Powered by Made-in-China.com
Advanced Eccentric Hammer for Reliable Foundation Piling Solutions
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Enables precise pile positioning from any angle for enhanced efficiency.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating extra handling equipment.
Low Clearance Capability: Unique side grip design enables operations where top-drive hammers cannot work.
Versatile Pile Compatibility: Accommodates steel sheet, H-beams, and circular pipe piles with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction without cranes or support.
ISO 9001:2015 Certified: Ensures high quality and durability with high-strength materials.
Customizable Color and Logo: Machine can be customized to match your fleet's specific branding.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics for SE Asia, India, Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Includes color and logo.
Q:How is the machine's quality and durability assured?
A:
ISO 9001:2015 compliant. High-strength materials minimize maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High force & adjustable frequency for compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Eccentric Moment Vibro Hammer for Efficient Foundation Piling
US$100,000.00-10,000,000.00
1 Set(MOQ)
Eccentric Hammer for Superior Foundation Piling and Stability
US$100,000.00-10,000,000.00
1 Set(MOQ)
Powerful Electric Vibro Hammer for Reliable Foundation Improvement Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
Powerful Hydraulic Vibro Hammer for Efficient Foundation Installation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Eccentric Hammer for Rapid Foundation Installation Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Vibro Hammer for Reliable Foundation Piling Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
One-Stop Solution Multiple Piles Suitable Pile Driver Side Grip Vibro Hammer for Foundation Work
US$23,350.00
1 Piece(MOQ)
High-Performance Hydraulic Diesel Hammer for Solar Foundation Piling
US$9,800.00-25,000.00
1 Piece(MOQ)
Reliable Electric Pile Hammer for Effective Building Foundation Solutions
US$62,900.00-83,900.00
1 Piece(MOQ)
High-Performance Excavator Vibro Hammer for Quick Piling Solutions
US$20,000.00
1 Piece(MOQ)
Robust Excavator Hammer for Reliable Sheet Piling Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
Reliable Construction Vibratory Hammer for Excavators 30-40 Tons
US$16,500.00-22,000.00
1 Piece(MOQ)
Advanced Cylinder Tilting Hydraulic Vibro Hammer for Quick and Reliable Piling Tasks
US$22,000.00-23,000.00
1 Piece(MOQ)
Brand New High-Performance Box Type Excavator Hammer for Foundation Work
US$780.00-800.00
1 Piece(MOQ)
Durable Heavy-Duty Vibro Hammer for Reliable Foundation Pile Driving
US$62,900.00-83,900.00
1 Piece(MOQ)
Advanced Juxiang S350 Vibro Hammer for Effective Piling Solutions
US$22,000.00-23,000.00
1 Piece(MOQ)
Hydraulic Vibrator Pile Hammer for Construction Foundation
US$17,500.00-20,000.00
1 Piece(MOQ)
Electric Vibro Hammer: Reliable Heavy-Duty Hammer for Foundations
US$62,900.00-83,900.00
1 Piece(MOQ)
Diesel Hydraulic Impact Pile Hammer High Efficiency for Heavy Duty Foundation Piling
US$100,000.00-178,697.00
1 Set(MOQ)



















