Powered by Made-in-China.com
API Standard Bw Series Duplex and Triplex Mud Pump Oil Drilling Forging
US$3,000.00-5,000.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
ProvideWarranty
1 YearModel NO.
BWManufacturing Process
ForgingSurface Treatment
Spray-PaintOperation Pressure
StandardMaterial
AlloyCore Components
MotorVoltage
220V/380V/460V/CustomizedTreatment Capacity
Treatment CapacityDimension
1560*995*650mmInlet Pipe Dia
76,mmOutlet Pipe Dia
51mmPiston Stroke
100mmPower
15kwTransport Package
Plywood CasesSpecification
1835*1230*1810mmTrademark
YCPTOrigin
ChinaProduction Capacity
500000Key features
API Standard Certification: Manufactured strictly according to API and ISO 9001 international standards.
Versatile Power Options: Can be driven by electric motor, diesel engine, or hydraulic motor.
Customizable Voltage: Voltage supports 220V, 380V, 460V, or customized options.
High-Quality Forging: Core components forged from alloy material for durability.
Flexible Customization: Supports customization from samples, designs, and minor adjustments.
1-Year Warranty: Comprehensive 1-year warranty coverage for peace of mind.
Professional Support: After-sales service includes quality compensation and logistics tracking.
Fast Quotation: Price quotes provided within 24 hours of inquiry receipt.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.92h
About Our Factory & Business Background
AddressRoom No. 808 of No. 1 Building, No. 1188 Lushan Road, Dongying District, Dongying, Shandong, China
Plant Area300 square meters
Number of Employees33
Registered Capital20,000,000 RMB
Terms of PaymentLC, D/P, PayPal, T/T, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsHandling Tools, Solid Control Equipment, Cementing Tools, Drilling Tools, Downhole Tools, API 6A Valve
R&D Engineers7 people
Our Industry Experience & Global Business Record
Year of Establishment2016-01-21
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff22
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the MOQ?
A:
The MOQ depends on specific requirements and can be negotiated. Larger quantities offer more competitive unit prices.
Q:Who pays the delivery fee?
A:
Customers must pay the delivery fee. You can provide your express account or pay according to the express company's rates. If no preference is stated, we will choose a cost-effective option.
Q:What is the after-sales service policy?
A:
We maintain quality consistency with buyer samples and provide compensation for quality issues. We also handle packing, track goods from production to sale, and resolve any selling problems.
Q:How long does it take to get a price quote?
A:
We usually provide a quote within 24 hours after receiving your inquiry.
Q:What payment methods are accepted?
A:
We accept T/T, Credit Card, PayPal, Western Union, and Cash.
Send Inquiry
*To:
Shandong Yacheng Petroleum Technology Co., Ltd.
Shandong Yacheng Petroleum Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Oil and Gas Drilling Use Mud Pump F-1600/F-1300/F-1000/F-800
US$90,000.00-110,000.00
1 set(MOQ)
F1600/F1300/F800/F1000 Triplex Mud Pump/Drill Fluid Pump for Oil/Gas Drilling Rigs and Workovers
US$90,000.00-110,000.00
1 set(MOQ)
API Standard F/Pz/P/Nb Series Drill Mud Pump Valve and Seat for Drilling Rig
US$20.00-70.00
1 Piece(MOQ)
Oilfield Garnder Denver Pz Series Triplex Drilling Mud Pump Pz7 Pz8 Pz9 Pz10
US$10,000.00-50,000.00
1 Piece(MOQ)
API Oilfield Mud Pump F1600 F1300 F1000 F800 for Oil Drilling Rig
US$13,000.00-20,000.00
1 Piece(MOQ)
API 7K Oil Drilling Mud Pump Valve and Valve Seat/Valve Assembly for Mud Pump
US$20.00-70.00
1 Piece(MOQ)
High Pressure Oil Drilling Triplex Mud Pump F-500 F800 F1000 F1300 F1600 with Standard Replaceable Components
US$90,000.00-110,000.00
1 set(MOQ)
F Series Mud Pump Bomco F1000 Triplex Mud Pump for Drilling Rig
US$55,000.00-69,000.00
1 Piece(MOQ)
F Series Triplex Mud Pump API Mud Pump for Drilling Rig
US$60,000.00-70,000.00
1 Piece(MOQ)
High-Performance Triplex Mud Pump for Oil Drilling Rigs
US$40,000.00-110,000.00
1 set(MOQ)
Mud Pump F Series for Well Drilling and Workover Operation 500HP -1600HP
US$12,000.00-13,000.00
1 Piece(MOQ)
API Standard Sucker Rod Pumps and Oil/Gas Pumps for Oilfield Drilling
US$500.00-980.00
1 Piece(MOQ)
Pulsation Damper and Air Bag Mud Pump Parts F Series for Oil Well Drilling
US$890.00-990.00
1 Piece(MOQ)
F1600/F1300/F800/F1000 Triplex Mud Pump/Drill Fluid Pump for Oil/Gas Drilling Rigs
US$1,200.00-14,000.00
100 Pieces(MOQ)
API Triplex Mud Pump Drilling Mud Pump
US$13,000.00-15,000.00
1 sets(MOQ)
Factory Price Triplex Mud Pump F-Series Oil Drilling Rig Pump
US$1,200.00-14,000.00
100 Pieces(MOQ)
Triplex Plunger Pump and Mud Pumps for Drilling Rigs
US$1,200.00-14,000.00
100 Pieces(MOQ)
F-1000 Triplex Drilling Mud Pump Reciprocating Pump Hydraulic Drilling Pump
US$10,000.00-55,000.00
1 Piece(MOQ)
Premium 2s Series Oil Pump for Petroleum Equipment Standards Mud Pumps
US$65.00-103.00
1 Set(MOQ)



















