Powered by Made-in-China.com
F800/1000 Drilling Mud Pump Parts Piston Assy and Piston Rod
US$10.00-50.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
SupportWarranty
SupportModel NO.
YCPTManufacturing Process
ForgingSurface Treatment
PolishingOperation Pressure
Atmospheric PressureMaterial
AlloyType
Piston RodColor
Black/Red/CustomizeDelivery Date
7-30 DaysShipping Method
Express, Air, SeaTransport Package
ContainerSpecification
StandradOrigin
ChinaHS Code
84314310Production Capacity
5000 Sets Per MonthKey features
Customizable Color Options: Available in Black, Red, or fully customized colors based on requirements.
Wide Compatibility Range: Fits Emsco, Gardener Denver, National, Ideco, Oilwell, and other major pump brands.
Durable Alloy Construction: Manufactured using high-quality alloy material with forging process and polishing finish.
Comprehensive After-Sales Support: Includes warranty support and responsive engineering assistance for all units.
Flexible Delivery Schedule: Delivery time ranges from 7 to 30 days depending on order specifics.
100% Pre-Delivery Inspection: Every piston assembly undergoes rigorous testing before shipment to ensure quality.
One-Year Warranty Coverage: Provides a full one-year guarantee period starting from the date of delivery.
Multiple Shipping Methods: Options include Express, Air, and Sea freight from ports like Qingdao and Tianjin.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.63h
About Our Factory & Business Background
AddressRoom No. 808 of No. 1 Building, No. 1188 Lushan Road, Dongying District, Dongying, Shandong, China
Plant Area300 square meters
Number of Employees33
Registered Capital20,000,000 RMB
Terms of PaymentLC, D/P, PayPal, T/T, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsHandling Tools, Solid Control Equipment, Cementing Tools, Drilling Tools, Downhole Tools, API 6A Valve
R&D Engineers7 people
Our Industry Experience & Global Business Record
Year of Establishment2016-01-21
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff22
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period?
A:
One year since delivery.
Q:What are the payment terms?
A:
We accept T/T and L/C.
Q:How long is the delivery time?
A:
About 30 days after receiving the advance payment, or according to both parties agreement.
Q:Which ports are available for shipment?
A:
Tianjin, Qingdao, Shanghai, or other required ports.
Q:What is the inspection process?
A:
100% testing before delivery.
Send Inquiry
*To:
Shandong Yacheng Petroleum Technology Co., Ltd.
Shandong Yacheng Petroleum Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Rosenwell High Quality Mud Pump Spares Piston Rod for F800/1000 F1300/1600
US$25.00
1 Piece(MOQ)
Fine Machined Mud Pump Piston Rod for Precision Drilling Equipment Fit
US$159.00-199.00
10 Pieces(MOQ)
Premium Forged Mud Pump Piston Rod for Oilfield Drilling Rig Stability
US$159.00-199.00
10 Pieces(MOQ)
High Strength Mud Pump Piston Rod for Oilfield Drilling Equipment
US$159.00-199.00
10 Pieces(MOQ)
Chrome Plated Steel Rod Bar Piston Rod for Mud Pump
US$600.00-980.00
1 Piece(MOQ)
Shock Resistant Mud Pump Piston Rod Protects Oilfield Drilling Equipment
US$159.00-199.00
10 Pieces(MOQ)
API Certified Drilling Mud Pump Hydraulic Cylinder Assembly Parts Piston Rod/ Extension Rod/ Pony Rod
US$85.00-183.00
5 Pieces(MOQ)
Mud Pump Piston Rod 42CrMo or Bomco F500 F800 F1000 F1300 F1600
US$50.00
1 Piece(MOQ)
API Standard Mud Pump Parts Piston Rod for F800
US$80.00-88.00
2 Pieces(MOQ)
Standard F800 F1600 F1000 F500 Drill Mud Pump Parts Piston Rod
US$278.00-280.00
5 Pieces(MOQ)
OEM Spare Parts Mud Pump Parts Piston Rod Pony Rod
US$5.00-20.00
5 Pieces(MOQ)
OEM Bomco F800/F1000/F1300/1600 Mud Pump Spare Parts Piston Rods for Oilfield Piston Liner#Gh3161-05.18
US$200.00-300.00
2 Pieces(MOQ)
Pump Parts/Mud Pump Parts/Piston Rod
US$10.00-50.00
5 Pieces(MOQ)
Durable Mud Pump Piston Rod for Universal Installation and Performance
US$10.00-90.00
1 Piece(MOQ)
Oilfield Drilling Mud Pump Spare Parts Extension Rod
US$15.00
1 Piece(MOQ)
Bomco API F800 F1600 F1000 F500 Drill Mud Pump Piston Rod
US$110.00-160.00
1 Piece(MOQ)
Oilfield Drilling Triplex Mud Pump Connecting Power End Piston Rod
US$86.00-189.00
5 Pieces(MOQ)
Bomco F500-F1600 Mud Pump Spare Parts Piston Rod
US$5.00-20.00
5 Pieces(MOQ)



















