Powered by Made-in-China.com

Carbon Steel Seamless Pipes for Sch80
US$640.00
10 Tons
Product profile
Customization
AvailableType
SeamlessTechnique
Hot RolledMaterial
Carbon SteelSurface Treatment
BlackUsage
Hydraulic/Automobile Pipe, Machinery Industry, Construction & DecorationSection Shape
RoundTransport Package
in BundlesSpecification
ASTM, GB, DINTrademark
XinglongOrigin
ChinaHS Code
73040000Production Capacity
40, 000 Tons/YearKey features
Large Production Capacity: Annual output reaches 60,000 tons with 850 staff and 15,000 sqm facility.
Professional Quality Control: Equipped with sophisticated testing equipment and BV/SGS authentication.
Custom Manufacturing Support: ODM and OEM services available with dedicated R&D team and patents.
Versatile Application Range: Suitable for hydraulic, automobile, machinery, and construction decoration.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2004-11-18 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤18h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3 Taishan Road, Economic Development Zone, Liaocheng, Shandong, China
Plant Area6000 square meters
Number of Employees27
Registered Capital3,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Our Production Capability & Technical Expertise
Main ProductsSeamless steel tube
Production MachinesCalcination furnace, Sizing machine, Straightening machine, Sawing machine
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2010-09-13
Main MarketsSoutheast Asia/ Mideast, Domestic
Number of Foreign Trading Staff10
Overseas Agent/BranchNo
Product Q&A
Q:Are you a factory or a trading company?
A:
We not only have our own factory but also have own trading company.
Q:Can you provide samples?
A:
Yes, if the sample is available in stock.
Q:Can you arrange the shipment?
A:
Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q:What is the delivery time?
A:
It is based on the order, normally 15 - 20 days after receiving the deposit or L/C at sight.
Q:Do you have quality control?
A:
Yes, we have gained BV, SGS authentication.
Send Inquiry
*To:
Shandong Liaocheng Yuanhetai Steel Products Co., Ltd.
Shandong Liaocheng Yuanhetai Steel Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
API 5L ASTM A53 A106 Gr. B Sch40 Sch80 Sch160 Tpco Carbon Seamless Steel Pipe
US$390.00-590.00
1 Ton(MOQ)
ASTM A106 Seamless Carbon Steel Pipe with Red Anti-Corrosion Coating for Pipeline Projects
US$650.00-850.00
1 Ton(MOQ)
Premium Carbon Steel Seamless Pipe S275 S355 for Global Supply
US$515.00-580.00
1 Ton(MOQ)
ASTM A106 API 5L Seamless Carbon Steel Pipe 1/4" - 24" Carbon/Stainless/Alloy for Fluid
US$450.00-500.00
1 Ton(MOQ)
Grade B, St52, St35, St42 X42, X56, X60, X65, X70 Psl1 Seamless Carbon Steel Pipe for Oil Gas Transmission
US$468.00-486.00
5 Tons(MOQ)
Industrial Seamless Galvanized Steel Pipe for High Pressure Fire Fighting Main
US$520.00-600.00
1 Ton(MOQ)
Factory Supply Hot Rolled St37 St52 A106 A53 API5l Sch40 Sch80 Seamless Carbon Steel Pipe
US$500.00-550.00
1 Ton(MOQ)
Micropile Tube/Carbon Alloy Steel Pipe for Civil and Geotechnical Engineering
US$950.00-1,350.00
100 Tons(MOQ)
ASTM A106 A53 St37 St52 Sch80 Factory Tpco Cold Drawn Carbon Seamless Steel Pipe
US$439.00-489.00
1 Ton(MOQ)
High Quality 1020 1035 1045 4130 4140 S235 S345 S275 S355 Seamless Steel Pipe for Oil and Gas
US$500.00-550.00
1 Ton(MOQ)
Industrial-Grade LSAW Seamless Welded Carbon Steel Pipe for Construction Engineering Projects
US$550.00-580.00
1,000 Pieces(MOQ)



















