Powered by Made-in-China.com
Advanced Dual-Clamping Vibro Hammer for Efficient Pile Driving
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Dual Clamping System: Side and bottom clamps secure piles, eliminating extra handling and ensuring stability.
360-Degree Rotation: Full rotation capability allows precise pile positioning for enhanced efficiency.
Low Clearance Capability: Designed for piling in limited headroom like factories, under bridges, and tunnels.
Versatile Pile Compatibility: Fits steel sheets, H-beams, and pipes with a standard clamp seat for quick changes.
Self-Sufficient Operation: Completes piling independently without requiring cranes or additional support equipment.
Global Technical Support: 24/7 tech support and parts supply available worldwide for all machines.
ISO 9001:2015 Certified: Manufactured with strong materials ensuring high quality and low maintenance.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time?
A:
15-35 days ex-works. Optimized for SE Asia, India & Russia.
Q:Can the machine be customized to our fleet?
A:
Yes. Includes color scheme and logo.
Q:How is the quality and durability?
A:
ISO 9001:2015. Strong materials ensure low maintenance.
Q:Is it suitable for hard soil?
A:
Yes. High force & adjustable frequency for compact soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Korea Hydraulic Vibro Hammer for Efficient Sheet Pile Driving
US$14,000.00-14,500.00
1 Piece(MOQ)
Advanced Vibro Hammer for Efficient Construction Task Management
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Vibro Hammer for Efficient S350 Excavator Pile Driving
US$22,000.00-23,000.00
1 Piece(MOQ)
High Performance Vibro Hammer for Efficient Steel Sheet Pile Driving
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Heavy-Duty Hydraulic Piling Hammer with Innovative Dual Clamping System
US$100,000.00-10,000,000.00
1 Set(MOQ)
Dual Clamping Hammer for Enhanced Vibro Piling Performance
US$100,000.00-10,000,000.00
1 Set(MOQ)
Efficient for Cat320 8-12m Pile Driving Machine Side Clamp Vibro Hammer
US$23,400.00
1 Piece(MOQ)
Advanced Korean Vibro Hammer for Efficient Solar Pile Installation
US$22,000.00-23,000.00
1 Piece(MOQ)
Advanced Solar-Powered Hammer for Fast and Efficient Pile Driving
US$9,800.00-25,000.00
1 Piece(MOQ)
Premium Vibro Hammer for Efficient Pile Driving Solutions
US$20,000.00-22,000.00
1 Piece(MOQ)
Crane Type Electric Hammer for Efficient Heavy Duty Pile Driving
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Efficient Electric Vibro Hammer for Advanced Foundation Improvement
US$62,900.00-83,900.00
1 Piece(MOQ)
Heavy-Duty Vibro Pile Driving Hammer for Efficient Construction
US$22,000.00-23,000.00
1 Piece(MOQ)
Compact Vibro Hammer for Efficient Pile Driving in Limited Spaces
US$100,000.00-10,000,000.00
1 Set(MOQ)
High-Tech Vibro Hammer Pile Driver New Condition Long-Lasting Engine Core Motor Pump Crane for Driving Pipe in Pile Drivers
US$9,400.00-10,000.00
1 Piece(MOQ)
High-Tech Vibro Hammer Pile Driver New Condition with Long-Lasting Motor Includes Engine Pump Crane for Driving Pipe
US$9,400.00-10,000.00
1 Piece(MOQ)
Crane Type Electric Vibro Hammer for Efficient Pile Driving
US$57,000.00-60,000.00
1 Set/Sets(MOQ)
Excavator Pile Driving Machine - Vibro Hammer for Road and Bridge Construction
US$10,000.00
1 Piece(MOQ)


















