Powered by Made-in-China.com
Construction Project Deep Foundation Piling Driver for Building Solutions
US$100,000.00-1,000,000.001 Set
Construction Project Deep Foundation Piling Driver for Building Solutions
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-600Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
818 kNEccentric Moment
10.2kgmOperation Pressure
32 MPaWork Flow
350 L/MinMax.Pile Length
21mSuitable Excavator
50~65tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Equipped with Parker motors and German bearings delivering up to 1064 kN force.
High-Clamping Cast Steel Gripper: Max clamping force up to 650 kN with 160-180 oil cylinders.
Intelligent Electronic Control: Optimizes performance, extends lifespan, and improves precision and safety.
ISO 9001:2015 Certified: Ensures high quality and durability with minimal maintenance.
12 Months Warranty: Standard warranty coverage for peace of mind.
24/7 Global Support: Technical assistance and spare parts available around the clock.
Customizable Configurations: Available upon request for tailored project needs.
Versatile Applications: Suitable for deep excavations, bridges, ports, and marine projects.
Company profile

Importers and ExportersYears of Export ExperienceCustomization from DesignsR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.95h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, & Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme & logo.
Q:How is the machine's quality and durability assured?
A:
We follow ISO 9001:2015. High-strength materials ensure durability & minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force & adjustable frequency target compacted soils effectively.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
0/4000
Supplier replies will be sent to your registered email
You may also like
Deep Foundation Piling Rig with Precision Driver for Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
High Efficiency Hydraulic Pile Driver for Construction Projects and Foundation Work
US$100,000.00-10,000,000.00
1 Set(MOQ)
Reliable Hydraulic Vibratory Pile Driver for Building Construction Projects
US$8,000.00-16,500.00
1 Set(MOQ)
Heavy-Duty Deep Foundation Driver for Excavators and Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Heavy-Duty Excavator Foundation Driver for Deep Ground Construction Projects
US$100,000.00-1,000,000.00
1 Set(MOQ)
Urban Hydraulic Foundation Pile Driver for Medium Construction Projects
US$120,000.00-478,697.00
1 Set(MOQ)
Heavy Duty Hydraulic Vibratory Pile Driver for Deep Foundation Construction Works
US$11,040.00
1 Piece(MOQ)
Hydraulic Pile Driver 120t: Designed for Efficient Piling Solutions
US$261,000.00-270,000.00
1 Set(MOQ)
120t Hydraulic Pile Driver for Robust Small Piling Solutions
US$261,000.00-270,000.00
1 Set(MOQ)
Jzl60 Hydraulic Pile Driver: Ultimate Solution for Construction Projects
US$155,000.00-160,000.00
1 Piece(MOQ)
Goodeng Hydraulic Static Pile Driver Foundation Construction Piling Equipment for Construction GPY208
US$180,000.00-210,000.00
1 Piece(MOQ)
Mini Excavator Hydraulic Pile Driver for Small Scale Foundation Construction Projects
US$11,040.00
1 Piece(MOQ)
Goodeng GPY328 Hydraulic Static Pile Driver for Foundation Piling Construction Equipment
US$250,000.00-350,000.00
1 Piece(MOQ)
Powerful Hydraulic Pile Driver for Fast Construction Projects
US$12,000.00-14,500.00
1 Piece(MOQ)
High - Power Hydraulic Vibratory Pile Driver for Large - Scale Construction Projects
US$8,000.00-16,500.00
1 Set(MOQ)
Hydraulic Pile Driver for Foundation Construction Projects
US$15,880.00-18,500.00
1 Piece(MOQ)
Hot Sale Mobile Photovoltaic Pile Driver for Solar Panel Project Construction Machinery
US$10,000.00-39,800.00
1 Set(MOQ)
Crawler Solar Pile Driver with Hydraulic Hammer: Experience Powerful and Precise Piling for Deep Foundation Projects
US$16,999.00-26,999.00
1 Piece(MOQ)



















