Powered by Made-in-China.com
Fast Delivery Steel Structure Workshop & Warehouse Building Solution One-Stop Service From Design to Installation, Solving Uncontrolled Overseas Project Delay
US$31.00-50.00
200 Square Meters
Product profile
Customization
AvailableAfter-sales Service
Online Installation Guidance & Lifetime TechnicalLayers
Single-LayerModel NO.
SSWK-055Usage
Dust-Proof Workshop, Electrostatic Workshop, Food And Chemical Industry, Heavy Industry, Specialized Workshop, Textile And Electronic Processing, WarehouseProduct Type
Steel Structure WorkshopSize
Fully Customizable DesignMain Frame Material
Q235B/Q355b H/I Steel BeamsSurface Treatment
Hot-DIP Galvanized / PaintedService Life
50+ YearsFabrication
Factory PrefabricatedApplication
Warehouse/Workshop/StorageDrawing Support
CAD/3D/TeklaDoor & Window
Sliding/Sectional Door, Aluminum Alloy WindowEnclosure Material
Sandwich Panel / Corrugated Steel SheetWind Load Resistance
0.3-1.5 kN/M² (Customizable)Snow Load Resistance
0.3-2.0 kN/M² (Customizable)Seismic Grade
7-9 Grade (Customizable)Insulation Performance
High Thermal Efficiency, Energy SavingFire Rating
Customizable Fire Resistance GradeTransport Package
Sea-Worthy PackingSpecification
Q235B/Q355BTrademark
Anhui XuanzhiOrigin
Anhui, ChinaHS Code
7308900000Production Capacity
50, 000 Tons/YearKey features
ODM Workshop Design Service: Customized dimensions, bays and equipment layout.
Quick Assembly Construction: Prefabricated components reduce labor costs.
Designed for Manufacturing Facilities: Suitable for machinery, assembly and processing plants.
Column-Free Interior Space: Provides maximum usable workspace.
Excellent Ventilation Design: Supports natural and mechanical ventilation systems.
Premium Steel Materials: Q235B/Q355B steel with strict quality control.
Long-Term Durability: Designed service life exceeding 50 years.
One-Stop Project Service: Design, fabrication, shipping and installation support.
Low Construction Cost: More economical than traditional concrete buildings.
Professional Structural Design: Complies with local wind and seismic requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 2 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤5.79h
About Our Factory & Business Background
AddressNo. 3, Cultural and Creative Industry Park, Zhengji Town, Tianchang City, Chuzhou, Anhui, China
Plant Area13717 square meters
Number of Employees32
Registered Capital44,030,000 RMB
Terms of PaymentT/T
International Commercial Terms(Incoterms)FOB
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity10 Tons
Supply Chain Partners15
Our Production Capability & Technical Expertise
Main ProductsSteel structure factory
Production Lines4
Production MachinesCutting Machine, Bending Machine, Welding Machine, Sandblast Machine, Paint Machine
QA/QC inspectors1 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2023-12-07
Main MarketsDomestic
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:Are you a manufacturer or a trading company?
A:
We are a professional steel structure manufacturer with our own factory, production lines, and export team. From design and fabrication to quality inspection and shipment, all processes are managed in-house to ensure stable quality, competitive pricing, and reliable delivery for every warehouse project.
Q:Can the workshop be customized according to our production requirements?
A:
Yes. We provide complete OEM and ODM customization services. The workshop dimensions, column spacing, crane system, ventilation, lighting, insulation, and internal layout can all be designed according to your production process and equipment requirements.
Q:Can your steel structure workshop support overhead cranes?
A:
Yes. We can design crane beams and supporting systems for different lifting capacities, typically ranging from 3 tons to 50 tons or more, depending on your production requirements and local standards.
Q:What steel materials do you use for workshop buildings?
A:
Our workshop structures are mainly fabricated from Q235B and Q355B steel. All materials are sourced from qualified suppliers and undergo strict quality inspections to ensure structural strength, durability, and long-term safety.
Q:Is the workshop suitable for hot or cold climates?
A:
Yes. Different insulation solutions can be selected according to local weather conditions. We offer EPS, Rock Wool, Glass Wool, and PU sandwich panels to improve thermal performance and create a comfortable working environment.
Send Inquiry
*To:
Anhui Xuanzhi Steel Structure Co., Ltd
Anhui Xuanzhi Steel Structure Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Durable Steel Structure Workshop & Warehouse with CE Certificate, Reliable Large Span Metal Building
US$20.00-55.00
300 Square Meters(MOQ)
Hot DIP Galvanized Steel Structure Workshop Factory Industrial Warehouse Building Corrosion Resistant Light Steel Engineering
US$31.00-49.00
200 Square Meters(MOQ)
Modular Fast-Installation Steel Structure Workshop, General Steel Building for Hardware & Plastic Products Processing
US$45.00-63.00
100 Square Meters(MOQ)
Customized Steel Structure Modular Building with Prefab Office Workshop Warehouse
US$20.00-39.90
500 Square Meters(MOQ)
Factory Supply Modular Design Fast Installation Seismic Resistance Prefabricated Metal Frame/Steel Structure Warehouse/Workshop Building
US$25.00-40.00
500 Square Meters(MOQ)
Gable Frame Steel Structure Warehouse Workshop Storage Building Over 20 Years Professional Production
US$20.99-59.99
1 Square Meter(MOQ)
Fast Build Modular House Shed/Prefabricated/Prefab Steel Structure Workshop/Warehouse/Farm Shed/Factory/Office/Storage Building
US$20.00-50.00
500 Square Meters(MOQ)
Industrial Steel Structure Workshop Warehouse Metal Frame Building
US$20.00-55.00
500 Square Meters(MOQ)
Easy Expansion Fast Delivery Prefab Steel Structure Workshop Building
US$30.00-80.00
1 Square Meter(MOQ)
Fast-Commissioning Steel Structure Workshop, Large-Space Production Steel Building for Textile & Garment Processing
US$45.00-63.00
100 Square Meters(MOQ)
China Manufacturer Workshops Cold Drawn Building Workshop Steel Structure Warehouse Building
US$30.00-80.00
500 Square Meters(MOQ)
Fast-Track Industrial Steel Building Solutions for Quick Setup
US$18.00-30.00
1 Square Meter(MOQ)
Economical Affordable Modern Fast Build Steel Structure Plant/Workshop Steel Structure Building
US$35.00-55.00
100 Square Meters(MOQ)
Cheap Prefab Steel Structure Building Prefabricated Warehouse/Workshop/Aircraft Hangar
US$45.00-60.00
500 Square Meters(MOQ)
Quick Erect Prefabricated Light Steel Structure Warehouse Workshop Metal Building
US$18,000.00-54,000.00
1 Set(MOQ)
Fast Construction Easy Assembly Prefabricated Steel Structure Building for Warehouse Workshop
US$40.00-50.00
1,000 Square Meters(MOQ)
1 Year En 1991 Xingya Steel Structure Workshop Factory Building
US$800.00
1 Piece(MOQ)
Peb Workshop Industrial Warehouse Building with Q355b Steel Structure
US$18.90-46.00
500 Square Meters(MOQ)
1000sqm Prefabricated Ready Made Steel Structure Warehouse/Workshop Building for Food Factory
US$35.00-55.00
100 Square Meters(MOQ)
Prefabricated Structure Steel Frame Steel Structure Warehouse Prefab Steel Structure Building Workshop Buildings
US$20.00-30.00
500 Square Meters(MOQ)



















