Powered by Made-in-China.com
En 10210 S355j2h Hot Finished Seamless Carbon Steel Pipe for Structural Engineering
US$550.00
2-19 Tons
US$520.00
20-49 Tons
US$475.00
50+ Tons
Product profile
Customization
AvailableType
WeldedTechnique
Cold RolledMaterial
Carbon SteelSurface Treatment
BlackUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special PurposeSection Shape
RoundGrade
Q235B, Q355b, A500, S235jrSection Size
CustomizedWall Thickness
1.0mm-20.0mmLength
6m,9m,12m, CustomizedMOQ
2 TDelivery Time
7-15 Working DaysProcessing Service
Cutting, Punching, Welding, BendingPrice Terms
Fob , CIF, EXWTransport Package
Standard Seaworthy PackingOrigin
Chongqing ChinaHS Code
7306309000Production Capacity
50000Key features
Customized Section Sizes: Available in various square, rectangular, and round dimensions with customizable lengths.
Multiple Material Grades: Offers Q235B, Q355b, A500, S235jr, and ASTM/ASME compliant grades for diverse needs.
Comprehensive Processing Services: Includes cutting, punching, welding, and bending to meet specific engineering requirements.
Flexible MOQ Options: Supports flexible minimum order quantities with large running inventory for fast delivery.
Third-Party Inspection Support: Accepts SGS, BV, TUV, and ISO inspections with full Mill Test Certificates (MTC).
Versatile Surface Treatments: Options include black painting, varnishing, anti-corrosion oiling, 3PE coating, and galvanizing.
Fast Delivery for Stock Items: Standard delivery within 7 to 15 working days for items available in running stock.
OEM Customization Services: Provides flexible customization from designs with strong raw material channels.
Company profile
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Designs, Flexible customization CertifiedExport Year: 4 Years CertifiedNearest Port: Tianjin PortAverage Response Time: ≤1.48h
About Our Factory & Business Background
Address5-1, Building 1, No. 101 Cuibai Road, Chunhui Road Street, Chongqing, China
Registered Capital11,880,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity100 Kgs
Supply Chain Partners55
Our Production Capability & Technical Expertise
Main ProductsStainless Steel, Galvanized Steel, Carbon Steel
R&D Engineers1 people
Our Industry Experience & Global Business Record
Year of Establishment2022-01-10
Main MarketsNorth America, South America, Europe
Repeat Buyers Choice50%~80%
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:How can I get a precise quotation?
A:
Please provide your detailed requirements, including steel grade, pipe dimensions (outer diameter, wall thickness, length), and order quantity. Our team will send you the best competitive quote immediately.
Q:What are your core advantages as a steel supplier?
A:
We offer OEM customized processing with a large running inventory to guarantee flexible MOQs. With strong raw material channels, 24-hour fast response, and full Mill Test Certification (MTC), we ensure maximum cost-efficiency and quality.
Q:What is your standard delivery lead time?
A:
For running stock items, delivery is within 7 to 15 days. For customized fabrication or special production runs, the standard lead time is approximately 25 days.
Q:How do you guarantee the quality and safety of my cargo?
A:
We welcome factory audits to inspect our production and testing lines. We can provide free samples for evaluation and fully support international third-party inspections (such as SGS or BV) before shipment.
Q:How are the carbon steel pipes packaged for shipment?
A:
Pipes are packaged in secure hexagonal bundles with rust-resistant oiling, anti-crush plastic end caps, and heavy-duty metal strapping. For bulk or container shipping, they are reinforced with professional wood blocks and steel lashing to prevent movement during transit.
Send Inquiry
*To:
Chongqing Yaoda Hongcheng Metal Products Co., Ltd.
Chongqing Yaoda Hongcheng Metal Products Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Grade B, St52, St35, St42 X42, X56, X60, X65, X70 Psl1 Seamless Carbon Steel Pipe for Oil Gas Transmission
US$468.00-486.00
5 Tons(MOQ)
Carbon Steel Tubing - DIN2391 Seamless Dom Steel Pipe for Mechanics
US$590.00-760.00
1 Ton(MOQ)
Versatile Carbon Steel Seamless Pipe with Od 3/4 Inch Sch 80 for ASTM A106 Gr. B in Chemical Plants
US$470.00-530.00
5 Tons(MOQ)
High Quality Carbon Seamless Steel Pipe for Gas & Liquid Transportation
US$500.00-650.00
1 Ton(MOQ)
Hot Rolled Seamless Carbon Steel Pipe with Beveled Ends for Oil and Gas Pipelines
US$700.00-900.00
1 Ton(MOQ)
ASTM A106 Gr. B Seamless Carbon Steel Pipe for Boiler and High-Pressure Steam Lines in China
US$1,800.00-3,000.00
1 Ton(MOQ)
Carbon Steel Pipe Seamless Steel Pipe for Structural Purposes
US$580.00-660.00
25 Tons(MOQ)
Low-Temperature Resistant Seamless 1/2"-18" GB/ASTM/En Carbon Steel Pipe for Cryogenic Storage Tank Piping
US$500.00-540.00
5 Tons(MOQ)
ASTM A106 Hot Rolled Carbon Steel Seamless Pipe for Oil Pipeline
US$600.00
1 Ton(MOQ)
Polished Seamless Stainless Steel Pipe for Industrial/General with ASTM/En Standards
US$2.15-3.88
50 kg(MOQ)
Seamless Carbon Steel Pipe - Hot Rolled for General Pipeline Transport 12m Length
US$700.00-900.00
1 Ton(MOQ)
ASTM 1045 GB 45# JIS S45c S48c DIN C45 C45e Ck45 Seamless Carbon Steel Structural Pipe
US$589.00-669.00
10 Tons(MOQ)



















