High Water Reduction Rate: Achieves 30%-40% water reduction for improved concrete performance.
Complete QC System: Full inspection of chemical composition and physical properties during production.
OEM and ODM Services: Offers flexible customization from samples, designs, and full customization options.
Factory Direct Supply: Direct manufacturer with two factories in Jiangsu, ensuring competitive pricing.
Quality Certificate Included: All goods are tested and shipped with a quality certificate.
Flexible Payment Terms: Accepts 30% deposit with 70% balance before shipping via TT.
Fast Lead Time: Standard production lead time is 15-20 days after receiving the PO.
Free Samples Available: Free samples provided, with customers covering delivery costs.