SourcingAI
Try for free
Powered by Made-in-China.com
GB/T & CE Certified Prefabricated Steel Structure Warehouse Workshop Industrial Building
US$800.00
1 Piece

Product profile

Customization

Available

After-sales Service

1 Year

Layers

Single-Layer

Model NO.

PFFT-PF

Usage

Specialized Workshop, Warehouse

Structure

Steel Portal Frame

Anti Corrosion

Paint/ Galvanized

Standard

GB/T; CE CE Certified

Application

Storage, Factory Workshop

Transport Package

Naked Packing with Steel Frame Bundle

Specification

By CBM

Trademark

XINGYA

Origin

China

Key features

Complies with GB/T & CE standards, stable portal frame structure, strong load-bearing capacity.
Prefabricated components, short construction period, effectively save labor and time cost.
Customizable size, thermal insulation & waterproof options, suitable for warehouse and factory workshop.

Company profile

Jinan Xingya Metal Material Co., Ltd.
Experienced TeamFast DeliveryQuality AssuranceR&D Capabilities
Business Type: Trading Company CertifiedCustomization Options: Customization from Samples, Minor Customization CertifiedNearest Port: Qingdao PortAverage Response Time: ≤5.07h CertifiedTerms of Payment: T/T CertifiedInternational Commercial Terms(Incoterms): FOB, CIF, EXW

AI-Powered supplier vetting

SummaryThe supplier is identified as a trading company with business activities covering metal materials, high-performance non-ferrous metals and alloys, steel processing, construction manufacturing, supply-chain services, and import/export. It reports substantial steel-structure-related equipment, including robotic welding, hydraulic press brakes, band saws, drilling machines, shot blasting, and ultrasonic flaw detection. However, service governance is weak: there are no written procedures or records for supplier-service assessment, corrective/preventive actions, or complaint handling. The supplier has no stated inventory, overseas warehouse, overseas showroom, overseas agents or branches, or offline trade-show participation. Quality assurance and raw-material traceability are reported, but supporting controls are partly informal. Financial data provided shows zero values across the stated revenue, profit, cash-flow, and liquidity indicators, so financial credibility cannot be favorably established. No explicit...
After-Sales capabilityThe supplier reports one-month average lead times in both peak and off-season and accepts FOB, CIF, and EXW service quotations. However, it has no inventory, overseas warehouse, overseas showroom, overseas agents or branches, and no written procedures or records for complaint handling, service-capability assessment, or corrective/preventive actions.
Financial creditThe submitted financial information shows zero operating revenue, costs, profits, cash receipts, cash inflows, cash outflows, and current ratio for the stated periods. These figures provide no positive evidence of financial strength and indicate a significant financial-information concern.
R&D capabilityThe business scope includes research and development of new materials, and the company description refers to innovation as a corporate philosophy. These statements support an announced R&D orientation, but no specific R&D achievements, patents, or developed products are provided.
Production capacityThe supplier’s stated activities include steel rolling processing and construction manufacturing, while its equipment description lists 5-meter band saws, hydraulic press brakes, CNC drilling machines, a large shot-blasting unit, 20 welding robots, and ultrasonic flaw detectors. This is explicit evidence of substantial metal and steel-structure processing resources, although the supplier is classified as a trading company.

Product Q&A

Q:Can you customize the size of steel structure warehouse?
A:
Yes. We support full customization on span, length, height and load requirements. We can design according to your local wind load, snow load and GB/T & CE standards.
Q:What is the warranty period of your steel building?
A:
We provide 1-year warranty for main steel frame. The service life of the whole portal frame steel structure can reach more than 30 years under proper maintenance.
Q:What anti-corrosion treatment options are available?
A:
Two common solutions: paint coating or hot-dip galvanizing. We can select suitable anti-corrosion process according to your local climate.

Send Inquiry

*To:Jinan Xingya Metal Material Co., Ltd.Jinan Xingya Metal Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like