Powered by Made-in-China.com
Advanced Side Grip Pile Driver with Enhanced Vibration Control
US$100,000.00-10,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
SV-400Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewEccentric Moment
6.6kgmCentrifugal Force
656 kNVibration Frequency
2300~3000 RpmSide Clamp Force
465kNBottom Clamp Force
520kNOperation Pressure
32 MPaWork Flow
280~360 L/MinWeight
3870 KgSuitable Excavator
32~40 TTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
360-Degree Continuous Rotation: Allows precise positioning from any angle without repositioning the excavator.
Dual Clamping System: Side and bottom clamps securely grip piles, eliminating need for extra handling equipment.
Low Clearance Capability: Enables piling in minimal clearance spaces where top-drive hammers cannot work.
Versatile Pile Compatibility: Accommodates steel sheets, H-beams, and pipes with quick changeovers.
Self-Sufficient Operation: Completes clamping, positioning, driving, and extraction independently without cranes.
ISO 9001:2015 Certified: Adherence to international quality standards ensures high durability.
1-Year Comprehensive Warranty: Covers mechanical defects with 24/7 global technical support and parts supply.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the minimum order quantity?
A:
MOQ is one set.
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Optimized logistics for Asia, India, Russia.
Q:Can the machine match our fleet?
A:
Yes. Customization includes color and logo.
Q:How is machine's quality assured?
A:
ISO 9001:2015 adherence. High-strength materials ensure durability.
Q:Is it suitable for hard soil in our area?
A:
Yes. High centrifugal force and frequency target compacted soils.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Versatile Low Clearance Side Grip Pile Driver with High-Performance Features
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Advanced Side Grip Pile Driver for Construction Projects
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Zyc600 Urban Pile Driver with Enhanced Vibration Control
US$278,600.00-279,000.00
1 Set(MOQ)
Heavy-Duty Side Grip Pile Driver with Advanced Vibration Control
US$100,000.00-10,000,000.00
1 Set(MOQ)
Heavy-Duty Sv-400 Side Grip Pile Driver with 360-Degree Rotation
US$100,000.00-10,000,000.00
1 Set(MOQ)
Advanced Hydraulic Pile Driver with Enhanced Vibration Control
US$12,000.00-12,500.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver with User-Friendly Control Interface
US$150,000.00
1 Set(MOQ)
30 Ton Excavator Attachment Vibratory Pile Driver for Steel Sheet Pile / H Beam with Side Grip
US$8,999.00-18,000.00
1 Piece(MOQ)
Advanced Zyc Hydraulic Pile Driver with Smart Control System
US$100,000.00-278,697.00
1 Set(MOQ)
Advanced Hydraulic Static Pile Driver with Smart Control System
US$125,000.00-268,000.00
1 Set(MOQ)
Hydraulic Pile Driver Attachment for 20 Ton Excavator with Side Grip
US$22,000.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver with Eccentric Control Technology
US$12,000.00-12,500.00
1 Piece(MOQ)
Excavator Vibro Pile Driver with Side Grip Clamp
US$25,000.00
1 Piece(MOQ)
High Efficiency Hydraulic Pile Driver with Side Grip for 25 Ton Excavator
US$22,000.00
1 Piece(MOQ)
Hydraulic Pile Driver Side Grip Vibro Hammer for Steel Sheet Pile Driver Hammer 20-30ton Excavator
US$12,000.00-15,000.00
1 Piece(MOQ)
20 Ton Excavator Mounted Hydraulic Side Grip Vibratory Pile Driver
US$22,000.00
1 Piece(MOQ)
Premium Side Grip Pile Driver Attachment for 30-Ton Excavators
US$33,000.00-35,000.00
1 Piece(MOQ)
OEM/ODM Excavator Parts Side Grip Vibro Hammer Hydraulic Static Pile Driver for 12m Steel Piles Ms03 Ms08
US$9,999.00-21,900.00
1 Piece(MOQ)
Heavy-Duty Excavator Mounted Pile Driver with High Vibration Speed
US$13,500.00-14,000.00
1 Piece(MOQ)
Handheld Flood Control Pile Driving Equipment with Small Volume and Simple Operation Portable Hydraulic Pile Driver
US$1,850.00-2,050.00
5 Pieces(MOQ)



















