/A572 Grade 50.
Robust Seismic Resistance: Meets GB/T 50011 standard with seismic fortification intensity up to 8 degrees.
Modular Assembly: Symmetric lattice truss structure with high-strength bolted connection for easy installation.
Comprehensive Certifications: ISO 9001, ISO 14001, CE certified with third-party test reports available.

Company profile

Qingdao Xinyuanzhou Electric Power Equipment Co., Ltd
Importers and ExportersPatents AwardedFull CustomizationFast Delivery
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤0.91hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressFactory Area on The West Side of North Guangzhou Road, Jiaozhou District, Qingdao, Shandong, China
International Commercial Terms(Incoterms)FOB, DAT, CPT
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 kg
Supply Chain Partners12

Our Production Capability & Technical Expertise

Main ProductsElectric Power Single-Pipe Transmission Tower, Electric Power Angle Steel Transmission Tower, Electric Power Combined Steel Pipe Transmission, Single-Pipe Signal Tower, Angle Steel Signal Tower, Three-Pipe Signal Tower, Steel Structure Workshop, Custom Processing and Welding of Metal Products, Custom Processing and Welding of Steel Products, Production and R&D of Steel Products
Production Lines1
Production MachinesLaser cutting machine, Cutting machine, Grinding machine, Fiber optic cutting machine, Bending machine, Drilling machine, Pressing machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2015-09-15
Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO45001:2018, ISO14001, ISO9001:2015

Product Q&A

Q:What is your Minimum Order Quantity (MOQ)?
A:
Standard items like poles have an MOQ of 1 for trial orders. Customized towers vary by design complexity; we discuss small batches with new partners.
Q:Can you provide OEM/ODM services?
A:
Yes, our team customizes solutions per drawings, wind load, and soil conditions, including painting, logos, and designs.
Q:How do you guarantee the quality of your towers?
A:
We use a 3-Stage Quality Control process: Raw Material Inspection, In-Process Inspection, and 100% Final Inspection on dimensions and galvanization thickness.
Q:What is your production lead time?
A:
Typically 15-25 working days post-deposit and drawing confirmation. Contact us for urgent orders.
Q:What are your payment terms?
A:
Standard terms are 30% T/T deposit and 70% before shipment. For large projects, flexible terms like L/C are available.

Send Inquiry

*To:Qingdao Xinyuanzhou Electric Power Equipment Co., LtdQingdao Xinyuanzhou Electric Power Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Self Supporting Angle Steel Telecom Signal Tower
Made-in-China.com