Powered by Made-in-China.com
Long Working Time Impact Resistant Handheld Metal Detector V160
US$70.00
1-49 Pieces
US$65.00
50-199 Pieces
US$60.00
200+ Pieces
Sample price:US$70.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
1 Year WarrantyWarranty
1 Year WarrantyModel NO.
V160Certification
CE, ISO, RoHS; FCCCustomized
OEM / ODMApplication
Examination Room, Public Area, Factory, Metro StationAlarm Form
Sound and Light AlarmName
Hand Held Metal DetectorModel
V160Weight
200gOperating Current
<50mAOperation Frequency
40kHzMaterial
Shock, Impact Resistant ABS PlasticSize
350X80X60(mm)Transport Package
CartonsTrademark
PEACENTURYOrigin
China (Mainland)HS Code
8543709100Production Capacity
5000PCS/MonthKey features
Ultra-Long Battery Life: Standby time up to 100 hours; dedicated lithium battery lasts up to 500 hours.
High Sensitivity Detection: Detects extremely small non-magnetic metal objects with 4 adjustable sensitivity levels.
Multi-Mode Alarm System: Simultaneous sound, light, and vibration alarms for various environments.
Impact Resistant Design: Constructed with shock and impact resistant ABS plastic for durability.
Lightweight Portability: Weighs only 200g for easy handheld operation.
Comprehensive Certifications: Certified with CE, ISO, RoHS, and FCC standards.
Wide Application Range: Suitable for airports, schools, hospitals, prisons, and factories.
1-Year Warranty Coverage: Includes 1-year warranty for after-sales service support.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤1.63h
About Our Factory & Business Background
AddressBuilding 1, Huizhi Park No.164, Pingxin North Road Pinghu Street Longgang District, Shenzhen, Guangdong, China
Our Production Capability & Technical Expertise
Main ProductsWalk Through Metal Detector, X-ray Baggage Scanner, Hand Held Metal Detector, Under Vehicle Inspection System(Uvss), Hydraulic Rising Bollard, Hydraulic Road Blocker, Tire Killer, Gold Detector, Barrier Gate
Product Q&A
Q:What is the battery life of the V160?
A:
It offers ultra-long standby time of about 100 hours, with a dedicated lithium battery lasting up to 500 hours.
Q:Can the sensitivity be adjusted?
A:
Yes, it features 4 levels of sensitivity: low, normal, high, and ultra-high.
Q:What materials is the detector made of?
A:
It is made of shock and impact resistant ABS plastic.
Q:Does it support OEM or ODM customization?
A:
Yes, OEM and ODM customization services are available.
Q:What certifications does the product have?
A:
The product holds CE, ISO, RoHS, and FCC certifications.
Send Inquiry
*To:
Shenzhen Heping Century Technology Co., Ltd.
Shenzhen Heping Century Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Super High Sensitivity Handheld Metal Detector Detector V160
US$60.00-70.00
1 Piece(MOQ)
High Sensitivity Adjustable Hand Held Metal Detector V160 for Public
US$60.00-70.00
1 Piece(MOQ)
Good Price Portable Long Range Hand Held Body Scanner Metal Detector for Security Check MD300
US$6.30-6.70
1 Piece(MOQ)
Gold Hunter T90 Hand Held Metal Detector Pinpointer Long Range Underground Gold Metal Detector
US$229.00-269.00
1 Piece(MOQ)
Gold Hunter at PRO Waterproof Pinpointer Long Range Underground Gold Metal Detector Handheld Metal Detector
US$28.00-32.00
25 Pieces(MOQ)
Long Range Underground Gold Metal Detector Hand Held Diamond Detector
US$28.00-32.00
25 Pieces(MOQ)
Hot Sales Super Scanner Hand Held Metal Detector MD3003B1
US$200.00-500.00
1 Piece(MOQ)
Handheld Portable Security Scanner Metal Detector to Detect Gun, Weapons, knives
Negotiable
1 Piece(MOQ)
Ultra High Sensitivity Hand Held Metal Detector V160
US$78.00-95.00
200 Pieces(MOQ)
Security check Hand Held Metal Detector SPM-2008 for Schools
US$13.50-14.00
500 Pieces(MOQ)
Super Wand Portable Hand Held Metal Detector for Security Scanning
US$80.00-100.00
1 Piece(MOQ)
Security Wand Handy Scanner Full Body Hand Held Security Metal Detector
US$5.50-6.00
300 Pieces(MOQ)
Primary Search Handheld Metal Detector Wand
US$9.90-15.00
1 Piece(MOQ)
Long Range Metal Detector Epx-10000 Underground Gold Treasure Hunter 50m
US$1,750.00-1,850.00
1 Set(MOQ)
Portable Hand Held Metal Detectors for Full Body Scanning Zk-D300
US$137.00-140.00
1 Piece(MOQ)


















