Powered by Made-in-China.com
Mud Pump Fluid End Crosshead Assembly Parts
US$900.00-1,900.00
1 Piece
Product profile
Customization
AvailableAfter-sales Service
SupportWarranty
SupportModel NO.
Fluid End Crosshead AssemblyCertification
CE, RoHS, ISO 9001:2000, ISO 9001:2008Power Source
HydraulicOperation Pressure
Atmospheric PressureApplicable Medium
MudStructure
HorizontalMaterial
Cast SteelType
Mud Pump AccessoriesTransportation
Express, Sea, AirDelivery Date
7-30 DaysShipping Time
10daysTransport Package
Wooden BoxTrademark
YCPTOrigin
ChinaHS Code
84314310Production Capacity
500 Sets Per MonthKey features
High-Quality Materials: Crossheads made of cast steel and guides of manganese bronze for low friction and minimal wear.
Wide Compatibility: Compatible with Emsco, Gardener, National, Ideco, Oilwell, and Russian pump models.
Comprehensive Certifications: Certified with CE, RoHS, ISO 9001:2000, and ISO 9001:2008 standards.
One-Year Warranty: Provides a one-year guarantee period starting from the delivery date.
100% Quality Inspection: Every unit undergoes 100% testing before delivery to ensure reliability.
Flexible Customization: Offers full customization, minor customization, and customization from samples or designs.
Fast Delivery Options: Delivery time ranges from 7 to 30 days depending on order specifics.
Multiple Payment Methods: Accepts T/T, L/C, D/P, PayPal, and Western Union for flexible transactions.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.59h
About Our Factory & Business Background
AddressRoom No. 808 of No. 1 Building, No. 1188 Lushan Road, Dongying District, Dongying, Shandong, China
Plant Area300 square meters
Number of Employees33
Registered Capital20,000,000 RMB
Terms of PaymentLC, D/P, PayPal, T/T, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners30
Our Production Capability & Technical Expertise
Main ProductsHandling Tools, Solid Control Equipment, Cementing Tools, Drilling Tools, Downhole Tools, API 6A Valve
R&D Engineers7 people
Our Industry Experience & Global Business Record
Year of Establishment2016-01-21
Main MarketsNorth America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea)
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff22
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the warranty period?
A:
One year since delivery.
Q:What is the inspection process?
A:
100% testing before delivery.
Q:What are the terms of payment?
A:
We accept T/T, L/C, D/P, PayPal, and Western Union.
Q:What is the delivery time?
A:
About 30 days after receiving the advance payment, or according to both parties agreement.
Q:What are the ports of shipment?
A:
Tianjin, Qingdao, Shanghai, or other required ports, by sea or air.
Send Inquiry
*To:
Shandong Yacheng Petroleum Technology Co., Ltd.
Shandong Yacheng Petroleum Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Ht400 Plunger Pump Fluid End Spare Parts
US$5.00-100.00
1 Piece(MOQ)
Replacement Valve Assembly Parts for Efficient Mud Pump Pressure Gauge
US$20.00-150.00
1 Set(MOQ)
Wear-Resistant Mud Pump Spare Parts for Long-Lasting Oil Drilling
US$20.00-120.00
1 Set(MOQ)
NOV Ibop Spare Part 110103-500/114706-500 for Top Drive Drilling Assembly
US$5,000.00-8,000.00
1 Piece(MOQ)
Ht400/Tws600 Plunger Pump Fluid End Assy&Spare Parts Oilfield
US$11,000.00
1 Piece(MOQ)
Spar Parts for Ht 400 Pumps Interchangeable Valves Seats Rods Pistons Fluid Module Fracturing and Cement
US$5.00-100.00
1 Piece(MOQ)
Durable Mud Pump Valve Cover Parts for Optimal Functionality
US$20.00-150.00
1 Set(MOQ)
High-Quality Mud Pump Valve Cover Parts From Trusted Factory
US$20.00-150.00
1 Set(MOQ)
Spare Parts of Nov Mission and Xbsy Drilling Mud Centrifugal Pump
US$500.00
1 Piece(MOQ)
High Quality Spare Parts of Mud Pump
US$60.00
100 Pieces(MOQ)
Light Weight Plastic Parts Charge Rail Bearing Bulkhead Auto Electronic Assembly Pieces
US$1.00-25.00
500 Pieces(MOQ)
7K Drilling Rig Mud Pump Pulsation Dampener Spare Parts
US$4,450.00-4,600.00
1 Piece(MOQ)
OEM Service Plastic Parts Charge Rail Bearing Bulkhead Vehicle Internal Assembly Goods
US$1.00-25.00
500 Pieces(MOQ)
Spare Parts for Plunger Pump Ktz400 Factory Price
US$1.50-25,700.00
1 Piece(MOQ)
OEM TDS Series Top Drive Spare Parts for Multiple Oilfield Drilling Rigs
US$0.99-899.00
1 Piece(MOQ)
Durable Plastic Parts Charge Rail Bearing Bulkhead Industrial Assembly Spare Goods
US$1.00-25.00
500 Pieces(MOQ)
Tws600 Triplex Plunger Pump Replacement Parts for Optimal Performance
US$2.00-300.00
1 Piece(MOQ)
Eco Friendly Plastic Parts Charge Rail Bearing Bulkhead Equipment Fixed Assembly Parts
US$1.00-25.00
500 Pieces(MOQ)



















