Powered by Made-in-China.com
Advanced Dynamic Side Grip Pile Driver for Foundation Challenges
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Low Clearance Capability: Side grip with dual clamping enables piling in minimal vertical clearance spaces.
360-Degree Continuous Rotation: Full rotation allows precise pile positioning from any angle for enhanced efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles without needing extra equipment.
Versatile Pile Compatibility: Accommodates sheet piles, H-beams, and pipes with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently.
ISO 9001:2015 Certified: Quality assured with high-strength materials for durability and minimal maintenance.
Customizable Color and Logo: Machine customization available to match fleet branding and color requirements.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time 15-35 days ex-works. Optimized logistics for SEA, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color and logo application.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 certified. High-strength materials ensure durability and minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty Sv-500 Side Grip Pile Driver for Strong Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Side Grip Pile Driver for Tough Terrain Applications
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
High-Performance Side Grip Pile Driver for Efficient Foundations
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Advanced Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Zyc120b Advanced Pile Driver for Foundation Stability
US$130,000.00
1 Set(MOQ)
Advanced Zyc100b-B1 Hydraulic Pile Driver for Strong Foundations
US$120,000.00
1 Set(MOQ)
150s Side Grip Vibro Pile Driver Vibro Hammer for Cat315 Excavator
US$17,900.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver for Small to Medium Foundations
US$300,000.00
1 Set(MOQ)
OEM/ODM Excavator Parts Side Grip Vibro Hammer Hydraulic Static Pile Driver for 12m Steel Piles Ms03 Ms08
US$9,999.00-21,900.00
1 Piece(MOQ)
ISO9001 Factory Hydraulic Side Grip Pile Driver for 20 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Attachment for 20 Ton Excavator with Side Grip
US$22,000.00
1 Piece(MOQ)
Juxiang Side Grip Hydraulic Pile Driver Designed for 30 Tons Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Heavy-Duty Juxiang Side Grip Pile Driver for 30-Ton Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Side Grip Vibro Hammer for Steel Sheet Pile Driver Hammer 20-30ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
20 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$10,000.00-15,000.00
1 Piece(MOQ)
30 Ton Excavator Attachment Vibratory Pile Driver for Steel Sheet Pile / H Beam with Side Grip
US$8,999.00-18,000.00
1 Piece(MOQ)
15 20 25 Ton Excavator Mounted Hydraulic Solar Pile Post Driver Vibro Hammer Side Grip Piling Machine Big Sheet Pile Driver for Fenders
US$12,000.00-15,000.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver Gear Rotating for Versatile Construction Tasks
US$25,000.00-25,300.00
1 sets(MOQ)



















