SourcingAI
Try for free
Powered by Made-in-China.com
132kv 3000kVA (3MVA) Three Phase Oil Immersed Power Transformer
US$3,000.00-1,000,000.00
1 Piece

Product profile

Customization

Available

Application

Power, Electronic, Instrument, Lighting, Rectifier, Audio

Phase

Three

Model NO.

SFSZ11

Core

Core-type Transformer

Cooling Method

Oil-immersed Type Transformer

Winding Type

Two-winding Transformer

Certification

ISO9001-2000, ISO9001, CCC

Usage

Combined Transformer, Power Transformer, Distribution Transformer

Frequency Characteristics

Power Frequency

Shape of Core

EI

Brand

Xusheng Electric

Altitude

≤1000 M

H.V. Winding

132kv

Rated Frequencyedance

50Hz 60Hz

Vector Group

Dyn11 Yyn0

Transport Package

Wooden Case Packing

Specification

630mm*1200mm*1800mm

Trademark

Xusheng

Origin

China

HS Code

8504901900

Key features

Pure copper winding optional,excellent conductivity and strong short-circuit resistance.Aluminum winding available,cost-effective solution with stable operation performance
High-grade grain-oriented silicon steel core, low no-load loss & energy-saving
Fully-sealed corrugated tank structure, low maintenance cost
Low noise design, stable running for outdoor power distribution scenarios
Strictly comply with IEC & GB international standards, reliable performance
Complete built-in safety protection devices for safe operation
30-year professional transformer manufacturer, rich production experience
Flexible customization for voltage, connection group & special requirements
Strict full-range testing before delivery, every unit inspected
Factory direct supply, competitive price & stable delivery capacity

Company profile

Business Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableAverage Response Time: ≤2.39hInternational Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CPT, Others, FCA

About Our Factory & Business Background

AddressXingguang International Financial Center, Dongchang East Road, Dongcheng Street, Liaocheng Economic and Technological Development Zone, Shandong Province
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsOil Immersed Transformers, Dry Type Transformers, Special Transformers, on Grid Solar Inverters, off Grid Solar Inverters, Hybrid Solar Inverters, Home Energy Storage Batteries, C&I Energy Storage Batteries, LiFePO4 Battery Packs, Energy Storage Equipment

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the standard connection group & cooling method?
A:
Standard connection group Dyn11, cooling method ONAN. Customization is acceptable.
Q:Which international standards does your transformer comply with?
A:
Strictly comply with IEC 60076 and Chinese GB standards. Test report can be provided.
Q:What is your lead-time for 10kV 1000kVA oil immersed transformer?
A:
Standard model lead-time 15-25 working days after receiving deposit.
Q:What is your warranty period?
A:
24-month warranty after shipment. Lifelong technical support is available.
Q:What is your MOQ? Can I order one unit?
A:
MOQ is 1 unit. Sample order is acceptable.

Send Inquiry

*To:Shandong Xusheng Electric Co., Ltd.Shandong Xusheng Electric Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

1000kVA 11kv Three Phase Oil Immersed Transformer Factory
Made-in-China.com
5000kVA 132/33kv Wind Power Step up Oil Immersed Transformer
Made-in-China.com