Powered by Made-in-China.com
Deep Foundation Piling Rig and Advanced Electronic Control Driver
US$100,000.00-1,000,000.00
1 Set
Product profile
After-sales Service
Technical SupportsWarranty
1 YearType
Vibration Piling MachineModel NO.
FV-600Pressure Pile Driver Type
Hydraulic Pile DriverPile Hammer Type
Hydraulic HammerPower Source
Hydraulic SystemMotor Power
170.7kwNoise
With NoiseCertification
ISO 9001:2015Condition
NewVibration Frequency
2800 RpmCentrifugal Force
818 kNEccentric Moment
10.2kgmOperation Pressure
32 MPaWork Flow
350 L/MinMax.Pile Length
21mSuitable Excavator
50~65tTransport Package
Wooden BoxTrademark
VIBRAOrigin
Shanghai ChinaHS Code
8430100000Production Capacity
20 Set/MonthKey features
Superior Vibration Power: Delivers up to 1064 kN force using Parker motors and German bearings.
High-Clamping Cast Steel Gripper: Strong clamps with 160-180 cylinders offer max clamping force of 650 kN.
Intelligent Electronic Control: Next-gen system enhances performance, lifespan, precision, and safety.
Versatile Application Scenarios: Ideal for bridges, ports, marine, urban infrastructure, and heavy civil engineering.
ISO 9001:2015 Certified: Quality assured through strict adherence to international standards.
Global Technical Support: 24/7 support and spare parts supply available worldwide.
Customizable Configurations: Color scheme and logo application available upon request.
Multiple Model Options: Available in FV-500 to FV-900 series with varying pile lengths and forces.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedCustomization Options: Customization from Designs, Full Customization, etc. CertifiedExport Year: 11 Years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤0.01h CertifiedTerms of Payment: LC, T/T
About Our Factory & Business Background
AddressNo. 3652, Caoan Road, Jiading District, Shanghai, China
Plant Area700 square meters
Number of Employees16
Registered Capital5,000,000 RMB
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Minimum Order Quantity1 Set
Supply Chain Partners92
Our Production Capability & Technical Expertise
Main ProductsPile Driver, Hydraulic Impact Hammer, Hydraulic Pile Driver, Electric Vibratory Hammer, Hydraulic Pile Breaker, Four Eccentric Pile Driver, 360 Degree Pile Driver, Dd Guide-Rod Diesel Pile Hammer, Side Grip Pile Driver, V+Auger
Production Lines1
Production MachinesAssembling Line, Painting Line
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2014-06-20
Main MarketsEurope, Southeast Asia/ Mideast, Domestic, Middle Aisa
Repeat Buyers Choice10%~30%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500No
Product Q&A
Q:What is the delivery lead time to our region?
A:
Lead time is 15-35 days ex-works. Logistics optimized for Southeast Asia, India, and Russia.
Q:Can the machine be customized to match our fleet?
A:
Yes. Customization includes color scheme and logo application.
Q:How is the machine's quality and durability assured?
A:
We adhere to ISO 9001:2015. High-strength materials and a durable frame ensure minimal maintenance.
Q:Is it suitable for the hard soil conditions in our area?
A:
Yes. High centrifugal force and adjustable frequency effectively target compacted soils and mixed layers.
Send Inquiry
*To:
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.
SHANGHAI YEKUN CONSTRUCTION MACHINERY CO., LTD.*Content:
Supplier replies will be sent to your registered email
You may also like
Deep Foundation Piling Rig and Electronic Control Driver for Efficiency
US$100,000.00-1,000,000.00
1 Set(MOQ)
Electronic Control Driver for Efficient Deep Foundation Piling Applications
US$100,000.00-1,000,000.00
1 Set(MOQ)
SDLQ full hydraulic drill rig machine for electric tower foundations, bridge works, and road engineering rotary pile driver
US$70,000.00-80,000.00
1 Piece(MOQ)
Deep Foundation Piling Rig and Intelligent Driver for Efficient Operations
US$100,000.00-1,000,000.00
1 Set(MOQ)
Advanced Intelligent Driver for Efficient Deep Foundation Piling Solutions
US$100,000.00-1,000,000.00
1 Set(MOQ)
Advanced Versatile Drill Rig Static Pile Driver for Efficient Piling Operations Heavy Construction Equipment
US$261,000.00-270,000.00
1 Set(MOQ)
Piling Driving Rig Free Fall Hammer Pile Driver
US$36,000.00-53,000.00
1 Piece(MOQ)
Free Fall Drop Hammer Pile Driver Piling Rig
US$36,000.00-53,000.00
1 Piece(MOQ)
Diesel Engine Photovoltaic Drill Piling Rig Borehole Solar Screw Hydraulic Pile Driver
US$10,000.00-39,800.00
1 Set(MOQ)
Hydraulic Piling Rig Machine Photovoltaic Solar Panel Vibratory Pounder Pile Driver
US$10,000.00-39,800.00
1 Set(MOQ)
SDLQ LQ180-15 Deep Foundation Borehole Wheel drilling rig high efficiency pile driver
US$30,000.00-36,000.00
1 Piece(MOQ)
Crawler Solar Pile Driver with Hydraulic Hammer: Experience Powerful and Precise Piling for Deep Foundation Projects
US$16,999.00-26,999.00
1 Piece(MOQ)
Advanced Hydraulic Pile Driver for Bridge and Foundation Construction
US$300,000.00
1 Set(MOQ)
Hydraulic Rotating Vibratory Pile Driver for Deep Foundation and Tight Corners
US$23,300.00
1 Piece(MOQ)
Goodeng Machine Hydraulic Static Piling Driver HSPD GPY208 Piling Machine for Foundations
US$310,000.00-330,000.00
1 Set(MOQ)
New Mini Small Hydraulic Pile Drivers and Piling Machine for Construction Foundation to Press The Pile
US$19,900.00-22,999.00
1 Piece(MOQ)
Reliable and Efficient Hydraulic Pile Driver for Deep Drilling up to 30m with ISO 9001: 2000
US$50,000.00-55,000.00
1 Set(MOQ)
Electric Punching Pile Driver for Rock and Stone Foundation
US$5,000.00-6,000.00
1 Set(MOQ)



















